COMPANY RECORD · MINNEAPOLIS, MN
Lbp Mechanical Inc — permit history in Minneapolis, MN
Lbp Mechanical Inc appears on 52 Minneapolis permit records from 2016 through 2026, most often plumbing (94.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 49 | 94.2% |
| Mechanical / HVAC | 3 | 5.8% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 1 |
| 2017 | 14 |
| 2018 | 15 |
| 2019 | 11 |
| 2020 | 2 |
| 2021 | 1 |
| 2022 | 3 |
| 2023 | 1 |
| 2024 | 3 |
| 2026 | 1 |
Busiest year on record: 2018, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 330 2ND AVE S #SUITE 230 | 2026-06-26 |
| 608 2ND AVE S | 2024-08-22 |
| 200 5TH ST S | 2024-07-11 |
| 80 8TH ST S | 2024-01-24 |
| 144 13TH AVE NE | 2023-08-21 |
| 101 9TH ST N | 2022-12-09 |
| 825 NICOLLET MALL | 2022-12-02 |
| 710 MARQUETTE AVE | 2022-11-22 |
| 733 MARQUETTE AVE | 2019-11-04 |
| 706 2ND AVE S | 2019-09-27 |
| 730 2ND AVE S #600 | 2019-09-12 |
| 730 MARQUETTE AVE | 2019-07-11 |
| 100 5TH ST S | 2019-06-19 |
| 3937 MINNEHAHA AVE | 2019-03-26 |
30 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
52 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1185503 | 2026-06-26 | Plumbing | 330 2ND AVE S #SUITE 230 | Existing restaurant being refreshed. Replacement of (3) gas appliances with new regulators and new flex connections. Connections to existing natural gas system. Appliances: (1) 4- | |
| BLDG1079565 | 2024-08-22 | Plumbing | 608 2ND AVE S | ||
| BLDG1070341 | 2024-07-11 | Plumbing | 200 5TH ST S | LOADING DOCK AREA - ADD VENTED AREA DRAIN | |
| BLDG1040799 | 2024-01-24 | Plumbing | 80 8TH ST S | SUITE 240: NEW UNISEX RESTROOM AND BREAKROOM SINK | |
| BLDG1013795 | 2023-08-21 | Mechanical / HVAC | 144 13TH AVE NE | ||
| BLDG973886 | 2022-12-09 | Plumbing | 101 9TH ST N | Replacement of 450 lineal feet of 4.00 cast iron drainage piping from Ramp A. The piping is under the ramp deck and over the 3rd Ave/394/6th Street traffic lanes. | |
| BLDG972905 | 2022-12-02 | Plumbing | 825 NICOLLET MALL | SUITE 725 - SINKS FOR DENTAL SUITE EXPANSION | |
| BLDG955611 | 2022-11-22 | Plumbing | 710 MARQUETTE AVE | INSTALL GLASS WASHER-1ST FLOOR BAR removal and replacement of existing fixture - no plan review required | |
| BLDG904411 | 2021-11-01 | Plumbing | 80 8TH ST S | kitchen equipment replacement - no new piping in walls or below floor. No plan review required. | |
| BLDG852436 | 2020-10-20 | Plumbing | 825 NICOLLET MALL | FOOD-SUITE210-PLUMBING TO NEW EXAM ROOM SINK | |
| BLDG847981 | 2020-09-10 | Plumbing | 825 NICOLLET MALL | ADD SINK TO EXPANDED DENTAL OFFICE | |
| BLDG803129 | 2019-11-04 | Plumbing | 733 MARQUETTE AVE | Install new restrooms fixtures on floors 5 and 6. | |
| BLDG796468 | 2019-09-27 | Plumbing | 706 2ND AVE S | ||
| BLDG793775 | 2019-09-12 | Plumbing | 730 2ND AVE S #600 | ||
| BLDG792157 | 2019-09-04 | Plumbing | 706 2ND AVE S | BREAKROOM SINK & COFFEE STATION SUITE 303 (705 2nd Ave S - BAKER CENTER) | |
| BLDG783143 | 2019-07-11 | Plumbing | 730 MARQUETTE AVE | 5 COFFEE MKRS,5 DISHWASHER, SINK (5 KITCHEN/ 1 OTHER) BAKER CENTER, 730 BLDG, 745 MARQUETTE AVE BREAKROOMS AND WELLNESS ROOM ON FLOOR 08 | |
| BLDG780325 | 2019-06-19 | Plumbing | 100 5TH ST S | FOR 7TH FLOOR RESTROOMS - REPLACE 6 LAVATORIES INCLUDING FAUCETS | |
| BLDG761430 | 2019-04-03 | Plumbing | 825 NICOLLET MALL | FOR SUITE 650 - ADDITIONAL BREAKROOM/SINGLE COMPARTMENT SINK WITH FAUCET, TENANT FURNISHED | |
| BLDG759748 | 2019-03-26 | Plumbing | 3937 MINNEHAHA AVE | reroute/extend gas line to dryer | |
| BLDG759347 | 2019-03-25 | Plumbing | 825 NICOLLET MALL | FOR SUITE 650 - NEW RESTROOM AND SHOWER | |
| BLDG750604 | 2019-02-20 | Plumbing | 733 MARQUETTE AVE #223 | ||
| BLDG752146 | 2019-01-29 | Mechanical / HVAC | 2701 JOHNSON ST NE | INSTALL 1 UNIT HEATER / 3 FIN TUBE | |
| BLDG744306 | 2018-11-30 | Plumbing | 120 6TH ST S | replace water cooler level 1 fitness center | |
| BLDG736904 | 2018-11-05 | Plumbing | 225 6TH ST S | LEVEL 4 SHEPHERD DATA | |
| BLDG729850 | 2018-10-30 | Plumbing | 615 WASHINGTON AVE SE | Top Golf- tenant added (1) dump sink. | |
| BLDG727246 | 2018-09-06 | Plumbing | 730 2ND AVE S | FOR SUITE 285 BREAKROOM - ELECTRIC WATER HEATER, COFFEE LINE, FLOOR DRAIN, AND KITCHEN SINK | |
| BLDG727253 | 2018-09-06 | Plumbing | 615 WASHINGTON AVE SE | FOR TOP GOLF BUILDOUT - FLOOR DRAIN, ELECTRIC WATER HEATER AND SINK | |
| BLDG727248 | 2018-09-06 | Plumbing | 730 2ND AVE S | FOR 2ND FLOOR NEW ADA RESTROOM: TOILET, LAVATORY AND FLOOR DRAIN | |
| BLDG719550 | 2018-07-20 | Plumbing | 80 8TH ST S | 3 sinks to waste line | |
| BLDG712261 | 2018-06-06 | Plumbing | 150 5TH ST S | floor 10 tenant improvements | |
| BLDG708809 | 2018-05-17 | Plumbing | 825 NICOLLET MALL | add sink suite # 650 | |
| BLDG701566 | 2018-04-05 | Plumbing | 825 NICOLLET MALL | FOR SUITE 925 - NEW BREAKROOM SINK | |
| BLDG701171 | 2018-03-30 | Plumbing | 121 8TH ST S | floor 14 and 15 14th sink 15th breakroom sink | |
| BLDG700728 | 2018-03-28 | Plumbing | 706 2ND AVE S | 3rd floor tenant breakroom sink coffee maker dishwasher ice maker | |
| BLDG700661 | 2018-03-28 | Plumbing | 706 2ND AVE S | new restroom on 3rd floor | |
| BLDG700149 | 2018-03-23 | Plumbing | 50 6TH ST S | FLOOR #11 BASIN 2 FLOOR DRAINS ELEC WATER HEATER 2 SINKS URINAL TOILET WATER DISPENSER DISHWASHER COFFEE MAKER | |
| BLDG698455 | 2018-03-13 | Plumbing | 800 LASALLE AVE | FLOOR # 25 REMODEL RESTROOMS AND WATER COOLER | |
| BLDG674724 | 2017-09-14 | Plumbing | 150 5TH ST S | 3 kitchen sinks | |
| BLDG672168 | 2017-08-28 | Mechanical / HVAC | 434 LAKESIDE AVE | Install used owner supplied 15 ton RTU | |
| BLDG668954 | 2017-08-04 | Plumbing | 225 6TH ST S | FOR SUITE 2675 BREAKROOM: SINK AND UNDER THE COUNTER WATER HEATER | |
| BLDG668809 | 2017-08-04 | Plumbing | 80 8TH ST S | FOR 45TH FLOOR RESTROOMS: URINAL, 3 TOILETS, WATER COOLER AND 6 LAVATORIES | |
| BLDG667157 | 2017-07-24 | Plumbing | 706 2ND AVE S | 4 showers 4 floor drains 2 basin | |
| BLDG663458 | 2017-06-29 | Plumbing | 200 6TH ST S | ADD SINK | |
| BLDG663148 | 2017-06-29 | Plumbing | 225 6TH ST S | floor 18 reset bathroom fixtures | |
| BLDG661714 | 2017-06-16 | Plumbing | 5000 LOGAN AVE S | basin and toilet | |
| BLDG658920 | 2017-06-06 | Plumbing | 100 WASHINGTON AVE S | floor 5 plumbing for breakroom and wellness center | |
| BLDG658104 | 2017-05-31 | Plumbing | 710 MARQUETTE AVE | marquette hotel floors 6-18 guest suites | |
| BLDG646954 | 2017-04-04 | Plumbing | 121 8TH ST S | floor 17-restrooms | |
| BLDG645752 | 2017-03-28 | Plumbing | 121 8TH ST S #TCF TOWER | INSTALL (7) NEW FIXTURES | |
| BLDG638375 | 2017-03-13 | Plumbing | 150 5TH ST S | new breakroom sink Suite 1310 in 150 building |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
