COMPANY RECORD · RALEIGH, NC
C.T. Wilson Construction Compa — permit history in Raleigh, NC
C.T. Wilson Construction Compa appears on 54 Raleigh permit records from 2015 through 2026, most often general construction (94.4% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 51 | 94.4% |
| Demolition | 3 | 5.6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 5 |
| 2016 | 4 |
| 2017 | 11 |
| 2018 | 10 |
| 2020 | 3 |
| 2021 | 2 |
| 2022 | 1 |
| 2023 | 4 |
| 2024 | 5 |
| 2025 | 8 |
| 2026 | 1 |
Busiest year on record: 2017, with 11 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3400 Wake Forest Rd | 2026-01-05 |
| 3300 Executive Dr 200 | 2025-04-07 |
| 3404 Wake Forest Rd STE 302 | 2024-05-10 |
| 5850 Oak Forest Dr | 2024-03-07 |
| 3300 Executive Dr | 2024-02-12 |
| 3300 Executive Dr STE 100 | 2023-10-25 |
| 3320 Wake Forest Rd | 2023-07-17 |
| 300 E Davie St | 2021-08-24 |
| 4730 Capital Blvd | 2020-07-28 |
| 3127 Smoketree Ct | 2020-03-31 |
| 107 W Hargett St UNIT 200 | 2020-03-11 |
| 107 W HARGETT ST | 2018-09-04 |
| 224 FAYETTEVILLE ST | 2018-05-25 |
| 310 S WEST ST 110 | 2018-05-02 |
29 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $4,456,124, median $66,606. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
54 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDNR-044109-2025 | 2026-01-05 | General construction | 3400 Wake Forest Rd | New security door within the existing PET/CT suite. | $22,037 |
| BLDNR-039013-2025 | 2025-11-17 | General construction | 3400 Wake Forest Rd | Existing vacant area in the basement of the hospital where they would like to relocate their pharmac | $516,856 |
| BLDNR-042619-2025 | 2025-11-13 | General construction | 3400 Wake Forest Rd | Existing vacant ICU space on the 2nd floor of the hospital -6400SF they wish to convert this area to | $1,282,176 |
| BLDNR-006693-2025 | 2025-07-03 | General construction | 3400 Wake Forest Rd | 500O SF I-2 OCC 1-A CONST 3 PHASES Interior alterations to the existing basement (north pavilion) o | $967,200 |
| BLDNR-010624-2025 | 2025-05-07 | General construction | 3400 Wake Forest Rd | New discharge lounge in an existing vacant space on the ground floor of the hospital. Scope involve | $73,507 |
| BLDNR-006240-2025 | 2025-04-07 | General construction | 3300 Executive Dr 200 | New overhead procedure room light fixture. No other work involved other than the structure and elec | $15,000 |
| BLDNR-006578-2025 | 2025-03-25 | General construction | 3300 Executive Dr 200 | new nitrogen manifold and piping from an existing rated manifold room to an existing operating room | $17,162 |
| BLDNR-061767-2024 | 2025-03-12 | General construction | 3400 Wake Forest Rd | Addition of thicker lead shielding on existing walls in the PET/CT suite | $19,344 |
| BLDNR-032822-2024 | 2025-02-04 | General construction | 3400 Wake Forest Rd | Interior alterations to upgrade existing cath lab with new equip and finishes. New hvac unit 1-A CON | $135,408 |
| BLDNR-024052-2024 | 2024-08-13 | General construction | 3400 Wake Forest Rd | EXISTING WAITING ROOM TO BE CONVERTED TO A NEW STORAGE ROOM - SCOPE ENTAILS CREATING FIRE BARRIER WA | $62,697 |
| BLDNR-003394-2024 | 2024-05-10 | General construction | 3404 Wake Forest Rd STE 302 | Interior alterations of an existing office clinic to expand into an adjacent vacant space. Scope is | $134,822 |
| BLDNR-057971-2023 | 2024-03-07 | General construction | 5850 Oak Forest Dr | REPLACE EXPIRED PERMIT # BLDNR-017966-2023 ADDING EXTERIOR LOADING DOCK STAIR AND NEW EXTERIOR DOOR | $0 |
| BLDNR-060585-2023 | 2024-02-12 | General construction | 3300 Executive Dr | Alterations to 1st floor elevator lobby & core/shell. New finished in restrooms 2-A const B occ 14 | $78,057 |
| BLDNR-062105-2023 | 2024-01-26 | General construction | 3400 Wake Forest Rd | Replace bathtubs with roll-in showers on 3rd floor | $31,347 |
| BLDNR-041507-2022 | 2023-10-25 | General construction | 3300 Executive Dr STE 100 | 2-A COSNT 13398 SF ALTERATION OF AN EXISTING BUSINESS OCCUPANCY TO BECOME A NEW GI CLINIC AND ENDOSC | $1,254,857 |
| BLDNR-024631-2023 | 2023-07-17 | General construction | 3320 Wake Forest Rd | Elevator Modifications - Elevator Company through Duke. CTW will be managing the Electrical, 2-B CON | $43,963 |
| BLDNR-017966-2023 | 2023-05-10 | General construction | 5850 Oak Forest Dr | ADDING EXTERIOR LOADING DOCK STAIR AND NEW EXTERIOR DOOR 50 SF 2-B CONST F-1 OCC | $2,628 |
| BLDNR-063355-2022 | 2023-04-17 | General construction | 5850 Oak Forest Dr | PROJECT SCOPE CONSIST OF 290SF ADDITION TO EXISTING COMMERCIAL FACTORY BLDG. INCLUDES MINOR PM&E | $21,683 |
| BLDNR-032612-2022 | 2022-08-31 | General construction | 5850 Oak Forest Dr | HIGH PILED STORAGE ADDED TO EXISITNG FACTORY .10525 SF 2-B CONST | $553,089 |
| BLDNR-032852-2021 | 2021-08-24 | General construction | 300 E Davie St | REPAIR RETAINING WALL (150 LF) INCLUDES A NEW GUARDRAIL AT THE UPSLOPE OF THE WALL | $126,800 |
| BLDNR-019210-2021 | 2021-07-01 | General construction | 5850 Oak Forest Dr | ADDITION - SCHMALZ PLANT ADDITION - Manufacturing building expansion with associated drive and parki | $4,456,124 |
| BLDNR-014616-2020 | 2020-07-28 | General construction | 4730 Capital Blvd | INTERIOR RENOVATION AND CONVERSION FROM PHARMACY/DRUG STORE TO BANK. INCLUDING INTERIOR RECONFIGURA | $1,438,150 |
| BLDNR-004691-2020 | 2020-03-31 | General construction | 3127 Smoketree Ct | INTERIOR DEMOLITION OF 3 STORYOFFICE BLDG. 40172 SF B OCCC 2-B CONST NO SPRINKLER' | $4,436,596 |
| BLDNR-005943-2020 | 2020-03-11 | General construction | 107 W Hargett St UNIT 200 | INT COMP - HARGETT WEST - FASTMED -5 STORY, TYPE III-A, 27279 SF BLDG W/19795 SF OF B-OCC TBR... FAS | $1,998,899 |
| 148921 | 2018-09-04 | General construction | 107 W HARGETT ST | 107 W. HARGETT HISTORICAL BLDG. | $2,631,210 |
| 148920 | 2018-09-04 | General construction | 107 W HARGETT ST | 107 W. HARGETT RETURN TO SHELL | $466,872 |
| 149371 | 2018-05-25 | General construction | 224 FAYETTEVILLE ST | INSTALL 2 WALLS IN EACH OF TWO ROOMS | $10,721 |
| 148563 | 2018-05-18 | Demolition | 107 W HARGETT ST | DEMO 1ST FLOOR ON BACK OF BUILDING | $100,000 |
| 147842 | 2018-05-02 | General construction | 310 S WEST ST 110 | INTERIOR COMPLETION SUITE 110 | $0 |
| 146490 | 2018-04-06 | General construction | 310 S WEST ST | INT COMP/JUNCTION WEST | $408,607 |
| 146943 | 2018-03-29 | General construction | 111 W HARGETT ST | INTERIOR ALTERATION | $227,355 |
| 139085 | 2018-02-12 | Demolition | 300 E DAVIE ST | DEMO 1134 SQ FT | $30,308 |
| 139073 | 2018-02-12 | General construction | 300 E DAVIE ST | DAVIE STREET PRESBYTERIAN CHURCH EXPANSION | $831,234 |
| 139461 | 2018-02-12 | General construction | 300 E DAVIE ST | CHURCH ALTERATIONS | $24,307 |
| 145270 | 2017-12-19 | General construction | 419 S EAST ST | RETAINING WALL | $110,000 |
| 141036 | 2017-08-09 | General construction | 310 S WEST ST | 4 AWNINGS | $0 |
| 140607 | 2017-08-09 | General construction | 310 S WEST ST | ALT TO SHELL/JUNCTION WEST CORE & SHELL | $1,500,000 |
| 136375 | 2017-07-13 | General construction | 3101 DURALEIGH RD | BRIGHTON GARDENS | $0 |
| 140807 | 2017-07-05 | General construction | 404 CHAVIS WAY | NEW TH- LOT 5 STONE'S WAREHOUSE SUBD. | $160,226 |
| 140809 | 2017-07-05 | General construction | 408 CHAVIS WAY | NEW TH- LOT 7 STONE'S WAREHOUSE SUBD. | $160,226 |
| 140806 | 2017-07-05 | General construction | 402 CHAVIS WAY | NEW TH- LOT 4 STONE'S WAREHOUSE SUBD. | $160,226 |
| 137660 | 2017-03-01 | General construction | 500 E DAVIE ST | STONES WAREHOUSE PLAZA | $170,667 |
| 137655 | 2017-03-01 | General construction | 500 E DAVIE ST | BLDG SHELL W/NO TENANTS NO CO | $0 |
| 137658 | 2017-03-01 | General construction | 500 E DAVIE ST | MEZZANINE SQUARE FOOTAGE NEW | $0 |
| 137659 | 2017-03-01 | General construction | 500 E DAVIE ST | ADDITION/STONES WAREHOUSE STORAGE BUILDING | $21,000 |
| 135143 | 2016-10-28 | Demolition | 400 CHAVIS WAY | DEMO | $70,000 |
| 128118 | 2016-03-16 | General construction | 216 S WEST ST | REMOVE AND REPLACE ROOF | $63,211 |
| 127715 | 2016-02-23 | General construction | 224 FAYETTEVILLE ST | HISTORIC BUILDING ON FAYETTVILLE ST. | $0 |
| 127716 | 2016-02-23 | General construction | 224 FAYETTEVILLE ST | ALT/224 FAYETTEVILLE ST EXTERIOR | $30,750 |
| 125713 | 2015-11-03 | General construction | 8601 SIX FORKS RD 400 | REGUS | $0 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Raleigh permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
