Unity Electric appears on 370 Seattle permit records from 2018 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical370100%

Activity by year

YearPermits issued
201849
201979
202054
202169
202244
202310
202421
202524
202620

Busiest year on record: 2019, with 79 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
6525 SUNNYSIDE AVE N2026-08-26
5101 25TH AVE NE2026-08-13
1900 1ST AVE2026-07-06
5000 25TH AVE NE2026-06-25
1761 NW 57TH ST2026-06-22
521 STADIUM PL S2026-06-09
215 10TH AVE E2026-06-03
1740 NW MARKET ST2026-06-01
1765 22ND AVE S2026-05-08
5300 24TH AVE NE2026-05-07
1750 22ND AVE S2026-04-15
520 OCCIDENTAL AVE S2026-04-01
2002 NW 56TH ST2026-03-13
12728 28TH AVE NE2025-12-30

165 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $4,146,510, median $1,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

370 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7159883-EL2026-08-26Electrical6525 SUNNYSIDE AVE NADD EV CAR CHARGER, ADD POWER FOR HOT TUB
7157191-EL2026-08-13Electrical5101 25TH AVE NEThis application follows on SDCI Record Number 7129859-EL which sew the removal of general area pull stations to reduce nuisance alarms. It was not recognized that the west tower o$5,000
7151456-EL2026-07-06Electrical1900 1ST AVEADD POWER FOR (2) AMAZON LOCKERS
7150079-EL2026-06-25Electrical5000 25TH AVE NEADDING AN ADDITIONAL LIGHT POLE ON PROPERTY.
7149341-EL2026-06-22Electrical1761 NW 57TH STWe are the EC onsite, this is a new Multifamily building and we're adding (1) 6 panel system to meet minimum code requirements per our stamped plans. Under Permit# 7067450-EL ..
7147109-EL2026-06-09Electrical521 STADIUM PL SADD (3) NEW DEDICATED CIRCUITS FOR WORK OUT ROOMS ON 5TH FLOOR
7146094-EL2026-06-03Electrical215 10TH AVE ERUN NEW 12/2 UF FROM JBOX TO NEW FIRE PIT
7145751-EL2026-06-01Electrical1740 NW MARKET STInstallation of a 240 kW (300 kVA) generator for the operation of a tower crane with a minimum required nominal generator power of 186 kW.
7135663-EL2026-05-11Electrical1740 NW MARKET STComplete electrical installation including line and low voltage work for a new 8 story 239 unit mixed use apartment building. Get started permit requested. [5/11/26 KEF - Plan set $4,146,510
7142277-EL2026-05-08Electrical1765 22ND AVE SADDITION OF 200A PANELS WITH FEEDERS IN RETAIL SPACE LOCATED ON COMMERCIAL SPACE #2
7141977-EL2026-05-07Electrical6525 SUNNYSIDE AVE NADD EV CHARGER
7141966-EL2026-05-07Electrical5300 24TH AVE NEINSTALL A FLOOR RECEPTACLE NEAR CONCIERGE DESK
7135809-EL2026-04-15Electrical1750 22ND AVE SRepositioning & addition of retail/commercial panels for (4) retail spaces. extension of low voltage tele/data infrastructure for (4) retail spaces. Addition of lighting in new sha$62,113
7136172-EL2026-04-01Electrical520 OCCIDENTAL AVE SINSTALL (3) WR RECEPTACLES WITH BUBBLE COVERS FOR CHRISTMAS TREE LIGHTING
7134963-EL2026-03-30Electrical1740 NW MARKET ST800A temporary power for the 1740 NW Market St. Ballard Blossom Apartments project [3/30/25 KEF - Plan set approved.] [4/1/26 Plan sheet TP-02 revised. Insert revision into stamp$75,000
7086435-EL2026-03-30Electrical1761 NW 57TH STFire Alarm system for new 7 story 76 unit mixed use apartment building [2-25-26 D Rankin - Get Started permit added to project]$69,000
7135228-EL2026-03-25Electrical5101 25TH AVE NEADD DOOR OPENER AT ENTRANCE
7086430-EL2026-03-13Electrical2002 NW 56TH STFire Alarm system for new 7 story 47 unit mixed use apartment building [2-25-26 D Rankin - Get Started permit added to project]$48,000
7129859-EL2026-03-04Electrical5101 25TH AVE NEThis project consists of a fire alarm system modification to remove existing manual pull stations throughout the building. The purpose of this work is to reduce recurring nuisance $12,664
7112574-EL2026-02-03Electrical1765 22ND AVE ST.I. FIRE ALARM - INTERCEPT AN EXISTING NOTIFICATION CIRCUIT AND ADD NOTIFICATION DEVICES PER PLAN; ALONG WITH THE ADDITION OF (1) SIGNAL CIRCUIT EXPANDER (MIRCOM INX-10A) FOR A TE$21,430
7123018-EL2025-12-30Electrical12728 28TH AVE NECONVERT EXISTING OUTLET TO A 30A RECEPTACLE. RUN FLEX FROM HOUSE PANEL TO P1$500
7117044-EL2025-11-17Electrical1938 FAIRVIEW AVE ERELOCATE EXISTING CAR CHARGER ON L1 TO P1 SPACE 9$500
7114522-EL2025-10-30Electrical430 8TH AVE NREPLACE LIKE FOR LIKE ELEVATOR CONTROL SWITCH$1,500
7112202-EL2025-10-28Electrical3215 NE 143RD STReplacement of main switchboard. Original switchboard damaged by vehicular collision. Replacement switchboard needs to conform with original having no main due to physical constrai$405,684
7112163-EL2025-10-20Electrical3215 NE 143RD ST[10-20-25 D Rankin - issued permit for temporary condition 90 days] This application is for the temporary emergency switchboard repairs made at 3215 NE 143rd St. Promenade Apartme$16,776
7110528-EL2025-10-07Electrical1938 FAIRVIEW AVE ERELOCATING EXISTING CIRCUITS INTO A NEW WALL$500
7110288-EL2025-10-06Electrical2200 1ST AVEREPLACE LIKE FOR LIKE PANEL, UPGRADE WITH ALL NEW BREAKERS.$500
7109785-EL2025-10-02Electrical3215 NE 143RD ST100KW GENERATOR, 4/0 CAM LOCK CORDS LUG'D ONTO THE HOUSE PANEL FEEDERS- TEMP POWER$20,000
7106066-EL2025-09-10Electrical620 TERRY AVEINSTALL NEW 208V SINGLE PHASE 30A 2P FOR OVEN$1,000
7100121-EL2025-08-05Electrical2418 NW 56TH STINSTALL POWER FROM PANEL TO WELLNESS CENTER FOR COFFEE MACHINE, AND 2ND LOCATION TO MEETING ROOM$1,000
7087670-EL2025-06-25Electrical1938 FAIRVIEW AVE EFire alarm panel replacement along with the replacement of control & monitor modules as well as all smoke detector. (3 story office building with 1 level of below grade parkin$25,000
7081329-EL2025-05-29Electrical701 S SOUTHERN STNew 400A service with 400A main panel and 100A subpanel. New LED lighting.$48,066
7084643-EL2025-05-07Electrical1761 NW 57TH ST45KW 480V Generator to power Tower Crane until permanent power is completed.$5,000
7083434-EL2025-05-01Electrical101 TAYLOR AVE NREROUTE POWER CIRCUIT, NO CHANGES OTHERWISE$500
7081234-EL2025-04-23Electrical7324 M L KING JR WAY SRooftop Photovoltaic System - 33.11kWDC, 39.74 kWAC, associated with electrical permit number 7006900-EL. [4/23/25 BGO - Approved PV Plan Set]$98,000
7081088-EL2025-04-16Electrical2840 EASTLAKE AVE ERELOCATE CIRCUIT (2P, 30A BREAKER)$300
7067450-EL2025-03-26Electrical1761 NW 57TH STComplete electrical installation including line and low voltage work for a new 7 story 76 unit mixed use apartment building. Get started permit requested. [3/17/26 BGO - Permit Ext$1,625,200
7077055-EL2025-03-24Electrical11546 15TH AVE NEADD (1) 40A/240V OUTLET$200
7075404-EL2025-03-19Electrical1761 NW 57TH ST57TH BALLARD APARTMENTS TEMP POWER 1761 NW 57TH ST. Temp Power Temporary Power for a seven story mixed use apartment building. [03/19/25 BGO - Approved Temp Service Plan Set wit$40,000
7075398-EL2025-03-19Electrical2002 NW 56TH ST2002 NW 56th St. Temp Power Temporary Power for a seven story mixed use apartment building. [03/19/25 BGO - Approved Temp Service Plan Set with Comments] [3/17/26 BGO - Permit E$40,000
7067353-EL2025-03-10Electrical2002 NW 56TH STComplete electrical installation including line and low voltage work for a new 7 story 47 unit mixed use apartment building. Get started permit requested. [3/10/25 KEF - Plan set a$1,165,350
7067443-EL2025-02-20Electrical5123 24TH AVE NELike for kind replacement , 400A 9 stack meter replacement, ph, 3w-120/240v.65kA, 400A 9-stack meter center like for kind replacement Feeder size 250mcm (Existing Panel Zinsco) $15,000
7069932-EL2025-02-11Electrical1938 FAIRVIEW AVE EUPGRADE EXISTING FA PANEL, SMOKE DETECTORS, RELAYS AND MODULES TO NEW ES50X FIRE PANEL. 2/12/2026 jnl renewal [C.Kenefick 3/13/2026 - Plan review permit exists as a duplicate, 7087$15,000
7066305-EL2025-01-21Electrical5123 24TH AVE NEREPLACE EXISTING METER CENTER WITH A NEW SQUARE D 1PH 3W-120/240V, 65kA, 400A 9-STACK METER CENTER. [C.Kenefick 1/28/2025 - Requires plan review. See also permit 7061693]$1,000
7061693-EL2024-12-18Electrical5123 24TH AVE NEREPLACE EXISTING METER CENTER WITH A NEW SQUARE D METER CENTER [C.Kenefick 1/28/2025 - Requires plan review. See also permit 7066305]$5,000
7056002-EL2024-11-12Electrical2309 S JACKSON STDROP NEW WIRE FOR NON OPERATIONAL LIGHT IN L1 PARKING APPROX 25 FT$500
7041390-EL2024-08-16Electrical805 4TH AVE NEXTENDING 2 EXISTING CIRCUITS TO COURTYARD PLANTERS FOR (2) RECEPTACLES TO POWER FOUNTAINS$1,000
7039842-EL2024-08-07Electrical2821 S WALDEN STINSTALL MAGLOCK IN LAUNDRY ROOM$200
7039797-EL2024-08-07Electrical337 NE 103RD STADD OUTLET IN LOBBY$200
7038324-EL2024-07-31Electrical1334 TERRY AVEINSTALL EMERGENCY OUTLET FOR A PYXIS MACHINE$200

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →