COMPANY RECORD · MINNEAPOLIS, MN
Frana Companies — permit history in Minneapolis, MN
Frana Companies appears on 52 Minneapolis permit records from 2016 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 52 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 1 |
| 2017 | 10 |
| 2018 | 13 |
| 2019 | 10 |
| 2020 | 5 |
| 2021 | 4 |
| 2022 | 7 |
| 2024 | 1 |
| 2026 | 1 |
Busiest year on record: 2018, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 211 1ST ST N | 2026-07-02 |
| 550 LAKE ST W | 2024-06-14 |
| 3900 ELLIOT AVE | 2022-11-23 |
| 3901 CHICAGO AVE | 2022-11-23 |
| 1475 CURRIE AVE W | 2022-11-08 |
| 2850 NORTH WAYZATA BLVD | 2022-07-14 |
| 2840 NORTH WAYZATA BLVD | 2022-06-16 |
| 711 8TH ST SE | 2022-06-01 |
| 3012 EXCELSIOR BLVD | 2022-02-15 |
| 4440 SNELLING AVE | 2021-10-29 |
| 1307 4TH ST SE | 2021-10-14 |
| 500 LAKE ST W | 2021-03-29 |
| 810 7TH ST S | 2021-03-29 |
| 1301 OLSON MEMORIAL HWY | 2020-12-21 |
39 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
52 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1164805 | 2026-07-02 | General construction | 211 1ST ST N | Apartment conversion of the existing International Design Center building into 42 market rate units. Remodel of Basement, Levels 2, 3, and 4 -ACW certificate of occupancy requi | |
| BLDG1019953 | 2024-06-14 | General construction | 550 LAKE ST W | New 110-unit Apartment BLDG CAIM for Window Cleaning Roof Anchors approved 11/13/24 Approved 3 Rev. Aftr Issuance; Chain link fence, 3hr door, small Elev Eqmt Rm. 10/24/24. C | |
| BLDG968157 | 2022-11-23 | General construction | 3900 ELLIOT AVE | New 20 Unit Apartment Building CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIFICATE OF OCCUP | |
| BLDG968132 | 2022-11-23 | General construction | 3901 CHICAGO AVE | Convert portions of existing building to apartments CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDUL | |
| BLDG958197 | 2022-11-08 | General construction | 1475 CURRIE AVE W | NEW 187 APARTMENTS BUILDING WITH 220 PARKING INSTALLS (MAA) BUILDING IS IN FLOODPLAIN: FLOOD PLAIN LEVEL 909.9', FLOOD PROTECTION ELEVATION 814 ***** AS PER ARCHITECT ROOF ANCHO | |
| BLDG920539 | 2022-07-14 | General construction | 2850 NORTH WAYZATA BLVD | Construct 100 unit w/ 1 guest suite Senior housing apartment building over lower level enclosed parking. certificate of occupancy required: yes CONST TYPE: 1 level of 1A with | |
| BLDG920542 | 2022-06-16 | General construction | 2840 NORTH WAYZATA BLVD | Construct 100 unit Senior housing apartment building over lower level enclosed parking. certificate of occupancy required: yes CONST TYPE: 1 level of 1A with 5 floors of 3A ab | |
| BLDG888841 | 2022-06-01 | General construction | 711 8TH ST SE | CONSTRUCT SLAB ON GRADE 60 UNIT 6 STORY APARTMENT BUILDING, FIRST FLOOR WILL HAVE ONE RETAIL SPACE (MAA) certificate of occupancy required: YES Note: R2 Apartment with S2 (enclos | |
| BLDG917683 | 2022-02-15 | General construction | 3012 EXCELSIOR BLVD | New High-Rise, Mixed Use 73 Unit Apartment Building Approved CAIM for trash chute venting attached to approved documents and in ELMS (permit and Building Record BLDG925031) cer | |
| BLDG882456 | 2021-10-29 | General construction | 4440 SNELLING AVE | 100 UNITS. NO RETAIL. COMMUNITY ROOM LEVEL 1. FOUR STORIES WOOD CONSTRUCTION ON CONCRETE SLAB. NO BASEMENT. WINDOWS IN COMMUNITY ROOM AT LEVEL 1 CORRIDOR TO BE 45 MIN RATED PE | |
| BLDG896273 | 2021-10-14 | General construction | 1307 4TH ST SE | construct 7 story 81 unit apartment building. certificate of occupancy required: yes Note: R2 Apartment with S2 (enclosed or open) parking garage and 1st floor space for future co | |
| BLDG851755 | 2021-03-29 | General construction | 500 LAKE ST W | (DMH - ProjectDox) CONSTRUCT 7-STORY MIXED USE, 132 UNIT APARTMENT BUILDING. 1 LEVEL BELOW GRADE PARKING AND GRADE LEVEL PARKING, MAIN LEVEL MIXED USE AND 5 STORIES RESIDENTIAL A | |
| BLDG819353 | 2021-03-29 | General construction | 810 7TH ST S | construct/expand new elevator shaft in place of existing. sck | |
| BLDG848907 | 2020-12-21 | General construction | 1301 OLSON MEMORIAL HWY | CONSTRUCT 5 STORY 92 UNIT APARTMENT BUILDING WITH ONE STORY UNDERGROUND PARKING, NO COMMERCIAL SPACE (MAA) TYPE IA BASEMENT LEVEL (GARAGE) AND 5 STORY, TYPE IIIB WOOD FRAMING ABO | |
| BLDG853672 | 2020-12-17 | General construction | 1125 2ND ST S | construct 12 story 225 unit apartment building. sck 2 levels below grade parking certificate of occupancy required: yes There are no commercial spaces in this building. CONS | |
| BLDG809465 | 2020-03-11 | General construction | 1611 8TH ST SE | EXISTING BUILDING REMODEL. HALF THE BUILDING TO REMAIN AS DWELLING UNITS, THE OTHER HALF TO GET STRUCTURAL MODIFICATIONS AND BECOME 2 STORIES OF PARKING, AND 5 STORIES OF DWELLING | |
| BLDG817867 | 2020-02-07 | General construction | 810 7TH ST S | REMOVE & INFILL EXISTING 1 STORY BLDG BUMPOUT. The abandoned gym exit is replaced thru east wall but the north exit door remains in service to serve lower levels.. Architect: Bec | |
| BLDG784742 | 2020-01-28 | General construction | 309 ULYSSES ST NE | Full Construction - 56 Unit Mixed Use Building ***** CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A | |
| BLDG805882 | 2019-12-27 | General construction | 20 LOWRY AVE NE | NEW 128 UNIT 5 STORY APARTMENT BUILDING WITH BASEMENT PARKING, A2 AND M ON MAIN FLOOR (MAA) THERMAX RIGID INSULATION IS TESTED IN OCCORDANCE WITH NFPA 285 AS PER ESR-1659 ATTACHED | |
| BLDG797828 | 2019-12-19 | General construction | 1119 4TH ST SE | (DMH#1) CONSTRUCT 5-LEVEL, 64 UNIT APT BUILDING WITH ENCLOSED PARKING AT GRADE. SPRINKLER INCREASE TAKEN FOR ADDED STORY. SEPARATE PERMIT ISSUED FOR FOOTING/FOUNDATION UNDER BLDG 7 | |
| BLDG798314 | 2019-10-30 | General construction | 1611 8TH ST SE | construct footings, foundations, steel framing and composite concrete floor slabs in preparation for apartment building addition. sck*** engineer: milkert******special inspections | |
| BLDG785761 | 2019-09-23 | General construction | 821 6TH AVE SE | (DMH#1) CONSTRUCT 5-STORY, 51 UNIT RESIDENTIAL APT BUILDING WITH AT-GRADE INDOOR PARKING AND MAIN FLOOR COMMON SPACE. AREA AND SPRINKLER INCREASES TAKEN. >>Certificate of Occupancy | |
| BLDG756611 | 2019-09-06 | General construction | 410 LAKE ST W | CONSTRUCT NEW MIXED USE BUILDING, 111 APARTMENTS AND 1ST FLOOR COMMERCIAL SPACE._____________ PDR PLAN6473 ----- certificate of occupancy required: yes Note: R2 Apartment with S2 ( | |
