COMPANY RECORD · CHICAGO, IL
Cyberdyne Masonary Corp. — permit history in Chicago, IL
Cyberdyne Masonary Corp. appears on 49 Chicago permit records from 2006 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 49 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2006 | 1 |
| 2007 | 1 |
| 2008 | 1 |
| 2009 | 3 |
| 2010 | 4 |
| 2012 | 2 |
| 2013 | 3 |
| 2014 | 1 |
| 2015 | 3 |
| 2016 | 10 |
| 2017 | 8 |
| 2018 | 4 |
| 2019 | 3 |
| 2021 | 2 |
| 2022 | 2 |
| 2026 | 1 |
Busiest year on record: 2016, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| R. Carrozza Plumbing Co | 9 | 2017-11-06 |
| C. R. Leonard Plumbing And | 7 | 2017-12-29 |
| Qu-Bar, Inc | 6 | 2016-02-29 |
| Automatic Mech Servic | 5 | 2017-07-25 |
| Atomatic Mechanical | 4 | 2017-11-06 |
| National Heat & Power Corp. | 4 | 2021-06-29 |
| Lyons Electric Company Inc | 4 | 2021-06-29 |
| Rosset Electric Co. | 3 | 2016-05-26 |
| Rex Elect. & Technologies LLC | 3 | 2017-11-06 |
| Richmond Electric Co. Inc. | 3 | 2018-04-20 |
| Dekalb Mechanical | 3 | 2010-07-23 |
| Peak Electric, Inc. | 2 | 2022-04-26 |
70 companies are named alongside Cyberdyne Masonary Corp. on the same Chicago permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2722 S DR MARTIN L KING JR DR | 2026-05-20 |
| 12260 S CARONDOLET AVE | 2022-04-26 |
| 1928 S JOURDAN CT | 2022-01-13 |
| 924 S MORGAN ST | 2021-06-29 |
| 839 W 79TH ST | 2021-02-10 |
| 840 E 59TH ST | 2019-08-16 |
| 201 E 111TH ST | 2019-04-26 |
| 3546 W ADDISON ST | 2018-11-02 |
| 7740 S WESTERN AVE | 2018-04-25 |
| 1 N STATE ST | 2018-04-24 |
| 3434 S MICHIGAN AVE | 2018-04-20 |
| 135 N KEDZIE AVE | 2017-12-29 |
| 939 W FULTON MARKET | 2017-11-06 |
| 10441 S SEELEY AVE | 2017-10-24 |
41 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $20,000,000, median $1,000,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
49 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 101079710 | 2026-05-20 | General construction | 2722 S DR MARTIN L KING JR DR | 2019 SELF-CERT CBC: FULL BUILDING PERMIT FOR A NEW 1-STORY FOUR (4) BAY ACCESSORY VEHICLE PARKING GARAGE AS PER PLANS. (OCCUPANCY GROUP U; TYPE IIB CONSTRUCTION) (STRUCTURAL PEER R | $1,300,000 |
| 100936955 | 2022-04-26 | General construction | 12260 S CARONDOLET AVE | SPR 2019 CBC: NEW CONSTRUCTION OF A 1-STORY MODULAR PREMANUFACTURED EMPLOYEE BREAK ROOM AND LOCKER ROOM BUILDING ON SHALLOW SPREAD FOOTINGS. PROPOSED USE: A2 CONSTRUCTION TYPE II-B | $963,900 |
| 100874420 | 2022-01-13 | General construction | 1928 S JOURDAN CT | ERECT 4 STORY, TYPE IA CONSTR., OCCUPANCY CLASS J, OFF-SITE PARKING GARAGE FACILITY WITH NO BSMT, 2 DRIVEWAYS WITH NO ALLEY ACCESS, FOR A TOTAL OF 189 REQUIRED ACCESSORY PARKING SP | $1,200,000 |
| 100909457 | 2021-06-29 | General construction | 924 S MORGAN ST | (SPR / 2019 CBRC) BUILDING ADDITION TO AN EXISTING TWO (2) STORY BUILDING TO INCLUDE NEW EXTERIOR ELEVATOR (SERVES BASEMENT, 1ST & 2ND FLOORS), 1-STORY VESTIBULE, CANOPY AND ASSOCI | $760,000 |
| 100897640 | 2021-02-10 | General construction | 839 W 79TH ST | DIRECT DEVELOPER SERVICES - 2019 CBRC, INTERIOR & EXTERIOR RENOVATIONS (SHELL & CORE ONLY) TO EXISTING 4-STORY BUILDING (PUBLIC FUNDING) TO INCLUDE NEW 1-STORY PENTHOUSE ADDITION A | $6,100,000 |
| 100836068 | 2019-08-16 | General construction | 840 E 59TH ST | ARCHITECTURAL ENVELOPE FOR ONE STORY COURTYARD IN-FILL ADDITION, RENO. SCOPE INCLUDES STAIR, CORRIDORS, AND FIRE SEPARATION REQUIREMENTS, AS WELL AS MEP/FP SYSTEMS IN PREPARATION F | $11,500,000 |
| 100826999 | 2019-06-25 | General construction | 840 E 59TH ST | FOUNDATION AND ERECT STRUCTURAL STEEL FOR RENOVATION (15,000 +/-) AND ADDITION (6,000 +/-) OF AN EXISTING MEDICAL OFFICE BUILDING AND ASSOCIATED SITE WORK AS PER PLANS. **NO VENTIL | $3,500,000 |
| 100799455 | 2019-04-26 | General construction | 201 E 111TH ST | EXISTING ASSEMBLY USE STRUCTURE, NO CHANGE IN USE/OCCUPANCY CLASSIFICATION. PROJECT IS FOR ACCESSIBILITY UPGRADES TO THE BUILDING INCLUDING LOCKER ROOMS, RESTROOMS, AND GENERAL BUI | $785,000 |
| 100791421 | 2018-11-02 | General construction | 3546 W ADDISON ST | MASONARY WORK,TUCKPOINTING (300 SQ FT),BRICK REPLACEMENT WHERE NEEDED. | $10,000 |
| 100743219 | 2018-04-25 | General construction | 7740 S WESTERN AVE | PD-6 CONSTRUCT A ONE STORY LOCKER ROOM AND CONCESSION STAND BUILDING PER PLANS. | $100,000 |
| 100739429 | 2018-04-24 | General construction | 1 N STATE ST | INTERIOR RENOVATION OF EXISTING 11TH FLOOR SPACE AND EXISTING MEZZANINE & INCLUDES PLUMBING WORK ABOVE THE 10 TH FLR. SUSPENDED CEILING AS PER PLANS. STRUCTURAL PEER REVIEW **CERTI | $3,300,000 |
| 100747938 | 2018-04-20 | General construction | 3434 S MICHIGAN AVE | REPLACEMENT OF GRASS ATHLETIC FIELDS WITH SYNTHETIC TURF FIELDS; TO INCLUDE CONSTRUCTION OF NEW BASEBALL DUGOUTS, STORAGE BUILDING AND ENTRY GATEWAY AS PER PLANS. | $2,500,000 |
| 100732103 | 2017-12-29 | General construction | 135 N KEDZIE AVE | RENOVATIONS / ADDITION OF EXISTING BUILDING FOR CHANGE OF USE TO A COMMERCIAL KITCHEN AND EVENT SPACE AND ASSOCIATED SITE WORK AS PER PLANS. (STRUCTURAL PEER REVIEW) | $1 |
| 100680356 | 2017-11-06 | General construction | 939 W FULTON MARKET | INTERIOR/EXTERIOR ALTERATIONS TO AN EXISTING 3-STORY HEAVY TIMBER BUILDING WITH RETAIL ON 1ST FLOOR AND OFFICES ON 2ND AND 3RD FLOORS; NEW ROOF TOP DECK; GREEN ROOF INSTALLATION (4 | $7,000,000 |
| 100723908 | 2017-10-24 | General construction | 10441 S SEELEY AVE | CURRENT & PROPOSED USE/OCCUPANCY EXISTING 3-STORY SFR WITH BASEMENT, CONSTRUCT A REAR OPEN DECK, REAR 1-STORY ADDITION(SCREEN PORCH), AND FIREPLACE AT THE REAR OF THE PROPERTY PER | $5,000 |
| 100697473 | 2017-07-25 | General construction | 936 W FULTON MARKET | 1ST AND 2ND FLOOR RETAIL WITH INACTIVE BASEMENT STORAGE:REVISIONS TO THE ORIGINAL SCOPE (#100671573) INCLUDE STRUCTURAL AND ARCHITECTURAL CHANGES ASSOCIATED WITH ADDING DEMISING WA | $4,000,000 |
| 100696295 | 2017-07-20 | General construction | 4737 S CALIFORNIA AVE | NEW CONSTRUCTION OF A ONE (1) STORY DIALYSIS CENTER AND ASSOCIATED SITE WORK AS PER PLANS.. CORE AND SHELL WITH UTILITIES ONLY. **CERTIFIED PLAN CORRECTIONS PROJECT - CONDITIONAL | $1,025,000 |
| 100685725 | 2017-04-12 | General construction | 2722 S DR MARTIN L KING JR DR | INTERIOR & EXTERIOR RENOVATIONS TO AN EXISTING THREE (3) STORY SCHOOL TO CONVERT TO A UNION HALL, TO INCLUDE A ONE (1) STORY ADDITION AND ASSOCIATED SITE WORK AS PER PLANS (STRUCTU | $16,114,331 |
| 100685975 | 2017-03-13 | General construction | 2100 E 87TH ST | CPS SCHOOL: REVISIONS TO PERMIT #100616134 TO REVISE POSITION OF NORTH BARRIER WALLS, EGRESS DOORS, REVISE MATERIAL OF SOUTH EAST BARRIER WALL, ADD SHEET A9.1 TO REPLACE A RATED D | $433,100 |
| 100683703 | 2017-02-28 | General construction | 1000 W RANDOLPH ST | SELF-CERT NEW TENANT BUILD-OUT IN EXISTING F-MERCANTILE BUILDING FOR ESTABLISHMENT OF A COFFEE SHOP. | $250,000 |
| 100671573 | 2016-12-21 | General construction | 936 W FULTON MARKET | EXISTING 2 STORY MEAT PACKING BUILDING WITH BASEMENT STEEL & MASONRY STRUCTURE. DEMOLISH ALL INTERIORS FOR NEW RETAIL, ALTERATIONS TO INTERIOR/EXTERIOR INCLUDING STRUCTURAL & M.E.P | $4,000,000 |
| 100665352 | 2016-10-20 | General construction | 1554 W NORTH AVE | SELF-CERT PROJECT - INTERIOR ALTERATIONS IN EXISTING OFFICE BUILDING TO THE EXISTING FIRST FLOOR BANKING FACILITY AS PER PLANS. | $280,000 |
| 100669818 | 2016-09-23 | General construction | 2 S LA SALLE ST | SELF-CERT PROJECT - INTERIOR ALTERATIONS IN EXISTING OFFICE BUILDING TO THE EXISTING BANKING FACILITY AT THE 1ST FLOOR AS PER PLANS. | $650,000 |
| 100600129 | 2016-07-11 | General construction | 30 E LAKE ST | INTERIOR RENOVATION OF EXISTING CITY COLLEGE ON FLOOR 1. RENOVATION INCLUDES DEMOLITION OF EXISTING INTERIOR AND EXTERIOR WALLS, DOORS, WINDOWS, CEILINGS, LIGHTING AND FINISHES AS | $290,000 |
| 100644219 | 2016-06-07 | General construction | 312 N CARPENTER ST | REVISION TO PERMIT #100617775 TO REVISE STRUCTURAL FRAMING, STAIR CONFIGUARTION, ADD INTERIOR CONVENIENCE STAIR, ELEVATOR VESTIBULE AT ROOF AND SKYLIGHT IN EXISTING 3 STORY OFFICE | $125,000 |
| 100651199 | 2016-05-26 | General construction | 939 W FULTON MARKET | DEMOLITION OF INTERIOR NON-LOAD BEARING WALLS FOR AN EXISTING 2 STORY WAREHOUSE BUILDING WITH BASEMENT AS PER PLANS | $149,950 |
| 100651194 | 2016-05-26 | General construction | 936 W FULTON MARKET | DEMOLITION OF INTERIOR NON-LOAD BEARING WALLS FOR AN EXISTING 2 STORY WAREHOUSE BUILDING WITH BASEMENT AS PER PLANS | $140,000 |
| 100646635 | 2016-05-24 | General construction | 328 N CARPENTER ST | SELECTIVE DEMOLITION OF EXISTING GARAGE AREA AT REAR OF 328 N CARPENTER 1-STORY COMMERCIAL BUILDING (NOW VACANT) TO PERMIT ACCESS FOR CONSTRUCTION AT 312 N CARPENTER 3-STORY COMMER | $8,000 |
| 100630210 | 2016-02-29 | General construction | 555 E 51ST ST | SELF-CERT PROJECT LEVEL 2 ALTERATION. OCCUPANCY CLASS (NO CHANGE) C3, TYPE IB SCHOOL CONSISTING OF EXISTING RECREATION BUILDING AND ACADEMIC BUILDING. RENOVATION INCLUDES ACCESSI | $9,000,000 |
| 100617775 | 2016-02-26 | General construction | 312 N CARPENTER ST | RENOVATIONS AND ADDITION TO EXISTING 3 STORY OFFICE AND MERCANTILE BUILDING. CONVERT 1ST FLOOR RETAIL, 2ND AND THIRD FLOOR INTO OFFICE SPACE. 3 STORY ADDITION, ROOFTOP AMENITY DEC | $1,500,000 |
| 100588834 | 2015-08-05 | General construction | 4034 W 56TH ST | REPLACEMENT OF THE EXISTING FLOOR SLAB FOR ACCESSIBILITY, ALL NEW SEATING, CONCRETE SLAB WORK, DECORATIVE IMPROVEMENTS, MISC./SUPPORTIVE ELECTRICAL, MECHANICAL, PLUMBING OR FIRE PR | $600,000 |
| 100588851 | 2015-08-03 | General construction | 4034 W 56TH ST | EXISTING 4 STORY CHICAGO PUBLIC SCHOOL WITH ATTACHED 4 STORY ABANDONED CATHOLIC CONVENT. THE CONVENT IS CURRENTLY OCCUPIED BY CPS ON LEVELS 1 AND PARTIALLY ON LOWER LEVEL. THE CONV | $8,117,132 |
| 100560039 | 2015-02-23 | General construction | 12101 S DOTY AVE E | NEW CONSTRUCTION OF A STORAGE DOME ON GEOPIER FOUNDATION AND EQUIPMENT ROOM AT EXISTING CEMENT PROCESSING PLANT AS PER PLANS. | $1,000,000 |
| 100554631 | 2014-10-27 | General construction | 77 W WASHINGTON ST | INTERIOR ALTERATIONS IN EXISTING MIXED USE 30-STORY BUILDING FOR COMMON AREA AND BUILDING SYSTEMS IMPROVEMENTS, AND LIFE SAFETY UPGRADES BASED ON A CITY-ACCEPTED LIFE SAFETY CERTIF | $20,000,000 |
| 100479354 | 2013-08-07 | General construction | 3401 W FOSTER AVE | SINGLE STORY 16,500SF MASONRY LIBRARY BUILDING FOR CHICAGO PUBLIC LIBRARY.LIGHT GAGE METAL CANOPY AND EAVE EXTENSIONS ARE NOT PART OF THIS PERMIT. LEED GOLD. CERTIFIED CORRECTIONS. | $6,900,000 |
| 100461953 | 2013-05-08 | General construction | 3730 N OAKLEY AVE | 2-STORY BUILDING ADDITION AND SITE IMPROVEMENTS TO EXISTING ELEMENTARY SCHOOL. GREEN PERMIT PROGRAM - LEED SILVER | $7,000,000 |
| 100482572 | 2013-03-22 | General construction | 5025 S ST LOUIS AVE | FULL BUILDING PHASE- CORE MEP SYSTEMS INSTALLATION AND INTERIOR BUILD-OUT FOR NEW 3 STORY HIGH SCHOOL, TYPE IB CONSTRUCTION NO BASEMENT. | $10,800,000 |
| 100433790 | 2012-04-02 | General construction | 6631 N BOSWORTH AVE | SULLIVAN HIGH SCHOOL:RENOVATIONS TO TWO(2) EXISTING CLASSSROOMS TO CONVERT TO COMPUTER TRAINING ROOMS. | $187,500 |
| 100433765 | 2012-04-02 | General construction | 6130 S WOLCOTT AVE | LINDBLOM HIGH SCHOOL: HIGH SCHOOL MODIFICATIONS TO ELECTRICAL, FURNISHINGS AND EQUIPMENT OF TWO CLASSROOMS ADJUSTING ACCESSIBLE WATER COOLERS AT THREE LOCATIONS, PAINTING OF WALLS | $221,738 |
| 100339189 | 2010-09-22 | General construction | 1200 W CERMAK RD | PREPARE TENANT SPACES FOR BUILD-OUT (CORE & SHELL) IN EXISTING WAREHOUSE STORAGE FACILITY. NEW 2000A ELEC SERVICE, DEMO EXISTING INTERIOR PARTITIONS, REPAIR FLOOR SLAB, INCLUDE ALL | $1,500,000 |
| 100355351 | 2010-07-23 | General construction | 54 N HERMITAGE AVE | FULL ROOF REPLACEMENT; 11,500 SQ. FT. GREEN ROOF; MINOR REPAIRS OF INTERIOR FINISHED (DUE TO ROOF LEAKS); LIMITED MASONRY REPAIRS. | $770,949 |
| 100354934 | 2010-07-21 | General construction | 2908 W WASHINGTON BLVD | RENOVATION OF EXISTING CLASSROOMS INTO SCIENCE CLASSROOMS; RENOVATION OF A WASHROOM INTO A CHANGING ROOM; ADA UPGRADES INCLUDING A STAGE LIFT AND ACCESSIBLE HEIGHT DRINKING FOUNTAI | $951,094 |
| 100354406 | 2010-07-19 | General construction | 1900 W 23RD ST | INTERIOR RENOVATIONS TO SCIENCE ROOM, COMPUTER ROOM, AND KITCHEN. | $1,256,816 |
| 100291862 | 2009-11-09 | General construction | 6735 W ARCHER AVE | THE EXISTING BUILDING WILL BE CONVERTED FROM AN OFFICE SPACE TO A WALK-IN RETAIL BANK. THE EXISTING INTERIOR WALLS WILL BE DEMO'D AND NEW WALLS CONSTRUCTED WITHIN THE EXISTING STR | $500,000 |
| 100289373 | 2009-06-25 | General construction | 7212 N CLARK ST | RENOVATION AND REPAIRS TO EXISTING SHELL BUILDING TO CONVERT TO NEW SCHOOL USE. NEW ROOF STRUCTURE ON SOUTH END OF BUILDING. NEW HVAC UNITS, ELECTRICAL, FIRE SPRINKLERS, PLUMBING | $2,500,000 |
| 100275665 | 2009-04-10 | General construction | 7212 N CLARK ST | INTERIOR AND EXTERIOR DEMOLITION OF PORTION OF EXISTING BUILDING; SELECTIVE INTERIOR DEMOLITION IN REMAINING BLDG; AND NEW EXTERIOR MASONRY OPENINGS TO EXISTING BUILDING AS PER PLA | $2,500,000 |
| 100214046 | 2008-03-11 | General construction | 2515 N CLARK ST | PROVIDING AN EMERGENCY GENERATOR. WORK TO INCLUDE MECH, ELEC AND MASONRY. CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS. | $380,000 |
| 100181613 | 2007-06-01 | General construction | 1000 W LOYOLA AVE | INTERIOR AND EXTERIOR ALTERATION/RENOVATION TO MULTIPLE FLOORS IN EXISTING 9 STORY STUDENT RESIDENCE HALL- DECONVERT FROM 73 DU TO 48 DU- LOYOLA UNIVERSITY | $6,000,000 |
| 100120728 | 2006-08-08 | General construction | 6316 S WESTERN AVE | EXTERIOR ALTERATIONS AND FACADE REMODELING AS PER PLANS. | $500,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Chicago permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
