Zorko Electric Inc — permit history in Seattle, WA

Zorko Electric Inc appears on 195 Seattle permit records from 2015 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical195100%

Activity by year

YearPermits issued
201533
201624
201718
201815
201920
202013
202110
202212
20236
202413
202518
202613

Busiest year on record: 2015, with 33 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
4601 6TH AVE S2026-08-26
2300 26TH AVE S2026-08-14
5979 4TH AVE S2026-08-06
822 W FULTON ST2026-07-24
2632 NOB HILL AVE N2026-07-06
612 2ND AVE2026-06-09
180 NICKERSON ST2026-06-04
5600 KIRKWOOD PL N2026-05-20
2619 4TH AVE N2026-05-13
5900 AIRPORT WAY S2026-04-09
9725 3RD AVE NE2026-03-05
121 S KENYON ST2026-02-06
1719 22ND AVE2025-09-30
710 N 34TH ST2025-08-08

124 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $250 to $250,000, median $11,783. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

195 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7159877-EL2026-08-26Electrical4601 6TH AVE SInstall energy monitoring system on main electrical service for the building.
7158256-EL2026-08-14Electrical2300 26TH AVE SWe are redirecting existing circuitry to accommodate wall removal in a warehouse and adding high bay lights
7156992-EL2026-08-06Electrical5979 4TH AVE SProvide additional warehouse 120v receptacles and connect new tenant equipment
7154844-EL2026-07-24Electrical822 W FULTON ST200 amp panel swap for failing main breaker,  old panel
7151502-EL2026-07-06Electrical2632 NOB HILL AVE NTenant improvement. Add receptacle, switch and two light fixtures.
7147091-EL2026-06-09Electrical612 2ND AVERedirecting a total of five circuits that serve the walk in cooler in the kitchen to the existing optional standby system.
7146436-EL2026-06-04Electrical180 NICKERSON STAdding eight new LED 2x4 troffers to existing lighting circuit and relocating lights as necessary. Adding four dedicated circuits for four receptacles. Adding four general use re
7141774-EL2026-05-20Electrical5600 KIRKWOOD PL NWe are installing a new 208V 40A car charger in the parking garage for the owner of unit 101. We will install an energy management system to ensure the load on the service does no$10,000
7142350-EL2026-05-13Electrical2619 4TH AVE NInterior tenant improvement. Modifying 2 offices into 3. Relocating three receptacles. Relocating two occupancy sensor switches. Relocate one light fixture. Add two LED downli$4,900
7138402-EL2026-04-15Electrical612 2ND AVEAdding one duplex receptacle near the roof on one new 20A 120V circuit.
7137529-EL2026-04-09Electrical5900 AIRPORT WAY SExtend new 100a feeder to new loadcenter located in tenant space. Consolidate existing circuits from neighboring tenant panels to new panels for Steris tenant. add circuits to exis
7132093-EL2026-03-05Electrical9725 3RD AVE NEAdding power for server room heat pump. Relocating receptacles for break room. Adding receptacle for sign. Connecting furniture to existing circuits. Adding receptacles for mee
7128275-EL2026-02-06Electrical121 S KENYON STI am demoing a small warehouse/space. We will modify the branch circuitry and complete a market ready for the landlord to try to lease. There will be new LED lighting and small b
7110903-EL2025-10-09Electrical2300 26TH AVE SExterior Lighting Retrofit.$60,000
7109506-EL2025-09-30Electrical1719 22ND AVEElectrical Connection to commercial hood and lights.$2,000
7106147-EL2025-09-10Electrical2300 26TH AVE SMarket Ready in South Warehouse. New 45 KVA 208V transformer, new 208V panel, new circuits. New lighting throughout 1st floor.$60,000
7102330-EL2025-08-19Electrical2300 26TH AVE SNew receptacles and circuits in concession area.$7,000
7100772-EL2025-08-08Electrical710 N 34TH STInstalling a 100A sub panel to accommodate 4 new 120v circuits for new treadmills$5,000
7093008-EL2025-07-01Electrical1301 E YESLER WAYMinor tenant improvement for restroom and OT/PT room.$7,500
7091476-EL2025-06-16Electrical818 S DAKOTA STInstalling outlet for welder. Installing (7) LED strip lights over work areas. Installing (2) outlets on drop cords for work areas.$9,877
7091017-EL2025-06-12Electrical2300 26TH AVE SLighting replacements on 2nd floor.$28,000
7086417-EL2025-05-22Electrical2619 4TH AVE NInterior tenant improvement. Replace fluorescent & incandescent lighting with LED. Upgrade controls to WSEC. Replace baseboard/force air heaters with heat pumps. Relocate & add $79,488
7087340-EL2025-05-22Electrical2300 26TH AVE SRefeeding two 200A 480V panels from existing panelboard. Refeeding two dozen circuits in office spaces.; 8/7/25 RN Actual work performed is 1one 50A circuit to feed existing panel $28,000
7081499-EL2025-04-18Electrical2619 4TH AVE NRELOCATING EXISTING EXTERIOR CONDUITS, CONDUCTORS, FIXTURES AND CONTROLS FOR INSTALLATION OF NEW SIDING PANELS. NO NEW ELECTRICAL LOAD.$20,000
7080093-EL2025-04-10Electrical651 NW 81ST STReplacing 4 electrical panels (panel location and amperage to stay the same). Running new circuits for theatrical lighting and AV equipment by Morgan Sound. Replacing overhead ligh$62,000
7076683-EL2025-03-31Electrical100 W MERCER STRemove existing EV inverters and dispensers. Reconfigure three-400a underground feeders to two 600a feeders. Provide all associated wiring and terminations. [3/31/25 KEF - Plan set$34,673
7072438-EL2025-02-26Electrical55 S DAWSON STReplacement of existing owner-owned power pole with overhead strike and 100a 120/240v service meter and panel. Reconnection of existing yard storm water pump and installation of t$10,000
7071959-EL2025-02-24Electrical5979 4TH AVE SInstall energy monitoring cabinet for new main service.$8,000
7071924-EL2025-02-24Electrical2300 26TH AVE SLighting relocation and additional fixtures on 1st floor of office warehouse. New tenant circuits.$40,237
7067606-EL2025-02-04Electrical5615 24TH AVE NWPreviously permit #7063040-EL. Install one 200a 120/208v panel fed from existing series-rated metering switchboard. Provide a total of 14 - 120v/20a level one EV charging outlets. $28,500
7066752-EL2025-01-23Electrical2300 26TH AVE SPickleball Office TI$54,629
7063040-EL2024-12-31Electrical5615 24TH AVE NWInstallation of new 200a 120/208v/3 panel fed from existing 200a meter base. Installation of 13 - LEVEL 1 EV outlets with digital metering. [C.Kenefick 1/23/25 - plan review requir$25,000
7061691-EL2024-12-18Electrical907 NW BALLARD WAYAdding lighting under storefront awnings for additional security.$4,606
7055480-EL2024-11-08Electrical2300 26TH AVE SProvide electrical demising in Seattle 15 Building to accommodate tenant demising wall. Relocate one panel to SE tenant space. Refeed existing panel in NW tenant space due to demis$25,000
7054365-EL2024-11-01Electrical8829 ROOSEVELT WAY NEInstall two 200A 3PH panelboards in 8839 & 8833. Extend new feeders from existing meter bank in parking garage to retail suites. [12/19/2024 PGF This permit does not require plan r$7,841
7049758-EL2024-10-07Electrical150 S HORTON STInstall energy monitoring equipment.$14,195
7038797-EL2024-08-01Electrical5303 SHILSHOLE AVE NWDisconnect of existing HVAC unit. Connection of new HVAC unit on existing circuit. No changes to circuit ampacity, lower OCP than existing.$2,954
7034750-EL2024-07-15Electrical5979 4TH AVE SEliminate two existing service meters. Provide new 600a 480v single-metered service to building. Provide three new 200a interior panels fed from new 225kva transformer. Terminate e$91,534
7033228-EL2024-06-28Electrical2040 43RD AVE ENew 40A 240V 1PH circuit and branch wiring from panel to car stall. New hard wired car charger.$4,012
7024217-EL2024-05-24Electrical3200 OCCIDENTAL AVE SRemove existing 400a 120/240v/3ph electrical service and install new 277/480v/3ph service. Building is vacant, so no new electrical loads are to be added at this time.$41,269
7017607-EL2024-04-01Electrical2250 OCCIDENTAL AVE SNew branch circuit for new HVAC unit being placed by PSR mechanical.$4,797
7010128-EL2024-02-28Electrical2040 43RD AVE EInstallation of 60kw standby natural gas generator and automatic transfer switch. Installation of 200a Standby panel to accommodate panels X/PH/BR in the event of a power outage. W$92,525
7009166-EL2024-02-12Electrical5979 4TH AVE SAdditional exit / egress fixtures per building inspector request.$1,800
7004033-EL2024-01-10Electrical5626 AIRPORT WAY SInstall one 100a 120/208v/3ph tenant panel and two equipment outlets$7,669
6995150-EL2023-11-07Electrical5979 4TH AVE SCommercial Market Ready. New 120/208V circuits throughout warehouse. Minor lighting alterations in bathrooms only.$20,000
6957025-EL2023-04-04Electrical1401 NW 46TH STRemodel of elevator lobby and reception on 4th floor. Existing lighting to be reused and relocated as directed.$11,783
6954327-EL2023-03-21Electrical418 MAYNARD AVE SInstall one 100a 120/208v/3ph meterbase per SCL and extend feeder to new panel in existing restaurant.$11,046
6952116-EL2023-03-08Electrical2151 N NORTHLAKE WAYProvide and install exterior floodlight on existing circuit and controls.$1,800
6949058-EL2023-02-20Electrical51 UNIVERSITY STCommercial tenant improvement. Relocating receptacles and lighting controls. Adding receptacles and lighting controls as required for improvements. Provide and install voice/dat$21,114
6940782-EL2023-01-03Electrical7601 AURORA AVE NCommercial tenant improvement. Replace lighting with LED and install new controls. Power for new HVAC. Relocate receptacles. Renewal 01/03/2024 cb$45,712

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →