COMPANY RECORD · MINNEAPOLIS, MN
Cedar Creek Energy Corp — permit history in Minneapolis, MN
Cedar Creek Energy Corp appears on 96 Minneapolis permit records from 2016 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 96 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2016 | 1 |
| 2017 | 1 |
| 2018 | 2 |
| 2019 | 11 |
| 2020 | 10 |
| 2021 | 11 |
| 2022 | 15 |
| 2023 | 12 |
| 2024 | 14 |
| 2025 | 13 |
| 2026 | 6 |
Busiest year on record: 2022, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 5440 PENN AVE S | 2026-06-04 |
| 2529 25TH AVE S | 2026-06-04 |
| 2027 FRANKLIN AVE E | 2026-05-01 |
| 1714 BUCHANAN ST NE | 2026-03-04 |
| 3333 ARTHUR ST NE | 2026-02-19 |
| 2115 HARRIET AVE | 2026-02-12 |
| 550 LAKE ST W | 2025-11-26 |
| 2700 SUNSET BLVD | 2025-10-20 |
| 2750 1ST AVE S | 2025-10-15 |
| 811 GLENWOOD AVE | 2025-10-01 |
| 3936 43RD AVE S | 2025-10-01 |
| 403 LAKE ST E | 2025-09-24 |
| 4525 16TH AVE S | 2025-08-05 |
| 5529 NEWTON AVE S | 2025-03-13 |
95 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
96 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDG1179367 | 2026-06-04 | General construction | 5440 PENN AVE S | SOLAR. (JJL) STRUCTURAL EVALUATION BY BERNIE STROH, PE #14269 15.84 KW DC 11.52 KW AC | |
| BLDG1179249 | 2026-06-04 | General construction | 2529 25TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __59.16__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1174435 | 2026-05-01 | General construction | 2027 FRANKLIN AVE E | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _71.3___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1166433 | 2026-03-04 | General construction | 1714 BUCHANAN ST NE | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 9.35 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying wi | |
| BLDG1164706 | 2026-02-19 | General construction | 3333 ARTHUR ST NE | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 10.56 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1164031 | 2026-02-12 | General construction | 2115 HARRIET AVE | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF BUILDING. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE MIN. 18" ROOF ACCESS ON EACH SIDE OF ROOF R | |
| BLDG1151408 | 2025-11-26 | General construction | 550 LAKE ST W | (DMH-Pdox) INSTALL BALLASTED PV SOLAR PANEL SYSTEM ON ROOF OF 7-STORY APT BLDG. - 2020 IBC COLLECTOR CAPACITY 60.30 KW. ENGINEER OF RECORD: BERNIE STROH, #14269 ATTACHED | |
| BLDG1147929 | 2025-10-20 | General construction | 2700 SUNSET BLVD | (DMH-Pdox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. - 2020 IRC COLLECTOR CAPACITY 5.525 KW. SOLAR CHECKLIST COMPLETED. A 36" wide pathway complying w | |
| BLDG1147895 | 2025-10-15 | General construction | 2750 1ST AVE S | install rooftop ballasted 74.24 KW solar system. | |
| BLDG1143875 | 2025-10-01 | General construction | 811 GLENWOOD AVE | SOLAR. EXISTING PANELS TO BE REMOVED AND NEW PANELS INSTALLED. (JJL) ENGINEER: P. PALANISAMI #11381 (EXISTING ROOF EVALUATION) ENGINEER: SADDAM AHMAD #55381 (SOLAR ENGINEER) | |
| BLDG1137821 | 2025-10-01 | General construction | 3936 43RD AVE S | INSTALL 7.225 kW (DC) FLUSH SOLAR PV SYSTEM (1 ARRAY/17 MODULES) AT SOUTH SIDE ROOF SLOPE OF SFD AND INSTALL TESLA "POWERWALL 3" ENERGY STORAGE SYSTEM IN APPROX. 8'x7' UNFINISHED S | |
| BLDG1143547 | 2025-09-24 | General construction | 403 LAKE ST E | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __39.75__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1134861 | 2025-08-05 | General construction | 4525 16TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 6.3 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Su | |
| BLDG1108925 | 2025-03-13 | General construction | 5529 NEWTON AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __6.375__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1 | |
| BLDG1105921 | 2025-02-11 | General construction | 4200 32ND AVE S | Install Ballasted Rooftop Solar Array INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 43.5 KW INSTALLATION MUST MEET OR EXCEED SRCC | |
| BLDG1103438 | 2025-01-27 | General construction | 5257 36TH AVE S | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. COLLECTOR CAPACITY 4.675 KW. SOLAR CHECKLIST COMPLETED. 2020-IRC A 36" wide pathway com | |
| BLDG1102696 | 2025-01-14 | General construction | 2400 PARK AVE | INSTALL BALLASTED PHOTOVOLTAIC SOLAR PANEL SYSTEM ON ROOF OF OFFICE BUILDING - addition to BLDG1090904 - additional 69.60 kW 2020 MNSBC. ROOF STRUCTURE ENGINEER OF RECORD: BE | |
| BLDG1102615 | 2025-01-14 | General construction | 3800 WASHINGTON AVE N | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING COMMERCIAL BUILDING. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE ROOF ACCESS AND PATHWAY | |
| BLDG1102478 | 2025-01-09 | General construction | 3841 11TH AVE S | SOLAR. (JJL) ENGINEER: SCOTT WYSSLING - #57927 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.085__ KW SOLAR CHECKLIST | |
| BLDG1090904 | 2024-11-05 | General construction | 2400 PARK AVE | (DMH-ProjectDox) INSTALL BALLASTED PHOTOVOLTAIC SOLAR PANEL SYSTEM ON ROOF OF OFFICE BUILDING. COLLECTOR CAPACITY: 83.52 KW 2020 MNSCB. See Approved proprietary compute | |
| BLDG1087793 | 2024-11-01 | General construction | 905 PARK AVE | INSTALL A BALLASTED SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 44.62 KW Engineer: Bernie Stroh #14269 ADDITIONAL PERMITS: PV SYSTEM | |
| BLDG1090854 | 2024-11-01 | General construction | 2825 PARK AVE | (DMH-ProjectDox) INSTALL BALLASTED PHOTOVOLTAIC SOLAR PANEL SYSTEM ON ROOF OF APARTMENT BUILDING. COLLECTOR CAPACITY: 26.88 KW 2020 MNSCB. See Approved proprietary com | |
| BLDG1089305 | 2024-10-24 | General construction | 2200 FREMONT AVE N | (DMH-ProjectDox) INSTALL BALLASTED PHOTOVOLTAIC SOLAR PANEL SYSTEM ON ROOF OF 2-STORY BUILDING. COLLECTOR CAPACITY: 48.70KW ENGINEER FOR BUIDLING STRUCTURE: BERNIE STROH, | |
| BLDG1072897 | 2024-07-22 | General construction | 2743 BENJAMIN ST NE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 8.075 KW Engineer: Trevor Jones #62101 INSTALLATION MUST MEET OR EXCEED SRCC CE | |
| BLDG1064372 | 2024-06-18 | General construction | 923 WEST MINNEHAHA PKWY | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON DETACHED GARAGE ROOF OF SFD. COLLECTOR CAPACITY 8.8KW. SOLAR CHECKLIST COMPLETED. 2020 IRC APPLICANT | |
| BLDG1061009 | 2024-05-20 | General construction | 4056 31ST AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. ENGINEER'S LETTER PROVIDES CONNECTION DIRECTION COLLECTOR CAPACITY _8.5___ KW SOLAR CHECKLIST ATTACHE | |
| BLDG1055157 | 2024-04-23 | General construction | 4401 YORK AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __12.3__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG1052689 | 2024-04-09 | General construction | 3730 ABBOTT AVE S | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __16.4__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT P | |
| BLDG1041220 | 2024-01-29 | General construction | 3912 UPTON AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY ____ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325 | |
| BLDG1040560 | 2024-01-23 | General construction | 2607 2ND AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __13.02__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325. | |
| BLDG1040288 | 2024-01-23 | General construction | 485 MALCOLM AVE SE | roof top solar INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __73.14__ KW Engineer: R Bonniwell #53964 ADDITIONAL PERMITS: PV SYSTEMS ALSO R | |
| BLDG1040618 | 2024-01-22 | General construction | 2301 CALIFORNIA ST NE | rooftop solar Engineer: B Stroh #14269 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _193.3___ KW ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE AN | |
