COMPANY RECORD · MINNEAPOLIS, MN
(Solar Work) Apadana LLC — permit history in Minneapolis, MN
(Solar Work) Apadana LLC appears on 117 Minneapolis permit records from 2017 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 117 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2017 | 2 |
| 2018 | 1 |
| 2019 | 8 |
| 2020 | 25 |
| 2021 | 15 |
| 2022 | 12 |
| 2023 | 16 |
| 2024 | 14 |
| 2025 | 17 |
| 2026 | 7 |
Busiest year on record: 2020, with 25 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2840 33RD AVE S | 2026-08-12 |
| 929 CENTRAL AVE NE | 2026-08-05 |
| 3400 LAKE ST E | 2026-07-08 |
| 3950 THOMAS AVE N | 2026-07-02 |
| 2214 RUSSELL AVE N | 2026-06-24 |
| 1800 GLENWOOD AVE | 2026-03-12 |
| 2535 CLINTON AVE | 2026-01-08 |
| 2315 CHICAGO AVE | 2025-12-04 |
| 2219 CHICAGO AVE | 2025-10-30 |
| 3656 45TH AVE S | 2025-10-30 |
| 1414 48TH ST E | 2025-10-30 |
| 5157 16TH AVE S | 2025-10-17 |
| 3031 FILLMORE ST NE | 2025-09-30 |
| 3841 OAKLAND AVE | 2025-09-29 |
116 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
117 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1188343 | 2026-08-12 | General construction | 2840 33RD AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __56.3__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1189690 | 2026-08-05 | General construction | 929 CENTRAL AVE NE | Installation of 34.03 kWdc, 27.3 kWac Roof mounted solar PV system. INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. Structural Engineer: Ali Kiyan #19687 INSTALLATION MUS | |
| BLDG1186637 | 2026-07-08 | General construction | 3400 LAKE ST E | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 88.0 KW Structural Engineer: Ali Kiyan #19687 ADDITIONAL PERMITS: PV SYSTEMS A | |
| BLDG1186049 | 2026-07-02 | General construction | 3950 THOMAS AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __7.38__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1183429 | 2026-06-24 | General construction | 2214 RUSSELL AVE N | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SOINGLEFAMILY HOUSE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROOF ACCESS ON | |
| BLDG1160691 | 2026-03-12 | General construction | 1800 GLENWOOD AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __20.68__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1158468 | 2026-01-08 | General construction | 2535 CLINTON AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY __56.16__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1151011 | 2025-12-04 | General construction | 2315 CHICAGO AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __46.48__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1148518 | 2025-10-30 | General construction | 2219 CHICAGO AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __26.56__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1147081 | 2025-10-30 | General construction | 3656 45TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.125__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1147738 | 2025-10-30 | General construction | 1414 48TH ST E | SOLAR. (JJL) ENGINEER THAT CHECKED ROOF: ESTEPHAN ENGINEERING - HENRY ESTEPHAN #21541 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPAC | |
| BLDG1147039 | 2025-10-17 | General construction | 5157 16TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __7.11__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1143548 | 2025-09-30 | General construction | 3031 FILLMORE ST NE | Install residential roof top solar. 10.25 kW DC / 8.125 kW AC | |
| BLDG1144092 | 2025-09-29 | General construction | 3841 OAKLAND AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _5.525___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1138032 | 2025-09-15 | General construction | 3032 MINNEHAHA AVE | INSTALL 24.07 kW SOLAR SYSTEM 2020 MSBC | |
| BLDG1139153 | 2025-09-12 | General construction | 1900 22ND ST E | SOLAR. (JJL) 47.08 KW DC ENGINEER WHO REVIEWED ROOF FOR ADDITIONAL SOLAR LOADS: APADANA ENGINEERING - ALI KIYAN #19687 | |
| BLDG1137908 | 2025-08-25 | General construction | 3561 MINNEHAHA AVE | SOLAR. (JJL) 71.8 KW DC ENGINEER CHECKING EXISTING STRUCTURE: ALI KIYAN #19687 | |
| BLDG1122503 | 2025-06-09 | General construction | 2806 27TH AVE S | SOLAR. (JJL) ROOF WAS DESIGNED TO ACCOMADATE NEW SOLAR LOADS. SEE ORIGINAL STRUCTURAL DRAWINGS AND LETTER FROM APADANA ENGINEERING. ENGINEER: ALI KIYAN #19687 41.5 KW DC/34.6 | |
| BLDG1113645 | 2025-05-15 | General construction | 560 HUMBOLDT AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 58.1 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 S | |
| BLDG1112416 | 2025-05-08 | General construction | 5032 HUMBOLDT LN N | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. COLLECTOR CAPACITY 4.51 KW. SOLAR CHECKLIST COMPLETED. 2020 IRC A 36" wide pathway complyin | |
| BLDG1114455 | 2025-05-02 | General construction | 525 HUMBOLDT AVE N | SOLAR. (JJL) ROOF ENGINEER: ALI KIYAN #19687 ENGINEER OF RECORD: JOHN ELLIOTT #12408 | |
| BLDG1113058 | 2025-04-17 | General construction | 3640 23RD AVE S | SOLAR. (JJL) ENGINEER THAT CHECKED EXISTING STRUCTURAL SYSTEM: APADANA ENGINEERING - ALI KIYAN #19687 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. | |
| BLDG1112574 | 2025-04-11 | General construction | 3807 XERXES AVE S | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. COLLECTOR CAPACITY 9.72 KW. SOLAR CHECKLIST COMPLETED. 2020 IRC A 36" wide pathway complyin | |
| BLDG1111358 | 2025-04-01 | General construction | 2421 BLOOMINGTON AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __21.165__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325. | |
| BLDG1099779 | 2024-12-19 | General construction | 485 MALCOLM AVE SE | SOLAR. PERIMETER PATH REQUIRED PER SECTION 3111.3.4.2.1 (JJL) ENGINEER THAT CONFIRMED ROOF IS ADEQUATE TO SUPPORT NEW LOAD: ALI KIYAN #19687 INSTALL A SOLAR PV SYSTEM ON ROO | |
| BLDG1067353 | 2024-08-30 | General construction | 3928 NICOLLET AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __55.6__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1067396 | 2024-08-13 | General construction | 2704 BRYANT AVE N | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF(S) OF EXISTING SINGLE FAMILY HOUSE AND DETACHED GARAGE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE | |
| BLDG1059288 | 2024-08-01 | General construction | 2855 CHICAGO AVE | Carport solar PV system on parking ramp (JJL) Structural: R Bennett #54890 and B Henderson #47994 COLLECTOR CAPACITY _1128.05___ KW ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIR | |
| BLDG1067161 | 2024-07-19 | General construction | 2914 DUPONT AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY _10.44___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1 | |
| BLDG1066829 | 2024-07-12 | General construction | 811 31ST AVE N | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _10.8___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PE | |
| BLDG1067398 | 2024-07-09 | General construction | 2207 QUEEN AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __10.8__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1062284 | 2024-05-31 | General construction | 1315 LOWRY AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. ENGINEER: ALI A. KIYAN #19687 COLLECTOR CAPACITY _95.53___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN | |
| BLDG1047766 | 2024-03-07 | General construction | 1401 21ST ST E | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD AND DETACHED GARAGE. COLLECTOR CAPACITY 8.28 KW. SOLAR CHECKLIST COMPLETED. 2020 IRC A | |
| BLDG1044229 | 2024-02-22 | General construction | 1501 PORTLAND AVE | INSTALLING SOLAR PANEL ON THE ROOF OF APARTMENTS. 51.66 KW DC/34.20 KW AC ENGINEER: ALI A. KIYAN #19687 | |
| BLDG1044234 | 2024-02-15 | General construction | 2727 FREMONT AVE N | installing solar system on house and garage (MAA) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _8___ KW SOLAR CHECKLIST ATTACH | |
| BLDG1044230 | 2024-02-15 | General construction | 3851 6TH ST N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDINGS - HOUSE & GARAGE COLLECTOR CAPACITY __8.28__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PE | |
| BLDG1042318 | 2024-02-02 | General construction | 187 HUMBOLDT AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __58,630__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325 | |
| BLDG1041079 | 2024-01-25 | General construction | 2933 2ND ST N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __43.6__ KW 2020 MSBC | |
| BLDG1035845 | 2023-12-11 | General construction | 810 7TH ST S | SOLAR. (JJL) ENGINEER: ALI KIYAN #19687 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _47.97___ KW SOLAR CHECKLIST ATTACHED. | |
| BLDG1035640 | 2023-12-07 | General construction | 3057 14TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __28.29__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1033172 | 2023-11-17 | General construction | 3901 CHICAGO AVE | SOLAR: (JJL) ENGINEER: APADANA SOLAR - ABDOLOLREZA ASSADI #20342 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _27.88___ KW S | |
| BLDG1033167 | 2023-11-17 | General construction | 3900 ELLIOT AVE | (DMH-ProjectDox) INSTALL BALLASTED PHOTOVOLTAIC SOLAR PANEL SYSTEM ON ROOF OF APARTMENT BUILDING. COLLECTOR CAPACITY: 31.98 KW 2020 MNSCB. See Approved proprietary compu | |
| BLDG1032168 | 2023-11-13 | General construction | 1114 RUSSELL AVE N | HPC/roof mount PV solar system INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.2__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS | |
| BLDG1029637 | 2023-11-13 | General construction | 915 SHERIDAN AVE N | SOLAR (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __5.74__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT P | |
| BLDG1022453 | 2023-10-11 | General construction | 1020 NEWTON AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8__ KW ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE AN ELECTRICAL PERMIT (STATE OF | |
| BLDG1022489 | 2023-10-05 | General construction | 633 VAN BUREN ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _33.75___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 132 | |
| BLDG1022099 | 2023-10-03 | General construction | 3950 SHERIDAN AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) COLLECTOR CAPACITY __8.0__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 132 | |
| BLDG1000903 | 2023-06-30 | General construction | 3330 OLIVER AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.0__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG999975 | 2023-06-13 | General construction | 3326 EMERSON AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp | |
| BLDG995741 | 2023-05-22 | General construction | 1105 16TH AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY _22.96___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 132 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →