COMPANY RECORD · NEW YORK, NY
Avarga Construction Corp — permit history in New York, NY
Avarga Construction Corp appears on 103 New York permit records from 2021 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 103 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 11 |
| 2022 | 14 |
| 2023 | 27 |
| 2024 | 17 |
| 2025 | 23 |
| 2026 | 11 |
Busiest year on record: 2023, with 27 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Pasquale Quaratino Inc | 1 | 2026-07-24 |
| Rugova Group LLC | 1 | 2025-01-07 |
2 companies are named alongside Avarga Construction Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 124 MACDOUGAL STREET | 2026-07-23 |
| 515 MADISON AVENUE | 2026-06-25 |
| 205 AVENUE C | 2026-05-21 |
| 36 EXCHANGE PLACE | 2026-04-21 |
| 252 WEST 38 STREET | 2026-04-14 |
| 262 WEST 38 STREET | 2026-04-07 |
| 635 EAST 12 STREET | 2026-04-07 |
| 520 8 AVENUE | 2026-03-18 |
| 3135 JOHNSON AVENUE | 2026-03-10 |
| 1827 2 AVENUE | 2026-02-11 |
| 1825 2 AVENUE | 2026-01-08 |
| 100 STEUBEN STREET | 2025-12-23 |
| 2340 5 AVENUE | 2025-12-17 |
| 85 LIVINGSTON STREET | 2025-12-09 |
92 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $3,283,000, median $185,824. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
103 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01376132-I1-GC | 2026-07-23 | General construction | 124 MACDOUGAL STREET | Facade restoration project to include masonry, pointing, sills, lintels, cornices, and cast stone. Scrape, prime, and paint the fire escapes, replace the main and bulkhead roof. (R | $773,255 |
| M01350866-I1-GC | 2026-06-25 | General construction | 515 MADISON AVENUE | Facade repairs including brick replacement, concrete patching and repair as per plans filed. No change in use, egress or occupancy | $286,660 |
| M01348862-I1-GC | 2026-05-21 | General construction | 205 AVENUE C | HEREBY FILING EXTERIOR FACADE RESTORATION WORK (RELATED TO FISP CYCLE 9) AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $196,855 |
| M01326925-I1-GC | 2026-04-21 | General construction | 36 EXCHANGE PLACE | Facade modifications for hoist run. No change in use, zoning, or egress. | $150,220 |
| M01296939-I1-GC | 2026-04-14 | General construction | 252 WEST 38 STREET | FACADE REPAIRS AS PER PLANS FILED. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION. | $190,500 |
| M01296948-I1-GC | 2026-04-07 | General construction | 262 WEST 38 STREET | FACADE REPAIRS AS PER PLANS FILED. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION. | $407,000 |
| M01348811-I1-GC | 2026-04-07 | General construction | 635 EAST 12 STREET | HEREBY FILING EXTERIOR FACADE RESTORATION WORK (RELATED TO FISP CYCLE 9) AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $179,930 |
| M01259646-I1-GC | 2026-03-18 | General construction | 520 8 AVENUE | Facade repairs include, but not limited to brick repair, repointing, lintel repair & waterproofing, stone repair, terra cotta repointing, sill replacement as per plans filed. No c | $491,059 |
| X01303868-I1-GC-CX | 2026-03-10 | General construction | 3135 JOHNSON AVENUE | REPLACEMENT OF WATERPROOFING MEMBRANE AT EXIST. POOLDECK. PATCHING OF CONCRETE CRACKS AND SPALLS AT THECRAWL SPACE UNDER THE POOL DECK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $178,600 |
| M01147516-I1-GC | 2026-02-11 | General construction | 1827 2 AVENUE | REPAIR WORK TO THE EXISTING FACADE, PARAPETS AND LIGHTWELLS. NEW ROOF WATERPROOFING TO BE INSTALLED. | $250,000 |
| M01120023-I1-GC | 2026-01-08 | General construction | 1825 2 AVENUE | REPAIR WORK TO THE EXISTING FACADE, PARAPETS AND LIGHTWELLS. NEW ROOF WATERPROOFING TO BE INSTALLED. | $250,000 |