| BLDG1040531 | 2024-01-18 | General construction | 3653 41ST AVE S | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD AND ATTACHED GARAGE. COLLECTOR CAPACITY 13.940 KW. SOLAR CHECKLIST COMPLETED. 2020 IRC A | |
| BLDG1035751 | 2023-12-14 | General construction | 2402 38TH ST E | roof mounted ballasted solar array COLLECTOR CAPACITY 18.0 KW ENGINEER: Bernie Stroh #14269 ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE AN ELE | |
| BLDG1035075 | 2023-12-11 | General construction | 1207 GLENWOOD AVE | SOLAR ON ROOF. (JJL) ENGINEER: BERNIE STROH #14269 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _98.4___ KW SOLAR CHECKLIST | |
| BLDG1035635 | 2023-12-04 | General construction | 3600 CEDAR AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. Structural: B Stroh #14269 ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE AN ELECTRICAL PERMIT (STATE OF MN). INSPECTIO | |
| BLDG1011556 | 2023-08-10 | General construction | 4600 STEVENS AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __13.475__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 13 | |
| BLDG1011324 | 2023-08-07 | General construction | 4120 EWING AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SINGLE FAMILY HOUSE WITH ATTACHED GARAGE. AAJ (PROJECT DOX PLANS AND DOCUMENTS). ***PROVIDE RO | |
| BLDG1011326 | 2023-08-07 | General construction | 6128 THOMAS AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. Structural approval of existing: E Munyanziza #61220 COLLECTOR CAPACITY _6.09___ KW SOLAR CHECKLIST AT | |
| BLDG997231 | 2023-05-30 | General construction | 101 MELBOURNE AVE SE | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON SINGLE FAMILY HOUSE AND DETACHED GARAGE ROOFS. AAJ (PROJECT DOX PLAN AND DOCUMENTS). ***PROVIDE ROOF ACCESS AND | |
| BLDG990386 | 2023-04-26 | General construction | 4533 ZENITH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 14.82 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.110 | |
| BLDG987174 | 2023-04-26 | General construction | 3341 45TH AVE S | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON ROOF OF EXISTING SINGLE FAMILY HOUSE AND DETACHED GARAGE ROOF.(PROJECT DOX PLAN AND DOCUMENTS). ***PROVIDE ROO | |
| BLDG985465 | 2023-03-31 | General construction | 505 MALCOLM AVE SE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) ENGR BERNARD STROH 14269 COLLECTOR CAPACITY __104.2__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC | |
| BLDG980209 | 2023-02-02 | General construction | 5256 37TH AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) COLLECTOR CAPACITY __5.04__ KW ENGR: ARASH ZANDIEH 59340 SOLAR CHECKLIST ATTACHED. MEETS OR EXCEE | |
| BLDG975302 | 2023-01-03 | General construction | 5924 RUSSELL AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 7.6 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 | |
| BLDG974231 | 2022-12-13 | General construction | 2007 EMERSON AVE N | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) BERNARD STROH 14269 COLLECTOR CAPACITY _10 KW DC, 10 KW AC___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EX | |
| BLDG968112 | 2022-12-06 | General construction | 5309 47TH AVE S | INSTALL 6.40 kW (DC) FLUSH ROOF-MOUNT SOLAR PV SYSTEM ON SOUTH AND EAST SLOPES OF SFD ROOF. STRUCTURAL ENGINEER - EVALUATION OF EXISTING ROOF STRUCTURE: ARASH ZANDIEH #59340 (AHZ | |
| BLDG970223 | 2022-12-06 | General construction | 3300 HOLMES AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __7.2__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325. | |
| BLDG947986 | 2022-10-25 | General construction | 3553 43RD AVE S | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 10.08 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.11 | |
| BLDG955685 | 2022-08-23 | General construction | 1915 CLINTON AVE | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _9.28___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 132 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Minneapolis permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →