COMPANY RECORD · NEW YORK, NY
Aqua Plumbing & Htng Corp — permit history in New York, NY
Aqua Plumbing & Htng Corp appears on 219 New York permit records from 2019 through 2026, most often plumbing (94% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 219 | 94% |
| Fire protection | 14 | 6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 7 |
| 2020 | 23 |
| 2021 | 41 |
| 2022 | 55 |
| 2023 | 28 |
| 2024 | 36 |
| 2025 | 29 |
| 2026 | 14 |
Busiest year on record: 2022, with 55 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Precision Worldwide | 16 | 2026-04-14 |
| Tauland Kitchen & Bath In | 5 | 2026-02-26 |
| Es Builders Group LLC | 5 | 2025-11-07 |
| Signature Construction Gr | 4 | 2025-08-05 |
| K-Four Construction Corp | 4 | 2026-06-02 |
| Tower Properties Mgmt.Co | 3 | 2026-07-29 |
| Demartino Constr. Co. Inc | 3 | 2026-02-11 |
| Storage Construction Co | 3 | 2024-09-30 |
| Cns Construction Inc | 2 | 2023-08-23 |
| Constructomics LLC | 2 | 2025-07-23 |
| Pinnacle Commercial Devel | 2 | 2025-10-02 |
| Senter Management LLC | 2 | 2022-04-27 |
30 companies are named alongside Aqua Plumbing & Htng Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1520 WILLIAMSBRIDGE ROAD | 2026-07-29 |
| 1946 BRUCKNER BOULEVARD | 2026-07-17 |
| 2021 GRAND CONCOURSE | 2026-06-02 |
| 1106 GARRISON AVENUE | 2026-05-27 |
| 515 WEST 36 STREET | 2026-04-14 |
| 55 EAST 59 STREET | 2026-04-09 |
| 2900 ST THERESA AVENUE | 2026-03-31 |
| 363 EAST 76 STREET | 2026-02-26 |
| 335 8 AVENUE | 2026-02-17 |
| 1 FORDHAM PLAZA | 2026-02-11 |
| 264 WATER STREET | 2026-02-05 |
| 58 BOWERY | 2026-01-21 |
| 998 5 AVENUE | 2026-01-20 |
| 2800 BRUCKNER BOULEVARD | 2025-11-07 |
193 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $990,948, median $28,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
219 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| X01276161-S1-PL | 2026-07-29 | Plumbing | 1520 WILLIAMSBRIDGE ROAD | PROPOSED GAS SERVICE ON 2ND FLOOR TO SERVE FIXTURES AS PER PLANS. | $10,000 |
| X01111781-I1-PL | 2026-07-17 | Plumbing | 1946 BRUCKNER BOULEVARD | Filing plumbing plans for the installation of a new system and associated finishes in-conjunction with New Building application X01111202-I1 | $3,000 |
| X01390943-S1-PL | 2026-06-02 | Plumbing | 2021 GRAND CONCOURSE | PLUMBING WORK FOR MEDICAL OFFICE AT 2ND FLR; NO CHANGE USE, EGRESS OR OCCUPANCY | $78,000 |
| X01324023-S1-PL | 2026-05-27 | Plumbing | 1106 GARRISON AVENUE | INSTALLATION OF NEW PL FIXTURES ON 1ST FL & ROF DRAINS & ALL ASSOCIATED BRANCH PIPING AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY | $60,000 |
| X01143109-S1-PL | 2026-04-16 | Plumbing | 2021 GRAND CONCOURSE | PLUMBING WORK FOR DENTAL OFFICE AT 4TH FLR; NO CHANGE USE, EGRESS OR OCCUPANCY | $73,000 |
| M01248029-S3-PL | 2026-04-14 | Plumbing | 515 WEST 36 STREET | Installation of plumbing fixtures as per plans filed herewith, no change to use, egress or occupancy | $230,000 |
| M01356307-S2-PL | 2026-04-09 | Plumbing | 55 EAST 59 STREET | Plumbing plans filed herewith to show interior alteration within tenant space (Suite 11). Hot Water Heater, New PL fixtures and piping, & New dental plumbing fixtures and piping. N | $79,300 |
| X01262649-S1-PL | 2026-03-31 | Plumbing | 2900 ST THERESA AVENUE | Job filed as Subsequent filing for job#X01262649-I1(GC) to Legalize WORK WITHOUT A PERMIT for Plumbing work at: APT#4E On existing Apartments Building in order to remove ECB violat | $0 |
| M01331093-S1-PL | 2026-02-26 | Plumbing | 363 EAST 76 STREET | BATHROOM RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $5,000 |
| M01356110-I1-PL | 2026-02-17 | Plumbing | 335 8 AVENUE | LIDL CHELSEA - FILING HEREWITH FOR THE PLUMBING WORK RELATED TO A STORE FIT OUT. THERE WILL BE NO CHANGE IN USE, EGGRESS OR OCCUPANCY UNDER THIS APPPLICATION. | $225,250 |
| X01318517-S2-PL | 2026-02-11 | Plumbing | 1 FORDHAM PLAZA | PARTY CITY SPACE-- PLUMBING MODIFICATIONS AND INSTALLATIONS REQUIRED FOR RETAIL SPACE DEMISE AS PER PLANS FILED. | $45,000 |
| M01295827-I1-PL | 2026-02-05 | Plumbing | 264 WATER STREET | INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR AND PARTIAL CELLAR IN EXISTING BUILDING: NEW PLUMBING FIXTURES AND PIPING ROUTES PER NEW DENTAL OFFICE LAYOUT. NEW PLU | $50,500 |
| M01320036-I1-PL | 2026-01-21 | Plumbing | 58 BOWERY | PLUMBING UPDATES TO 2ND FLOOR AS PER PLANS FILED HEREWITH. | $59,070 |
| M01336757-S1-PL | 2026-01-20 | Plumbing | 998 5 AVENUE | Plumbing fixture work for apartment renovation at Penthouse . No change to use, egress or occupancy filed under this application. | $33,750 |
| X01264759-S5-PL | 2025-11-07 | Fire protection | 2800 BRUCKNER BOULEVARD | PROPOSED PLUMBING AND SPRINKLER WORK. ALL AS PER PLANS FILED HEREWITH. | $405,460 |
| X01264759-S5-PL | 2025-11-07 | Plumbing | 2800 BRUCKNER BOULEVARD | PROPOSED PLUMBING AND SPRINKLER WORK. ALL AS PER PLANS FILED HEREWITH. | $405,460 |
| Q01258077-S2-PL | 2025-10-31 | Plumbing | 162-21 JAMAICA AVENUE | Filing herewith for plumbing and sprinkler work as per plans submitted. No change in egress, use, or occupancy. | $98,400 |
| Q01258077-S2-PL | 2025-10-31 | Fire protection | 162-21 JAMAICA AVENUE | Filing herewith for plumbing and sprinkler work as per plans submitted. No change in egress, use, or occupancy. | $98,400 |
| X01247366-I1-PL | 2025-10-29 | Plumbing | 2413 CAMBRELENG AVENUE | Replacement and installation of plumbing and gas fixtures and associated piping as shown on the drawings filed herewith. No change in use, egress, or occupancy. | $80,000 |
| M01020845-S1-PL | 2025-10-08 | Plumbing | 363 EAST 76 STREET | HEREWITH FILING FOR PLUMBING WORK RELATED TO BATHROOM RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $10,000 |
| S00895770-S8-PL | 2025-10-02 | Plumbing | 2559 FOREST AVENUE | HEREWITH FILING CIVIL PLUMBING WORK AS PER PLANS | $0 |
| M01264188-S1-PL | 2025-09-29 | Plumbing | 530 EAST 90 STREET | PL FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $64,000 |
| M01256195-S1-PL | 2025-09-12 | Plumbing | 201 WEST 16 STREET | PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT. 2G ON 2ND FLOOR AS INDICATED ON PLAN. NO CHANGE IN USE OCCUPANCY, EGRESS OR BUILDING BULK | $11,000 |
| X01231338-I1-PL | 2025-09-05 | Plumbing | 1670 GRAND AVENUE | Installation, relocation and/or removal of plumbing fixtures associated with interior work under X01231336. | $33,000 |
| X01124970-I1-PL | 2025-08-08 | Plumbing | 3951 PROVOST AVENUE | INSTALLING NEW BATHROOM FIXTURES AS PER PLANS SUBMITTED HEREWITH. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,500 |
| B01156932-S2-PL | 2025-08-06 | Plumbing | 502 86 STREET | Herewith filing plumbing modifications for New York Presbyterian - BAY RIDGE PHYSICIANS PRACTICE interior buildout. No change in use, egress, or occupancy | $395,000 |
| X01248749-S2-PL | 2025-08-05 | Plumbing | 378 EAST 151 STREET | DEMOLITION OF FIXTURES AND ASSOCIATED CW, HW, VENT AND WASTE PIPING. INSTALLATION OF FIXTURES AND ASSOCIATED CW, HW, VENT AND WASTE PIPING. | $14,000 |
| X01248661-S2-PL | 2025-07-29 | Plumbing | 95 WEST 168 STREET | DEMOLITION OF EXISTING DOMESTIC & SANITARY PIPING AND FIXTURES. INSTALLATION OF NEW DOMESTIC & SANITARY PIPING AND NEW FIXTURES. | $40,000 |
| M01211836-S2-PL | 2025-07-23 | Plumbing | 225 WEST 99 STREET | PLUMBING SCOPE ASSOCIATED WITH THE INTERIOR ND MINOR EXTERIOR RENOVATION OF THE PARISH HOUSE INCLUDING RELOATION OF AN EXISTING KITCHEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY. | $162,813 |
| S01240910-I1-PL | 2025-07-17 | Plumbing | 1300 HYLAN BOULEVARD | TENANT BUILDOUT FOR TAKEOUT FOOD IN EXISTING STORE, ADDING SINKS, GREASE TRAP, ELEC COOKING AND WH APPLIANCES, HOOD SUPPRESSION SYSTEM FILED BY OTHERS UNDER SEPARATE APPLICATION | $5,000 |
| B01171896-S1-PL | 2025-05-15 | Plumbing | 1950 BATH AVENUE | Interior renovation of existing commercial space to install new restaurant fixtures, as per the drawings filed herewith. There will be no change in egress, use, or occupancy. | $10,000 |
| M01200341-S1-PL | 2025-04-16 | Plumbing | 27 WEST 72 STREET | INTERIOR RENOVATION OF APT 312. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $15,900 |
| X01191678-S2-PL | 2025-04-08 | Plumbing | 2800 BRUCKNER BOULEVARD | REMOVAL OF PLUMBING WORK. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $42,680 |
| M01131545-I1-PL | 2025-04-04 | Plumbing | 40 EAST 9 STREET | Plumbing work filed in conjunction with the renovation of an existing apartment. Architectural work filed under separate applications. No change in use egress or occupancy. | $15,000 |
| S01174155-S1-PL | 2025-04-03 | Plumbing | 2530 HYLAN BOULEVARD | Plumbing modification work as shown on plans. | $149,996 |
| B01033069-S1-PL | 2025-03-12 | Plumbing | 40 19 STREET | Site storm drainage piping installation | $1,000 |
| M01171636-S1-PL | 2025-02-28 | Plumbing | 200 WEST 54 STREET | PLUMBING WORK IN CONJUNCTION WITH DENTAL OFFICE FIT-OUT. NO CHANGE OF USE, EGRESS, OCCUPANCY OR ZONING ENVELOPE. | $34,000 |
| M01147670-S1-PL | 2025-02-20 | Plumbing | 121 EAST 60 STREET | Installation of plumbing fixtures for dental office as per plans filed herewith. No change to use, egress or occupancy | $9,000 |
| X01138015-I1-PL | 2025-02-20 | Plumbing | 3512 GRACE AVENUE | IN CELLAR REMOVE AND CAP TUB, LAVATORY AND TOILET. ON 1ST FL REMOVE AND CAP SINK AND TUB. ON 1ST FL REMOVE ELECTRIC STOVE. | $6,000 |
| M01144147-I1-PL | 2025-01-30 | Plumbing | 505 WEST END AVENUE | Plumbing work filed in conjunction with the renovation of apartment 9A. Architectural and mechanical work filed separately. No change of use, occupancy or egress. | $4,000 |
| M01154663-S1-PL | 2025-01-23 | Plumbing | 14 EAST 60 STREET | Installation of plumbing fixtures as per plans filed herewith, No change to use, egress or occupancy. | $36,000 |
| M01130630-S1-PL | 2025-01-21 | Plumbing | 24 FIFTH AVENUE | Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy. | $21,000 |
| S00895770-S2-PL | 2025-01-06 | Plumbing | 2559 FOREST AVENUE | HEREWITH FILING PLUMBING WORK AS PER PLANS | $0 |
| M01055884-S2-PL | 2024-12-18 | Plumbing | 790 7 AVENUE | HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $355,000 |
| M01071784-S1-PL | 2024-12-12 | Plumbing | 301 EAST 47 STREET | PLUMBING WORK IN APT 21C AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $19,100 |
| M01089943-I1-PL | 2024-11-12 | Plumbing | 107 UNIVERSITY PLACE | Plumbing work at 4th floor apt. #4D due to fire damage indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application. | $25,000 |
| M01026399-S2-PL | 2024-11-12 | Plumbing | 55 WARREN STREET | Filing for plumbing work at the cellar and 1st floor. No change to use, egress, or occupancy. | $34,988 |
| B01118550-I1-PL | 2024-11-01 | Plumbing | 1401 KINGS HIGHWAY | Plumbing work to reconnect existing gas connections to newly replaced HVAC units on roof (Allied Health) and related finishes. No change in use, egress, or occupancy. | $10,000 |
| S00575297-S8-PL | 2024-10-24 | Plumbing | 1 NASSAU PLACE | Plumbing work in conjunction with New Building S00575297-I1 | $1,000 |
| B08019955-I1-PL | 2024-10-15 | Plumbing | 6120 15 AVENUE | provide complete all new plumbing work inc. sanitary & water piping for new bathrooms & fixtures, as well as new storm drainage system, as indicated on plans for the new building. | $1,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