| B01307936-I1-GC | 2025-12-23 | General construction | 100 STEUBEN STREET | facade repair as per plans filed. no change in use egress or occupancy | $99,996 |
| M01245933-I1-ST | 2025-12-17 | General construction | 2340 5 AVENUE | Interior concrete repair work. No change of use, egress or occupancy. | $231,000 |
| B01294804-I1-GC | 2025-12-09 | General construction | 85 LIVINGSTON STREET | Sound all concrete surfaces in the garage, remove damaged concrete, and patch. Replace damaged floor coatings, repair, and repoint masonry, remove and replace sealant, and remove a | $1,630,143 |
| M01286852-I1-GC-CX | 2025-11-25 | General construction | 347 5 AVENUE | Structural reinforcement of existing fire stairs, masonry repairs. | $100,000 |
| Q01264276-I1-GC | 2025-11-12 | General construction | 83-33 AUSTIN STREET | FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $264,690 |
| M01173723-I1-GC-CX | 2025-09-19 | General construction | 40 EXCHANGE PLACE | facade repair | $400,000 |
| B01135763-I1-GC | 2025-09-10 | General construction | 96 STEUBEN STREET | Limited Facade Repairs, no change in use, egress or occupancy. | $325,320 |
| B01122989-I1-GC | 2025-09-05 | General construction | 97 GRAND AVENUE | Limited Facade Repairs, no change in use, egress or occupancy. | $247,580 |
| M01210470-I1-GC | 2025-07-28 | General construction | 240 EAST 55 STREET | FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $106,241 |
| M01245933-I1-GC | 2025-07-17 | General construction | 2340 5 AVENUE | Interior concrete repair work. No change of use, egress or occupancy. | $231,000 |
| M01117918-I1-GC | 2025-07-10 | General construction | 252 WEST 85 STREET | Facade repairs, including masonry restoration and replacement, with no changes to use, egress, or occupancy. | $150,000 |
| X01156287-I1-GC-CX | 2025-06-16 | General construction | 3850 HUDSON MANOR TERRACE | Garage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces. | $175,000 |
| M01178369-I1-GC | 2025-05-27 | General construction | 110 HUDSON STREET | Facade repairs as per plans; no change to use, egress, or occupancy. | $41,295 |
| Q01210744-I1-GC-CX | 2025-05-21 | General construction | 118-11 84 AVENUE | PROPOSED GARAGE REPAIRS & CONCRETE & STEEL REPAIRIS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $400,000 |
| M01194415-I1-GC | 2025-04-28 | General construction | 363 EAST 76 STREET | 9TH CYCLE FISP REPAIRS INCLUDING CONCRETE REPAIRS, SEALANT REPLACEMENT AND BRICK REPOINTING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $24,075 |
| M01158789-I1-GC | 2025-04-10 | General construction | 171 MADISON AVENUE | facade repair, Masonry Replacement and Terracotta Patching as per plans filed. No change in use egress or occupancy. | $67,500 |
| M01162625-I1-GC | 2025-03-31 | General construction | 171 EAST 89 STREET | Brick masonry repairs, repointing and lintel restoration per plans submitted herewith. No change in use, egress or occupancy. | $29,885 |
| M01097787-I1-GC | 2025-03-31 | General construction | 45 WEST 45 STREET | Exterior Facade repairs as per the plans filed including: Removal and replacement of cracked/spalled masonry units, joint sealant, terra-cotta units, steel lintels, precast coping | $400,000 |
| M01147610-I1-GC | 2025-03-25 | General construction | 270 WEST 17 STREET | Roof membrane replacement at the 2nd and 7th-floor terraces, facade repairs per plans. | $1,271,732 |
| B00923944-I1-GC | 2025-03-20 | General construction | 330 WYTHE AVENUE | Facade repair | $199,785 |
| M01076295-I1-GC | 2025-03-05 | General construction | 10 ASTOR PLACE | FACADE REPAIRS TO INCLUDE CAST IRON REPAIRS, MASONRY REPAIRS, SHEET METAL REPAIRS, WOOD WINDOW FRAME REPAIRS, RAILING INSTALLATION & COPING STONES REPLACEMENT. NO CHANGE IN USE, EG | $713,410 |