| BLDG749445 | 2019-08-08 | General construction | 721 3RD ST N | Full Construction - Bassett Creek East Apartments/Mixed Use (139 Units)***** CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 61 | |
| BLDG758367 | 2019-07-31 | General construction | 1220 BROOK AVE SE | New 50 unit apartment building with associated parking an amenities. Work in connection with permit BLDG710568 certificate of occupancy required: YES Note: R2 Apartment with S | |
| BLDG751302 | 2019-07-12 | General construction | 95 10TH ST S | Remodel structure into 2 separate buildings (Handicraft bldg and assembly bldg). Spaces to be shell in prep for future tenants. Additional permits are required for any occupancy | |
| BLDG761190 | 2019-05-14 | General construction | 809 LAKE ST E | New 48 unit mixed use building **May 7 removed F&F permit BLDG 750999 value of $536,764 so corrected value this permit $6396560 ****certificate of occupancy IS required: ***: R2 Ap | |
| BLDG744541 | 2019-02-06 | General construction | 618 9TH AVE S | Construction of 6 story 169 unit building with 2 levels of underground parking. CERTIFICATE OF OCCUPANCY REQUIRED YES CONST TYPE: IIIA/1A NUMBER OF STORIES: 5/1 OCCUPANCY: R2/S2 20 | |
| BLDG732259 | 2018-10-23 | General construction | 428 2ND ST S | ADD SPECIAL LOCKING ARRANGEMENT FOR STAIR C LEVEL 2 MEMORY CARE AREA (JAG) SECURE STAIR SHAFT SIDE REENTRY ACCESS AT EXISTING CONTROLLED EXIT PER SECTION 1008.1.9.6. KEY FOB AND | |
| BLDG732258 | 2018-10-12 | General construction | 428 2ND ST S | install new cabinets sink and appliances in community gathering space. No change in occupancy or use ARCHITECT: BKV - Michael Krych #23555 | |
| BLDG710726 | 2018-09-21 | General construction | 401 UNIVERSITY AVE SE | NEW 5 STORY APARTMENT BUILDING WITH 43 UNITS AND 43 PARKING INSTALL. TYPE I-A MAIN FLOOR AND 4 FLOOR OF VA ABOVE (MAA#01) TYPE A UNIT = 307 CERTIFICATE OF OCCUPANCY REQ | |
| BLDG719828 | 2018-09-17 | General construction | 91 10TH ST S | REPAIR EXTERIOR WINDOWS. TUCKPOINTING OF EXTERIOR MASONRY WALLS. NEW ASPHALT SHINGLE ROOFING AT REAR PORTION OF STRUCTURE. NEW TEMPORARY ENTRY STOOP REMODEL FOR TEMPORARY | |
| BLDG694172 | 2018-08-22 | General construction | 205 PARK AVE | CONSTRUCT 6 STORY, 122 DWELLING UNIT APARTMENT BUILDING. (MAA #01) WITH 137 PARKING STALLS IN THE BASEMENT - 205, 823 SQFT $4,500,000 WAS THE VALUE OF FOOTING AND FOUNDATION PERMIT | |
| BLDG719833 | 2018-08-15 | General construction | 91 10TH ST S | INTERIOR NON-STRUCTURAL DEMO IN PREP FOR FUTURE REMODELING ADDITIONAL PERMITS REQUIRED FOR OCCUPANCY | |
| BLDG701580 | 2018-08-07 | General construction | 3001 4TH ST SE | NEW 5 STORY ON TOP OF PRECAST PODIUM. certificate of occupancy required: yes Note: R2 Apartment with S2 (enclosed or open) parking garage and 1st floor space for future co | |
| BLDG710568 | 2018-07-12 | General construction | 1220 BROOK AVE SE | 5 STORY APARTMENT BUILDING WITH 95 UNITS (15 AFFORDABLE UNITS) INCLUDING ONE SUBLEVEL FOR PARKING, 57 STALLS, TYPE I-A MAIN FLOOR AND III A ABOVE (MAA#01) ***************THI | |
| BLDG702369 | 2018-04-10 | General construction | 95 10TH ST S | SAC (180108A1) only payment for City Club Apartments. 300 charges were pad on permit (BLDG656677) but one charge was not collected. This permit is to collect that one outstanding S | |
| BLDG656677 | 2018-03-15 | General construction | 95 10TH ST S | New 307 unit 17 story building CERTIFICATE OF OCCUPANCY REQUIRED CONST TYPE: I-A NUMBER OF STORIES: 17 OCCUPANCY: R-2 2015 MSBC SPRINKLERED: YES SPRINKLER TYPE: NFPA 13 FIRE ALARM: | |
| BLDG695509 | 2018-03-13 | General construction | 428 2ND ST S | Revise door 249 to divide level 2 memory care into Assisted Living and Memory Care. Occupancy to remain I_1. See BKV code memo dated 2/14/18 for hardware revisions. const type | |
| BLDG694974 | 2018-03-13 | General construction | 428 2ND ST S | REVISION 5/15/2018 (MAA) AS PER BUILDING INSPECTOR TODD HOEKSTRA All of the work was completed per the approved plans, with the exception of units 308, 309, and 310 which w | |
| BLDG695522 | 2018-02-15 | General construction | 428 2ND ST S | Interior demo only in units 112-113-114, 308-309-310, 408-409-410, 508-509-510, 319-320, 419-420, 519-520 ( Combine18 units into 7 units). (DMH#2) No work in corridors or common | |
| BLDG677423 | 2017-10-04 | General construction | 4750 53RD ST E | EXTERIOR SIDING REPLACEMENT (REMOVE AND REPLACE FIBER CEMENT SIDING), FLASHING AT WINDOWS AND DECKS AT VARIOUS LOCATIONS OF CONDO BUILDING DUE TO WATER DAMAGE. NO PLANS. (LAH) | |
| BLDG675367 | 2017-09-22 | General construction | 515 WASHINGTON AVE N | alterations to canopy at side entry and new sloped walk, steps and landings at same. sck#1 | |
| BLDG665830 | 2017-08-07 | General construction | 708 3RD ST S | construction of two model hotel rooms on level 5 east. sck#1 architect DLR | |
| BLDG647722 | 2017-06-05 | General construction | 3430 LIST PL | ALTER VACANT FLOOR TO 5 NEW RESIDENTIAL UNITS ON 21ST FLOOR OF APT STRUCTURE AND CONCEALED CEILING WORK ON 20TH FLOOR FOR PIPING CHASES. 113 UNIT BUILDING. 1 A ACCESSIBLE UNIT TH | |
| BLDG628433 | 2017-05-08 | General construction | 240 CHICAGO AVE | Construct new 180 unit apartment building with underground parking garage. CERTIFICATE OF OCCUPANCY REQUIRED CONST TYPE: III-A over I-A special provisions 510.2 NUMBER OF STORIES: | |
| BLDG651191 | 2017-04-27 | General construction | 701 MAIN ST SE | remove stucco on north elevations and replace with new insulation, sheathing, and fiber cement siding. replace rotten framing as it is encountered. reinstall existing windows if n | |
| BLDG651190 | 2017-04-27 | General construction | 601 MAIN ST SE | remove stucco on north elevations and replace with new insulation, sheathing, and fiber cement siding. replace rotten framing as it is encountered. reinstall existing windows if n | |
| BLDG647285 | 2017-04-10 | General construction | 3430 LIST PL | INTERIOR DEMO OF OLD 1964 RESTAURANT APPROX 260 SEATS AT 22ND FLOOR OF CONDO BUILDING. ENTIRE FLOOR DEMO OF BATHS, KITCHEN AND SEATING. MAINTAIN ELEVATOR SHAFT PROTECTION (IN LIEU | |
| BLDG637851 | 2017-03-13 | General construction | 515 WASHINGTON AVE N | install bathrooms in final locations on 2nd, 3rd, and 4th floors. sck#2 value of this work was included in previous permits - minimum fee assigned to this permit. certificate of oc |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
