COMPANY RECORD · NEW YORK, NY
M. Spinelli Plb & Htg Inc — permit history in New York, NY
M. Spinelli Plb & Htg Inc appears on 86 New York permit records from 2019 through 2026, most often plumbing (94.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 86 | 94.5% |
| Fire protection | 5 | 5.5% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 5 |
| 2020 | 18 |
| 2021 | 17 |
| 2022 | 16 |
| 2023 | 12 |
| 2024 | 11 |
| 2025 | 11 |
| 2026 | 1 |
Busiest year on record: 2020, with 18 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Volmar Construction Inc | 6 | 2025-12-19 |
| Bellwood Ny Inc | 2 | 2024-12-16 |
| Dkc Inc | 2 | 2025-04-15 |
| Gridspan Corporation | 2 | 2024-11-06 |
| Hudson Black Inc | 2 | 2024-04-24 |
| Reds Properties LLC | 2 | 2025-01-16 |
| Superman Contracting Corp | 2 | 2022-03-31 |
| The Manlyn Development Gr | 2 | 2026-03-02 |
| Biba Construction Inc | 1 | 2024-11-07 |
| Congroup LLC | 1 | 2024-07-11 |
| Mksskr Consulting Service | 1 | 2025-03-20 |
| Norwood Design& Build Inc | 1 | 2024-05-02 |
15 companies are named alongside M. Spinelli Plb & Htg Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 13-28 133 PLACE | 2026-03-02 |
| 147-27 15 DRIVE | 2025-12-19 |
| 132-37 14 AVENUE | 2025-10-20 |
| 71 EAST 94 STREET | 2025-07-08 |
| 255 EASTERN PARKWAY | 2025-06-10 |
| 53 NORTH MOORE STREET | 2025-04-15 |
| 410 GATEWAY DRIVE | 2025-03-21 |
| 311 EAST 140 STREET | 2025-03-20 |
| 1 PIERREPONT STREET | 2025-03-19 |
| 8414 60 AVENUE | 2025-01-16 |
| 320 16 STREET | 2025-01-07 |
| 149 LUDLOW STREET | 2024-12-16 |
| 35 JANE STREET | 2024-11-07 |
| 605 SHEPHERD AVENUE | 2024-11-06 |
82 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $173,000, median $25,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
86 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q00966795-S4-PL | 2026-03-02 | Plumbing | 13-28 133 PLACE | APPLICATION HEREWITH FILED FOR PLUMBING WORK RELATED TO APPLICATION Q00966795-I1. NO CHANGE IN OCCUPANCY USE, EGRESS OR BULK. | $0 |
| Q01043753-S2-PL | 2025-12-19 | Plumbing | 147-27 15 DRIVE | REMOVE 2 WATER CLOSETS, 1 LAV, 4 FD, & 1 SINK .INSTALL 1 SINK & A NEW HOT WATER RE-CIRCULATION LINE. | $25,000 |
| Q00914342-S8-PL | 2025-10-20 | Plumbing | 132-37 14 AVENUE | APPLICATION HEREWITH FILED FOR PLUMBING WORK IN CONJUNCTION WITH Q00914342-I1. NO CHANGE IN OCCUPANCY, USE OR EGRESS. | $45,000 |
| M01149946-S1-PL | 2025-07-08 | Plumbing | 71 EAST 94 STREET | Plumbing work associated with Playground renovation as shown on drawings filed herewith. No change in occupancy, use or egress. | $15,000 |
| M01149946-S2-PL | 2025-06-11 | Plumbing | 71 EAST 94 STREET | INSTALLATION OF DRAINAGE STRUCTURES AND ASSOCIATED PIPING WITHIN THE HUNTER COLLEGE CAMPUS SCHOOL PLAYGROUND LOCATED AT 71 EAST 94TH STREET, NEW YORK, NY AS SHOWN ON DRAWINGS FILE | $32,000 |
| B01051220-S1-PL | 2025-06-10 | Plumbing | 255 EASTERN PARKWAY | PROPOSED PLUMBING WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. | $30,000 |
| M01171965-S1-PL | 2025-04-15 | Plumbing | 53 NORTH MOORE STREET | PLUMBING MODIFICATION WORK INCLUDED IN SCOPE FILED UNDER SUBSEQUENT APPLICATION AS REQUIRED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $40,000 |
| B01141276-I1-PL | 2025-03-21 | Plumbing | 410 GATEWAY DRIVE | Alterations to existing plumbing systems as per plans filed herewith. | $70,000 |
| X00824658-S2-PL | 2025-03-20 | Plumbing | 311 EAST 140 STREET | PLUMBING WORK RELATED TO CHANGE OF USE AND OCCUPANCY IN CELLAR | $8,000 |
| B01110746-I1-PL | 2025-03-19 | Plumbing | 1 PIERREPONT STREET | INTERIOR PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $30,000 |
| Q00818936-S1-PL | 2025-01-16 | Plumbing | 8414 60 AVENUE | PL WORKTYPE IN CONJUNCTION W APPLICATION #Q00818936-I1 | $15,000 |
| B01027582-I1-PL | 2025-01-07 | Plumbing | 320 16 STREET | Renovation of two-family townhouse, including domestic water, sanitary waste piping work, and replacement of existing gas dryer as per plan in conjunction with Arch. design . No ch | $23,000 |
| M00614840-S1-PL | 2024-12-16 | Plumbing | 149 LUDLOW STREET | Modification of existing plumbing system. No change in use, occupancy or egress | $66,500 |
| M00819770-S3-PL | 2024-11-07 | Plumbing | 35 JANE STREET | PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION RENOVATIONS. | $41,000 |
| B00650342-S1-PL | 2024-11-06 | Plumbing | 605 SHEPHERD AVENUE | Adding a new sink, floor drain and hose bibb for a Hydroponic Lab (rooms 316 & 318) | $15,000 |
| M00955807-S1-PL | 2024-07-30 | Plumbing | 61 JANE STREET | Renovation of Kitchen & Bathroom in Apartment 15G. No change in Use, Egress or Occupancy. | $40,000 |
| M01019759-S1-PL | 2024-07-11 | Plumbing | 1270 AVENUE OF THE AMERICAS | INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01019759-I1 AS PER THE DRAWINGS FILED HEREIN. | $7,500 |
| M00910711-S1-PL | 2024-05-02 | Plumbing | 830 PARK AVENUE | Plumbing work associated with interior renovation. No change of use, occupancy, or egress this application. | $26,600 |
| B00898766-S2-PL | 2024-04-24 | Plumbing | 559 FULTON STREET | HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES IN RELATION TO TENANT FIT OUT. NO CHANGE TO USE OCCUPANCY OR EGRESS. | $18,392 |
| B00637559-S1-PL | 2024-04-16 | Plumbing | 345 VAN SICKLEN STREET | Related drainage work. | $113,000 |
| B07997159-S1-PL | 2024-03-11 | Plumbing | 850 GRAND STREET | STORM DRAINAGE SYSTEM FOR 4 DUGOUTS AND 3 ADA RAMPS. 2 DUGOUTS & 1 TD ARE DRAINED THROUGH A DUPLEX SUMP PUMP AT THE WEST GRANDSTAND, AND 2 DUGOUTS & 2 TD ARE DRAINED THROUGH A DUPL | $173,000 |
| M00981513-I1-PL | 2024-02-05 | Plumbing | 75 WALL STREET | PLUMBING WORK FOR INTERIOR TENANT FIT-OUT RENOVATIONS FOR COMMERCIAL SPACE NAYA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $65,000 |
| S00971478-S2-PL | 2024-01-11 | Plumbing | 2865 RICHMOND AVENUE | Minor plumbing work related to General renovation of existing retail space. No change to use, egress or occupancy. | $51,800 |
| B00942935-I1-PL | 2023-11-14 | Plumbing | 215 PACIFIC STREET | HEYDAY-- PLUMBING INSTALLATIONS FOR NEW SKINCARE STUDIO AS PER PLANS FILED. | $40,000 |
| M00934170-I1-PL | 2023-10-24 | Plumbing | 102 MADISON AVENUE | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $42,400 |
| M00934170-I1-PL | 2023-10-24 | Fire protection | 102 MADISON AVENUE | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $42,400 |
| Q00912086-S3-PL | 2023-09-22 | Plumbing | 175-06 HILLSIDE AVENUE | HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $40,500 |
| M00886859-S1-PL | 2023-08-25 | Plumbing | 248 MERCER STREET | Associated plumbing application for installation | $21,000 |
| Q00910033-S1-PL | 2023-08-14 | Plumbing | 4830 65 STREET | INSTALL SUMP PUMP IN BASEMENT | $2,000 |
| X00860878-I1-PL | 2023-06-13 | Plumbing | 1820 WILLIAMSBRIDGE ROAD | HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS. | $18,392 |
| B00637565-S1-PL | 2023-05-31 | Plumbing | 1875 EAST 17 STREET | Related drainage work. | $39,000 |
| B00845989-I1-PL | 2023-04-26 | Plumbing | 241 BRIGHTON BEACH AVENUE | FILE PLUMBING WORK IN CONJUNCTION WITH ALT II JOB NO. B00789846, INSTALL NEW PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $51,000 |
| M08054038-I1-PL | 2023-03-29 | Plumbing | 830 PARK AVENUE | Renovation of existing Apt#1-2B. Installation of bathroom and kitchen fixtures. No change of, use, egress or occupancy under this application. | $70,000 |
| Q00656254-I1-PL | 2023-03-09 | Plumbing | 38-05 UNION STREET | Filing herewith plumbing work as per plans filed herewith. No change to use, egress or occupancy. | $5,000 |
| M08041791-I1-PL | 2023-03-08 | Plumbing | 2853 BROADWAY | INSTALL 1 WC, 1 LAV, 2 BACKFLOW PREVENTORS (SECONDARY), 5 SINKS, 11 FLOOR DRAINS, 1 HWH, 2 GREASE TRAP OIL SEPARATORS, 1 WATER PIPING & 1 SANITARY PIPING ON 1ST FLOOR. | $67,000 |
| B00497238-I1-PL | 2022-10-14 | Plumbing | 439 EAST 42 STREET | FILING HEREWITH FOR FOR EXISTING SINGLE FAMILY HOME RENOVATIONAPPLICATION TYPE, ALT-2 FOR PLUMBING WORK INSUPPORT OF OT APPLICATION FOR RENOVATION AS SHOWN ON PLANS | $24,000 |
| B00721429-I1-PL | 2022-09-30 | Plumbing | 727 QUINCY STREET | PROPOSE PLUMBING WORK FOR INTERIOR RENOVATION OF SECOND FLOOR APARTMENT UNIT TO MODIFY EXISTING PLUMBING AND GAS FIXTURES AS PER PLAN. FILED IN CONJUNCTION WITH GC JOB # B00720092- | $17,000 |
| M00703541-I1-PL | 2022-09-03 | Plumbing | 92 HORATIO STREET | PARTIAL RENOVATION OF 3RD FLOOR SPACE. INTERIOR REMOVAL OF EXISTING NON-STRUCTURAL PARTITIONS & FLOOR FINISHES. INSTALLATION OF NEW NON-STRUCTURAL PARTITIONS AND FLOORING NO CHANGE | $5,000 |
| M00749378-I1-PL | 2022-07-25 | Plumbing | 220 FIFTH AVENUE | PLUMBING AND SPRINKLER WORKS AS SHOWN IN PLANS ON THE 4TH FLOOR OFFICE SPACE. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $100,000 |
| M00749378-I1-PL | 2022-07-25 | Fire protection | 220 FIFTH AVENUE | PLUMBING AND SPRINKLER WORKS AS SHOWN IN PLANS ON THE 4TH FLOOR OFFICE SPACE. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $100,000 |
| M00747537-I1-PL | 2022-07-19 | Plumbing | 220 5 AVENUE | PLUMBING WORKS AS SHOWN IN PLANS ON THE 10TH FLOOR OFFICE SPACE. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $45,000 |
| B00637567-S1-PL | 2022-07-05 | Plumbing | 1633 EAST 8 STREET | Related drainage work. | $104,000 |
| M00663350-I1-PL | 2022-06-28 | Plumbing | 463 7 AVENUE | INSTALL 1 WC, 1 LAV, 2 BACKFLOW PREVENTORS (SECONDARY), 5 SINKS, 12 FLOOR DRAINS, 2 GREASE TRAP OIL SEPARATORS, 1 WATER PIPING & 1 SANITARY PIPING ON 1ST FLOOR. INSTALL 1 HWH NON G | $58,000 |
| M00740207-I1-PL | 2022-05-30 | Plumbing | 246 5 AVENUE | Plumbing work associated with build-out of existing store. No Change in Use, Egress, or Occupancy. | $24,000 |
| M00712835-I1-PL | 2022-04-28 | Plumbing | 78 FIFTH AVENUE | Plumbing work at cellar, 1st and Mezzanine indicated on drawings filed herewith No change in Use Egress or Occupancy under this application | $42,000 |
| M00658429-S1-PL | 2022-03-31 | Plumbing | 130 EAST 63 STREET | Interior plumbing renovations to existing apartment unit. No change in use, egress or occupancy | $24,000 |
| B00456478-I1-PL | 2022-03-17 | Plumbing | 79 NORTH 11 STREET | HEREWITH FILING MODIFCATIONS TO THE EXISTING PLUMBING SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $20,000 |
| B00651942-I1-PL | 2022-03-09 | Plumbing | 479 RALPH AVENUE | FILE PLUMBING WORK FOR INTERIOR RENOVATION OF EXISTING FIRST FLOOR COMMERICAL SPACE ONLY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $5,000 |
| B00663050-I1-PL | 2022-02-08 | Plumbing | 32 34 STREET | INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION W/ COMMERCIAL BUILDOUT FILED UNDER ALT II #322004380. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $27,000 |
| Q00471779-S1-PL | 2022-01-31 | Plumbing | 90-29 48 AVENUE | SUBSEQUENT FILING TO AMEND PLUMBING PLANS AND GAS WORK INFORMATION. S1 APPLICATION IN CONJUNCTION WITH I1 APPLICATION. | $0 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
