COMPANY RECORD · SEATTLE, WA
United States Electric Corp Wa — permit history in Seattle, WA
United States Electric Corp Wa appears on 223 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 223 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 7 |
| 2016 | 7 |
| 2017 | 25 |
| 2018 | 11 |
| 2019 | 16 |
| 2020 | 9 |
| 2021 | 13 |
| 2022 | 12 |
| 2023 | 36 |
| 2024 | 27 |
| 2025 | 32 |
| 2026 | 28 |
Busiest year on record: 2023, with 36 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Seattle permit, not only this company's
This page is a snapshot of United States Electric Corp Wa. The search behind it holds more than 400,977 Seattle permits naming a contractor, since 2015: 251,769 electrical permits, 143,940 mechanical (HVAC) permits, 5,268 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit United States Electric Corp Wa files, or any new electrical permit in Seattle. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Where they worked
| Address in source | Most recent permit |
|---|---|
| 800 OCCIDENTAL AVE S | 2026-10-26 |
| 2235 1ST AVE N | 2026-05-12 |
| 1101 RAINIER AVE S | 2025-09-03 |
| 2415 2ND AVE | 2025-06-02 |
| 6808 EAST GREEN LAKE WAY N | 2023-12-08 |
| 925 WESTLAKE AVE N | 2023-10-11 |
| 1250 1ST AVE S | 2023-04-21 |
| 890 OCCIDENTAL AVE S | 2021-07-06 |
| 915 NW 45TH ST | 2020-05-20 |
| 5425 SHILSHOLE AVE NW | 2020-04-29 |
| 5300 24TH AVE NW | 2020-04-29 |
| 800 OCCIDENTAL AVE S | 2019-12-24 |
| 10700 36TH AVE NE | 2019-06-18 |
| 309 S CLOVERDALE ST | 2018-04-03 |
23 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $250 to $1,500,000, median $5,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Prime Electric | 3 | 2015–2020 |
| 16D LLC | 2 | 2021–2025 |
| Valley Electric Co. Of Mount Vernon Inc | 2 | 2017–2026 |
| Guardian Security Systems Inc | 2 | 2015–2025 |
| Sea-Tac Electric | 2 | 2016–2023 |
| Kemly Electric, Inc. | 2 | 2015–2026 |
| Adt LLC | 2 | 2015–2024 |
| Entrance Controls Inc | 2 | 2015–2025 |
Companies that also appear in Seattle permit records at addresses where United States Electric Corp Wa filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
223 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7169199-EL | 2026-10-26 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for broadcast for Monday Night Football on 11/282026. | |
| 7169204-EL | 2026-10-26 | Electrical | 800 OCCIDENTAL AVE S | Temporary use transformers for portable power distribution for special event Boo! 2026 10/30 & 10/31. (2) 112kVA transformers. | |
| 7168294-EL | 2026-10-20 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator to support broadcast operations for the Seahawks Sunday Night Football game on October 25, 2026. | |
| 7165887-EL | 2026-10-05 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for broadcast for the Seahawks game on Sunday 10/11/2026. | |
| 7164613-EL | 2026-09-28 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for broadcast for the Seahawks game on Sunday 10/4/2026. | |
| 7161062-EL | 2026-09-02 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for NFL broadcast. | |
| 7161067-EL | 2026-09-02 | Electrical | 800 OCCIDENTAL AVE S | Temporary generators for the concert in the north parking lot for the NFL season Kickoff game. (3) 200kW and (1) 120kW generators. | |
| 7159667-EL | 2026-08-25 | Electrical | 800 OCCIDENTAL AVE S | Add (1) new 250a panel fed from A elec rm. Add (1) 100a P&S recep from new 250a panel Refeed (1) 50a panel from new 250a panel | |
| 7159025-EL | 2026-08-20 | Electrical | 800 OCCIDENTAL AVE S | Temporary generators for show power for the Karol G. concert on Wednesday 8/26/26. | |
| 7152881-EL | 2026-07-22 | Electrical | 800 OCCIDENTAL AVE S | Temporary Battery Energy Storage System (BESS) [7/22/2023 BGO - Approved Plan Set] Ed Sheeran Concert - Saturday, August 1, 2026 The temporary BESS to be utilized for this eve | $25,000 |
| 7153816-EL | 2026-07-20 | Electrical | 800 OCCIDENTAL AVE S | Reconfigure existing circuitry to accommodate (3) new hot plates, new POS layouts, and (2) new back to back coolers | |
| 7152677-EL | 2026-07-13 | Electrical | 800 OCCIDENTAL AVE S | Repurpose a 60a pin and sleeve for a new 60a 3r 18 space panel. Add (6) controlled 20a circuits to feed 66 heated seats | |
| 7152673-EL | 2026-07-13 | Electrical | 800 OCCIDENTAL AVE S | Adding (4) controlled 20a gfi circuits feeding (14) duplex receptacles (2 seats per recep) | |
| 7152681-EL | 2026-07-13 | Electrical | 800 OCCIDENTAL AVE S | Add (1) 60a feeder for new 60a 18 space 3r panel add (9) controlled 20a circuits to feed 94 heated seats | |
| 7142631-EL | 2026-05-12 | Electrical | 2235 1ST AVE N | Addition of (2) 20A 120V circuits for lighting & receptacles (1) 20A 240V circuit for deck heater Rough-in for (9) can lights, (2) LED linear lights, (1) step light & (2) speaker l | |
| 7137229-EL | 2026-05-04 | Electrical | 800 OCCIDENTAL AVE S | Temp cabling and power distribution for FIFA events [5/4/26 BGO - Approved Temp Power for FIFA with Comments] | $1,500,000 |
| 7138605-EL | 2026-04-16 | Electrical | 800 OCCIDENTAL AVE S | Adding (1) 208v - 300a - 3 phase panel in TVTB and moving 10 circuits from existing panel to new panel. | |
| 7137093-EL | 2026-04-07 | Electrical | 800 OCCIDENTAL AVE S | Replacing (2) 24v LED drivers with dimmable drivers for tape light Adding (2) new dimmable drivers powered by existing circuitry and relay panel to feed new signage. * Signs insta | |
| 7135195-EL | 2026-03-25 | Electrical | 800 OCCIDENTAL AVE S | installing 5 circuits to supply power to 2 seperate lighted displays that plug into 5 duplex receptacles, 1 display has 3 receps and 1 display has 2 receps. These circuits are cont | |
| 7133494-EL | 2026-03-16 | Electrical | 800 OCCIDENTAL AVE S | Add (1) new 100a 3 phase 208v panel, (2) convenience 120v circuits, (4) 2500w heaters | |
| 7131714-EL | 2026-03-03 | Electrical | 800 OCCIDENTAL AVE S | Install a temporary feed to Kitchen equipment VIA generator during a scheduled SCL outage. | |
| 7130653-EL | 2026-03-03 | Electrical | 800 OCCIDENTAL AVE S | Install a 600A breaker on feeder 1 side of MSB gear in quad B to re-feed panel MCB1 temporarily during FIFA events, Install a 800a breaker on feeder 2 side of MSB gear in quad B to | $25,000 |
| 7129865-EL | 2026-02-18 | Electrical | 800 OCCIDENTAL AVE S | Adding (1) 60a 208v panel at bottom of NW ramp (approx 175ft of gfi protected plugmold) | |
| 7128873-EL | 2026-02-11 | Electrical | 800 OCCIDENTAL AVE S | 2026 Locker Upgrades | |
| 7128304-EL | 2026-02-06 | Electrical | 800 OCCIDENTAL AVE S | Perimeter Security Upgrades in LN Parking Lot. | |
| 7126595-EL | 2026-01-27 | Electrical | 800 OCCIDENTAL AVE S | Temp Power for Irrigation / Drain (grass field) | |
| 7126064-EL | 2026-01-22 | Electrical | 800 OCCIDENTAL AVE S | ||
| 7124505-EL | 2026-01-12 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for Seahawks Football Saturday 1/17/25 | |
| 7120209-EL | 2025-12-08 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for Seahawks Football Sunday 12/14/2025 | $500 |
| 7120216-EL | 2025-12-08 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for Seahawks Thursday Night Football 12/18/2025 | $500 |
| 7116696-EL | 2025-11-14 | Electrical | 800 OCCIDENTAL AVE S | Install interactive directory using existing circuitry | $5,000 |
| 7113665-EL | 2025-10-27 | Electrical | 800 OCCIDENTAL AVE S | Temporary use transformers for portable power distribution for special event Boo! 10/31-11/1 (2) 75kVA & (1) 150kVA | $10,000 |
| 7111304-EL | 2025-10-13 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for Seahawk Monday Night Football 10/20/2025 | $500 |
| 7111025-EL | 2025-10-09 | Electrical | 800 OCCIDENTAL AVE S | Install new lighting, receptacles and pathways for Security to New ELSB building at Lumen Field. | $95,000 |
| 7109305-EL | 2025-09-30 | Electrical | 800 OCCIDENTAL AVE S | Game day generator for Seahawks Football Sunday 10/5/2025 | $700 |
| 7107862-EL | 2025-09-22 | Electrical | 800 OCCIDENTAL AVE S | Install 3 - 208v 20amp circuits and data cabling for a Video Display installed by others | $25,000 |
| 7107953-EL | 2025-09-22 | Electrical | 800 OCCIDENTAL AVE S | NE - repurpose a 60A pin and sleeve to feed a new 60A panel. Add (1) circuit for 120v receps and (1) 208v circuit for heat. SE - branch circuits from from L3 garage- add (1) circu | $10,000 |
| 7106747-EL | 2025-09-15 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for Seahawks Football game on Sunday 9/21/2025 | $500 |
| 7105827-EL | 2025-09-09 | Electrical | 800 OCCIDENTAL AVE S | Add (1) 120v circuit to each location for a new FA monitoring panel. (1) in Wamu (1) in North Field computer room Lumen [2.10.26 VR, See also permits 7105792-EL and 7098188-EL] | $9,000 |
| 7104733-EL | 2025-09-03 | Electrical | 1101 RAINIER AVE S | Installation of a small temporary distribution panel for dewatering pumps during site cleanup | $2,000 |
| 7104475-EL | 2025-09-02 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for Seahawks Sunday Football 9/7/2025 | $1,000 |
| 7103959-EL | 2025-08-27 | Electrical | 800 OCCIDENTAL AVE S | Demo power for existing column surround and repurpose power and data for TVs and POS stations Demo 2 illuminated sign and repurpose circuitry for New Era hat rack wall | $8,000 |
| 7099115-EL | 2025-07-30 | Electrical | 800 OCCIDENTAL AVE S | Provide controlled 20a 120v circuit within 6ft of (4) new tunnels signs. Final connection to be made by sign installers. Sign permit #7094874-SB | $6,000 |
| 7096550-EL | 2025-07-16 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for the Morgan Wallen concert on Friday 7/25 and Saturday 7/26. Generator will be located on the NE corner of the stadium. | $1,000 |
| 7095492-EL | 2025-07-10 | Electrical | 800 OCCIDENTAL AVE S | Install (2) 1PH 60A panels. Each having (5) 20a branch circuits | $40,000 |
| 7094241-EL | 2025-07-02 | Electrical | 800 OCCIDENTAL AVE S | Temporary generator for The Weeknd Concert on Saturday 7/12/2025. Generator will be located on the NE corner of the stadium. | $1,000 |
| 7090947-EL | 2025-06-12 | Electrical | 800 OCCIDENTAL AVE S | Install New light fixtures and Supply power to new roof fans | $30,000 |
| 7090952-EL | 2025-06-12 | Electrical | 800 OCCIDENTAL AVE S | Install (1) 100A 3ph panel and install branch circuits for (4) gallery carts | $150,000 |
| 7087743-EL | 2025-06-05 | Electrical | 800 OCCIDENTAL AVE S | Install a temp 500KW Gen and associated cabling [5/30/25 BGO - Approved Plan Set for Temporary Power and Broadcast Wiring - See Related Record 7083233-EL] | $70,000 |
| 7088787-EL | 2025-06-02 | Electrical | 2415 2ND AVE | Upgrade existing 125 amp panel with new panel. Replacing existing devices, adding motion sensing fixtures, replacing bath fan, replacing wall heater, add ceiling fan. Add new (2) 2 | $9,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