| M01145661-I1-GC | 2025-02-28 | General construction | 111 EAST 75 STREET | FACADE REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $118,532 |
| M01134371-I1-GC | 2025-02-05 | General construction | 440 LAFAYETTE STREET | Facade repairs will include cast iron repairs, glazing replacement, masonry repairs, sheet metal repairs, railing installation and parapet reconstruction. No change in use, egress | $884,445 |
| X01105570-I1-GC | 2024-12-20 | General construction | 2400 JOHNSON AVENUE | Replace roofing system at existing swimming pool enclosure located at the cellar level as per plans. There will be no changes to use, egress, or occupancy. | $181,400 |
| X01109349-I1-GC | 2024-12-20 | General construction | 2400 JOHNSON AVENUE | Interior renovation at the swimming pool area, as per plans filed herewith. No changes in use, egress, or occupancy. | $105,970 |
| M01030077-I1-GC | 2024-11-04 | General construction | 300 WEST 72 STREET | FACADE REPAIRS: BRICK REPLACEMENT & POINTING, LINTEL REPLACEMENT, WINDOW CAULKING. NO CHANGE IN USE, EGRESS OR OCCUPANCY, | $140,000 |
| M01097801-I1-GC | 2024-10-18 | General construction | 125 WEST 25 STREET | Exterior Facade repairs as per the plans filed including: Removal and replacement of cracked/spalled masonry units, joint sealant, steel lintels, stone, stone & slate still and win | $600,000 |
| M01078006-I1-GC | 2024-10-10 | General construction | 50 PRINCE STREET | Exterior Facade Repairs including repointing, localized brick replacement, and lintel servicing. | $316,700 |
| M01103334-I1-GC | 2024-09-25 | General construction | 5 WEST 127 STREET | Facade repairs. No change to use, occupancy, or egress. | $12,025 |
| M01055579-I1-GC | 2024-09-17 | General construction | 305 7 AVENUE | facade repairs including masonry and terracotta replacement and repairs, balcony edge replacement and concrete repairs as per plans filed. No change in use, egress or occupancy. | $134,720 |
| M01013867-I1-GC | 2024-08-26 | General construction | 135 EAST 54 STREET | FACADE REPAIR PER PLAN TO COMPLY WITH LL 11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $484,700 |
| M00828838-I1-GC | 2024-08-20 | General construction | 282 CABRINI BOULEVARD | FACADE AND ROOF REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $575,640 |
| M01057564-I1-GC | 2024-08-16 | General construction | 245 EAST 84 STREET | CYCLE 9TH FISP REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $13,449 |
| M00848969-I1-GC | 2024-07-30 | General construction | 660 FORT WASHINGTON AVENUE | Facade repairs. No change in use, egress, or occupancy. | $398,773 |
| M00847925-I1-GC | 2024-07-29 | General construction | 640 FORT WASHINGTON AVENUE | Facade repairs. No change in use, egress, or occupancy. | $350,026 |
| M01057713-I1-GC | 2024-07-29 | General construction | 228 EAST 85 STREET | CYCLE 9TH FISP REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $26,835 |
| M01067044-I1-GC | 2024-07-15 | General construction | 3500 BROADWAY | INTERIOR RENOVATION OF RETAIL SPACE FOR RESTAURANT ON CELLAR AND FIRST FLOOR. NEW PARTITIONS, FLOOR, SUSPENDED CEILING, TOILET, KITCHEN EQUIPMENT AND VENTILATION HOOD. | $180,000 |
| B00893849-I1-GC | 2024-05-15 | General construction | 79 CLIFTON PLACE | INSTALLATION OF WOOD ROOF DECKS | $50,000 |
| B01008761-I1-GC | 2024-05-03 | General construction | 180 BAINBRIDGE STREET | Exterior facade work and repairs as necessary including interior waterproofing at cellar. No change in use, occupancy or egress proposed under this application. | $205,330 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →