COMPANY RECORD · RALEIGH, NC

Danis Construction Co, LLC — permit history in Raleigh, NC

Danis Construction Co, LLC appears on 41 Raleigh permit records from 2015 through 2026, all of them general construction.

Permit categories

CategoryPermitsShare
General construction41100%

Activity by year

YearPermits issued
20154
20165
20196
20205
20218
202211
20231
20261

Busiest year on record: 2022, with 11 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
5111 Falls Of Neuse Rd2026-05-27
10000 Falls Of Neuse Rd2023-07-24
10010 Falls Of Neuse Rd STE 1002022-12-30
100 E Tryon Rd2022-10-19
4300 Six Forks Rd2022-08-10
10010 Falls Of Neuse Rd UNIT 0092022-03-09
10020 Falls Of Neuse Rd2022-02-17
5241 Six Forks Rd2021-09-20
3000 New Bern Ave2021-05-28
3000 NEW BERN AVE2019-08-06
5511 CAPITAL CENTER DR 1002019-03-15
100 E TRYON RD2019-03-05
1010 MAIN CAMPUS DR2016-11-29
1010 MAIN CAMPUS DR 2202016-05-27

17 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $5,276,253, median $201,930. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

41 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDNR-007757-20262026-05-27General construction5111 Falls Of Neuse RdMidtown Medical Office Building 5111 Falls of Neuse Rd, Suites 200 & 300 Raleigh, NC 27609 Occupanc$5,276,253
BLDNR-019093-20232023-07-24General construction10000 Falls Of Neuse RdThe project renovates existing WakeMed patient rooms on level 4 to create a 9 bed ICU unit.1-A CONS$1,224,995
BLDNR-004337-20222022-12-30General construction10010 Falls Of Neuse Rd STE 100ALT - WakeMed North Raleigh ASC - Remodeling of 1st Level of an existing WakeMed Physician office Pa$1,732,659
BLDNR-035315-20222022-10-19General construction100 E Tryon RdFirst Citizens Bank, 3 Story, IA Construction, NFPA 13 Sprinkler System, Business Occupancy, 7181 SF$724,922
BLDNR-061824-20212022-08-26General construction100 E Tryon RdReplace existing interior storefront, revolving doors and egress doors with new interiors storefront$33,172
BLDNR-030178-20222022-08-10General construction4300 Six Forks RdB OCC 3461 SF 1-B CONST RECONFIGURATION OF OFFICE SPACE ACROSS FIVE FLOORS THAT WILL BE DONE OVER T$296,919
BLDNR-026581-20222022-07-06General construction4300 Six Forks RdRework of existing restrooms with new countertops, flooring, plumbing fixtures and lighting in kind $116,331
BLDNR-020286-20222022-05-09General construction100 E Tryon RdREWORK ELECTRICAL SYSTEM 2990 SF 2-A CONST B OCC First Citizens Bank$123,965
BLDNR-000299-20222022-04-13General construction10000 Falls Of Neuse RdRENO GROUND FLOOR ENDOSCOPY SUITE - WAKE MED NORTH I- 2 OCC, I-A CONST, 3,020sf TBR OF 5 STORY 239,$450,463
BLDNR-000909-20222022-03-09General construction10010 Falls Of Neuse Rd UNIT 009ALT - WAKEMED POP - UROLOGY OFFICE FIT UP - 2-B COSNT B OCC INTERIOR ALTERATION OF APPROXIMATELY 3,$271,278
BLDNR-006668-20222022-02-17General construction10020 Falls Of Neuse RdCONSTRUCTION TRAILER FOR WAKE MED NORTH HOSPITAL$0
BLDNR-057399-20212022-02-04General construction10000 Falls Of Neuse RdALT - WakeMed North Hospital CV Testing Renovation - Renovation of existing under utilized dressing $31,622
BLDNR-027777-20212022-02-01General construction4300 Six Forks RdHVAC ROOF TOP UNIT REPLACEMENT , NEW CHILLER AND DECICATED OUTDOOR AIR SYSTEM AND AIR HANDLING UNITS$173,040
BLDNR-029236-20212021-09-20General construction5241 Six Forks RdIMPOVEMENTS TO AN EXISTING CORE AND SHELL BLDG WHICH WILL CONSIST OF THE 1ST FLOOR FIT UP TO BE UTIL$630,328
BLDNR-033991-20212021-08-24General construction10000 Falls Of Neuse RdAlteration to Wake Med North RF Room 503 sf TBR, Occ - Inst, I-A Const, REPLACEMENT OF EXISTING RF E$75,027
BLDNR-029649-20212021-08-10General construction4300 Six Forks RdFCB-AUDIT ROOM -REMOVE EXISTING EQUIPEMNT & REWORK OF EXSITNG POWER AND DATE TO ACCOMODATE NEW AV EQ$28,911
BLDNR-029643-20212021-08-10General construction4300 Six Forks RdFCB-CONFERENCE ROOM -REMOVE EXISTING EQUIPEMNT & REWORK OF EXSITNG POWER AND DATE TO ACCOMODATE NEW $20,802
BLDNR-019766-20212021-05-28General construction3000 New Bern AveALT - WakeMed Raleigh Campus - Hybrid OR - renovation of existing space into a new Hybrid OR with co$305,102
BLDNR-008070-20212021-05-06General construction10000 Falls Of Neuse RdWAKE MED NORTH 870 SF 1-A CONST I-2 OCC NEW WASHER/DISINFECTOR WILL BE INSTALL ADJACENT TO THE EXIST$244,653
BLDNR-003552-20212021-03-10General construction100 E Tryon RdREWORK OF EXISTING ELECTRICAL TO COORDINATE WITH RELOCATION OF EQUIPMENT RACKS, NEW WORKSTATION FURN$83,397
BLDNR-042042-20202021-01-21General construction100 E Tryon RdFIRST CITIZENS BANK- MINOR INTERIOR ALTERATION TO CLOSET. Finish upgrades, Lighting and AV Upgrades.$113,346
BLDNR-037210-20202020-12-21General construction5241 Six Forks RdIMPROVEMENTS TO AN EXISTING CORE AND SHELL BLDG WHICH WILL CONSIST OF THE 2ND FLOOR FIT UP TO BE UTI$719,068
BLDNR-023813-20202020-07-31General construction10000 Falls Of Neuse RdEXPAND THE CURRENT- EMERGENCY DEPARTMENT INTO THE EXISTING PRE-ADMISSION TESTING AREA TO ADD 6 MORE $406,858
BLDNR-022022-20192020-01-13General construction100 E Tryon RdRENOVATING EXISTING JANITORS CLOSET. 2-A CONST B OCC 55 SQ FT$4,257
BLDNR-015937-20192020-01-13General construction100 E Tryon RdLEVEL 2 ALTERATION 2-A CONST B OCC 53792 SQ FT SPRINKLER AND STANDPIPE 5 PHASES$4,163,501
BLDNR-009861-20192020-01-10General construction100 E Tryon RdINTERIOR ALTERATION 1ST CITIZENS 2-A CONST; A-2 OCC; 24674 SQ FT; SPRINKLER AND STANDPIPE HSIPOP $931,197
1574372019-08-06General construction3000 NEW BERN AVEWAKEMED 4E REHAB 594870$201,930
1543272019-03-15General construction5511 CAPITAL CENTER DR 100DANIS - LEVEL 2 ALTERATION$518,201
1547352019-03-13General construction3000 NEW BERN AVEWAKE MED HEART CENTER$553,374
1546302019-03-05General construction100 E TRYON RDDAC02 GREEN IT WORKPLACE PHASE 2$879,087
1546292019-03-05General construction100 E TRYON RDDAC02 GREEN IT WORKPLACE PHASE 1$1,178,353
1546312019-03-05General construction100 E TRYON RDDAC02 GREEN IT WORKPLACE PHASE 3$371,621
1355372016-11-29General construction1010 MAIN CAMPUS DRCTR FOR TECHNOLOGY & INNOVATION-2ND FLR CORRIDOR$0
1289242016-07-14General construction1010 MAIN CAMPUS DRCENTER FOR TECHNOLOGY AND INNOVATION$0
1314402016-05-27General construction1010 MAIN CAMPUS DR 220DELTA$0
1293252016-05-27General construction1010 MAIN CAMPUS DRINT COM / NCSU DELTA @ CENTER OF TECHOLOGY$573,500
1271182016-01-25General construction2411 RESEARCH DR5 STORY PARKING DECK$0
1264842015-11-09General construction2401 RESEARCH DR 150NON WOVEN INSTITUTE$0
1247662015-08-26General construction2401 RESEARCH DRCONSTRUCTION TRAILER$0
1210172015-07-29General construction1010 MAIN CAMPUS DRCENTER FOR TECHNOLOGY & INNOVATION$0
1205502015-05-05General construction2401 RESEARCH DRCONSTRUCT CAST IN PLACE RETAINING WALL$0

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Raleigh permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →