COMPANY RECORD · RALEIGH, NC

Robins & Morton Group, The — permit history in Raleigh, NC

Robins & Morton Group, The appears on 63 Raleigh permit records from 2017 through 2026, most often general construction (96.8% of the record).

Permit categories

CategoryPermitsShare
General construction6196.8%
Demolition23.2%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
201714
20187
201920
20204
20214
20222
20231
20243
20254
20264

Busiest year on record: 2019, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
3126 Blue Ridge Rd UNIT 1002026-07-08
4210 Lake Boone Trl2026-05-04
4420 Lake Boone Trl2026-01-08
3400 Wake Forest Rd2023-01-04
3000 New Bern Ave2021-08-26
3300 Executive Dr2020-03-31
3300 Executive Dr UNIT 1012020-01-17
3320 Wake Forest Rd2019-10-04
3300 EXECUTIVE DR 2002019-08-09
3300 EXECUTIVE DR2019-08-09
3400 WAKE FOREST RD2019-06-26
3300 EXECUTIVE DR 3032018-06-01
1305 NAVAHO DR2018-03-02
3320 WAKE FOREST RD 1202017-11-13

18 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $54,027,277, median $184,751. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

63 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDNR-020231-20262026-07-08General construction3126 Blue Ridge Rd UNIT 100Robins & Morton B OCC 5366 SF A-3OC1421 SF BUILDING IS $458,392
BLDNR-004683-20262026-05-04General construction4210 Lake Boone TrlThe scope of the project is to renovate the existing exterior loading dock and dumpster enclosure fo$133,171
BLDNR-051647-20252026-01-08General construction4420 Lake Boone TrlAdding and upgrading chilled water piping and electrical to support temporary chillers.$1,376,544
BLDNR-053690-20252026-01-08General construction4420 Lake Boone TrlReplace existing cooling towers and two chillers.$184,751
BLDNR-040254-20252025-12-08General construction4420 Lake Boone TrlThe project converts an underused 1950sf cafe space to an outpatient pharmacy. From a life safety s$322,283
BLDNR-001729-20252025-04-17General construction4420 Lake Boone TrlEXP - REX Histology Lab Relocation from the 2nd level into approximately 3,600 sf on the 1st level o$680,688
BLDNR-059417-20242025-04-09General construction4420 Lake Boone TrlReplacing two existing unit substations which feed the patient tower on the Raleigh campus of UNC Re$391,329
BLDNR-062253-20242025-02-27General construction4420 Lake Boone TrlREX HOSPITAL 7 STORY W/BASEMENT 1-A CONST I-2 OCC 242 SF X - ALT - Replacing (2) existing Cart Washe$46,812
BLDNR-011981-20242024-06-18General construction4420 Lake Boone TrlREX Lab Expansion, Phases 2-5, Construction Type I-A, Occupancy I-2, NFPA 13 Sprinkler System Reconf$2,224,973
BLDNR-003906-20242024-03-01General construction4420 Lake Boone TrlInterior alterations to existing rehab staff areas on the 6th and 7th floor of the Rex Patient Bed T$324,123
BLDNR-058611-20232024-02-12General construction4420 Lake Boone TrlREX Lab Expansion - I-2 OCC, 1-A Construction, Expansion into approximately 2,459 SF adjacent space.$467,185
BLDNR-041171-20222023-01-04General construction3400 Wake Forest RdFIRST FLOOR SHELL SPACE UPFIT TO CONFERENCE ROOM WITHIN THE 1-2 PORTION OF DUKE RALEIGH HOSPITAL. SC$137,026
BLDNR-025646-20202022-11-09General construction4420 Lake Boone Trl-***4/22/2024 (John Williams)- No inspections performed. ***- INTERIOR ALTERATION (NCEBC LEVEL 1) $44,932
BLDNR-021623-20222022-06-02General construction3400 Wake Forest RdEXISTING PLUMBING REROUTE FOR WATER AND SEWER FOR NEW CHAPEL LOCATION WITHIN THE HOSPITAL NO BUILDIN$14,916
BLDNR-047472-20212021-11-04General construction3400 Wake Forest RdDUKE RALEIGH HOSP ( BASEMENT) - REPLACE EXISTING NITROGEN CYLINDERS W/NEW BULK STORAGE TANK 1-A CONS$6,678
BLDNR-009775-20212021-08-26General construction3000 New Bern AveALT - WakeMed Raleigh Campus - Patient Meals Services - Kitchen renovation to include modification o$421,800
BLDNR-015640-20212021-04-27General construction3400 Wake Forest RdMECH EQUIPMENT REPLACEMTN ROOF REPLACEMNET 1-2 &B OCC 1-A CONST 10252 SF$430,174
BLDNR-050153-20202021-02-01General construction3400 Wake Forest RdREPLACE EXISTING MRI AND RECONFIGURE SPACE DUKE RALEIGH 1605 SAF 1-A CONST I-2 OCC Duke Raleigh H$225,663
BLDNR-029387-20202020-10-06General construction3400 Wake Forest RdENLARGING THE EXISTING HAZARDOUS STORAGE ROOM FOR ADDITIONAL STORAGE SPACE FOR CYTOLOGY LAD. NEW EN$46,398
BLDNR-017974-20202020-06-17General construction3400 Wake Forest RdALT - DUKE HEALTH BODY HOLDING ROOM - EXPANSION OF THE BODY HOLDING ROOM AND RELOCATION OF THE EXIST$110,243
BLDNR-012459-20202020-03-31General construction3300 Executive DrDUKE RALEIGH - ALTER BASEMENT SPACE FOR SANITATION OF EQUIPMENT - TEMPORARY (12 MONTHS FOR COVID-19$53,406
BLDNR-028620-20192020-01-17General construction3300 Executive Dr UNIT 101DUKE RALEIGH MOB 9 ADDING WATER HEATER AND ROOM IN THE BASEMENT B OCC 2-A CONST 58 SQ FT SPRINKLER A$4,489
BLDNR-025078-20192019-12-17General construction3300 Executive DrALT/DUKE RALEIGH MOB 9 ELEVATOR MODERNIZATION AND EXTERIOR STAIR REPLACEMENT - 4-STORY, TYPE II-A, 8$160,063
BLDNR-006339-20192019-10-04General construction3300 Executive DrDUKE RALEIGH MOB 2-1 CONST; B OCC;4817 SQ FT CURTIAN WALLL /STOREFRONT REPAIR AND REPLACEMENT$372,836
BLDNR-008203-20192019-10-04General construction3320 Wake Forest RdINTERIOR ALTERATION 130 SQ FT ;2-B CONST; B OCC-SPRINKLERS AND STANDPIPE$9,572
1550222019-08-09General construction3300 EXECUTIVE DR 200****FIELD REVISION***DUKE EYE PROCEDURE CLINIC$686,142
1574512019-08-09General construction3300 EXECUTIVE DRDUKE HOSPITAL - MOB 9 - BASEMENT MODIFICATIONS$145,388
1566982019-08-09General construction3300 EXECUTIVE DRSHELL CORE AND BASEMENT$142,946
1502292019-06-26General construction3400 WAKE FOREST RD-*** 4/15/2024 (John Williams)- No inspections performed. ***- DUKE RALEIGH HOSP TOWER BASEMENT PH $28,163
1500942019-06-26General construction3400 WAKE FOREST RD**FIELD REVISION** DUKE HOSPITAL TOWER NEW BLDG ADDITION$54,027,277
1502312019-06-26General construction3400 WAKE FOREST RDDUKE RALEIGH TOWER PHASE 2 ENTRY$333,723
1502322019-06-26General construction3400 WAKE FOREST RDDUKE RALEIGH HOSPITAL PHASE 73ENTRY$273,413
1502342019-06-26General construction3400 WAKE FOREST RDDUKE RALEIGH HOSPITAL PHASE 2 STAFF LOUNGES$748,486
1502332019-06-26General construction3400 WAKE FOREST RDDUKE RALEIGH HOSPITAL PHASE 1 SURGICAL$785,103
1502352019-06-26General construction3400 WAKE FOREST RDDUKE RALEIGH HOSPITAL/PACU PH 3$1,633,881
1502272019-06-26General construction3400 WAKE FOREST RD-*** 4/15/2024 (John Williams)- No inspections performed. ***- DUKE RALEIGH TOWER PH1 BASEMENT PHAS$259,905
1502302019-06-26General construction3400 WAKE FOREST RDDUKE RALEIGH TOWER ADDITION ENTRY PH$1,211,174
1572862019-06-17General construction3300 EXECUTIVE DRBASEMENT ENTRANCE UPGRADES AND DUMPSTER ENCLOSURE$22,595
1577892019-05-24General construction3300 EXECUTIVE DRDUKE RALEIGH MOB 9$22,090
1568392019-05-24General construction3300 EXECUTIVE DR***FIELD REVISION** DUKE RALEIGH MOB 9$122,095
1574492019-05-24General construction3300 EXECUTIVE DRDUKE RALEIGH MOP 9-LEVEL 2 ALTERATION$281,196
1545492019-01-25General construction3400 WAKE FOREST RDDUKE RALEIGH S PAVILION TEMP SERVICE$33,655
1476672018-06-01General construction3400 WAKE FOREST RDDUKE HOSPITAL TANKS & GENERATORS$240
1465212018-06-01General construction3300 EXECUTIVE DR 303DUKE VASCULAR SPECIALIST$327,754
1476662018-06-01General construction3400 WAKE FOREST RDTHIS IS NEW MODULAR CENTRAL ENERGY PLANT$551,438
1463992018-06-01General construction3400 WAKE FOREST RDMOB 6 ALTERATION TO 1ST FLOOR$191,226
1490942018-06-01General construction3300 EXECUTIVE DRINT COMP/DUKE VASCULAR CLINIC$217,789
1479112018-05-22General construction3300 EXECUTIVE DRDUKE RALEIGH MOB 9$846,877
1467462018-03-02General construction1305 NAVAHO DRALT/DUKE RALEIGH MOB 9 PATIENT ROOMS$119,962
1442512017-12-12General construction3400 WAKE FOREST RDINSTALLATION OF FUEL TANKS$24,775

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Raleigh permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →