COMPANY RECORD · SEATTLE, WA
R-C True Line Corporation — permit history in Seattle, WA
R-C True Line Corporation appears on 276 Seattle permit records from 2015 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 276 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 38 |
| 2016 | 25 |
| 2017 | 16 |
| 2018 | 28 |
| 2019 | 15 |
| 2020 | 25 |
| 2021 | 17 |
| 2022 | 24 |
| 2023 | 24 |
| 2024 | 18 |
| 2025 | 29 |
| 2026 | 17 |
Busiest year on record: 2015, with 38 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1201 WESTERN AVE | 2026-08-28 |
| 850 NW 45TH ST | 2026-08-12 |
| 2401 4TH AVE | 2026-08-12 |
| 822 QUEEN ANNE AVE N | 2026-07-14 |
| 4724 RAINIER AVE S | 2026-07-01 |
| 2254 7TH AVE | 2026-06-17 |
| 7543 63RD AVE NE | 2026-06-09 |
| 419 OCCIDENTAL AVE S | 2026-06-03 |
| 1614 W DRAVUS ST | 2026-05-29 |
| 1303 5TH AVE | 2026-05-27 |
| 1420 NW 56TH ST | 2026-05-21 |
| 6224 SAND POINT WAY NE | 2026-03-10 |
| 1221 E PIKE ST | 2026-02-27 |
| 1428 NW 56TH ST | 2026-02-27 |
169 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1 to $519,595, median $29,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
276 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7158181-EL | 2026-08-28 | Electrical | 1201 WESTERN AVE | Install two new sub panels. Install circuits and junction boxes for install of track lighting by others, Show lighting by others, and data by others. Install general use outlets as | $123,000 |
| 7157840-EL | 2026-08-12 | Electrical | 850 NW 45TH ST | Install new panel and outlets in kitchen. | |
| 7157839-EL | 2026-08-12 | Electrical | 2401 4TH AVE | Relocate one panel and transformer, install additional panel and transformer. Outlets and connections to kitchen. No changes to lighting or mechanical. | |
| 7152920-EL | 2026-07-14 | Electrical | 822 QUEEN ANNE AVE N | Relocate 200amp piece of equipment | |
| 7150908-EL | 2026-07-01 | Electrical | 4724 RAINIER AVE S | Lighting and kitchen remodel. Service to remain. | |
| 7134898-EL | 2026-06-17 | Electrical | 2254 7TH AVE | Electrical scope includes demolition of existing systems; installation of new lighting, power distribution, receptacles, and controls; and provision of dedicated circuits and conne | $200,000 |
| 7147233-EL | 2026-06-09 | Electrical | 7543 63RD AVE NE | Install 2 outlets and 4 lights | |
| 7144535-EL | 2026-06-03 | Electrical | 419 OCCIDENTAL AVE S | TI of 2nd floor to art studio space with gallery and independent studio spaces. Existing service and shared kitchen. Power to 6 fan coil units and low voltage by others. | $120,000 |
| 7145415-EL | 2026-05-29 | Electrical | 1614 W DRAVUS ST | Installation of a cooler, 1-20amp connection, 1-30amp connections, and 4 outlets in small remodel to existing space. | |
| 7143665-EL | 2026-05-27 | Electrical | 1303 5TH AVE | install lighting and code compliant controls, remove existing trans and install 45kva replacement, install 200amp 480v panel, install 225amp 120v panel, outlets to kitchen equipmen | $77,000 |
| 7142322-EL | 2026-05-21 | Electrical | 1420 NW 56TH ST | Install 2 - 200amp panels, relocated 1 - 200amp panel, Install lighting and controls, outdoor heaters in open air dinning area, kitchen equipment, connections to HVAC, and general | $120,000 |
| 7132685-EL | 2026-03-10 | Electrical | 6224 SAND POINT WAY NE | Install hood and Oven | |
| 7131338-EL | 2026-02-27 | Electrical | 1221 E PIKE ST | Swap lights over bar and corner booth, disconnect host stand and install quad outlet in new host stand using existing power, LED lighting at back bar, power to 3 - 30amp outdoor un | |
| 7131335-EL | 2026-02-27 | Electrical | 1428 NW 56TH ST | Install lighting and electric heaters, 20 general use receptacles, power to water heater, hand dryers, sign circuit. | |
| 7131149-EL | 2026-02-26 | Electrical | 1303 5TH AVE | Install lighting and code compliant controls, Remove existing trans and install 45kva replacement, Install 200amp 480v panel, install 225amp 120v panel, Outlets to kitchen equipmen | |
| 7127520-EL | 2026-02-02 | Electrical | 300 WESTLAKE AVE N | Various data locations throughout the location along with security cameras. | |
| 7123509-EL | 2026-01-05 | Electrical | 3058 NW 54TH ST | ||
| 7080248-EL | 2025-12-08 | Electrical | 2700 NE UNIVERSITY VILLAGE ST | Electrical work to support restaurant TI per plan[4/18/25 BGO - Confirm Valuation after EC assignment] [6/26/25 BGO - Approved Revised Plan Set] | $50,000 |
| 7118372-EL | 2025-11-25 | Electrical | 13537 AURORA AVE N | Automatic Door Switch | $2,000 |
| 7110141-EL | 2025-11-12 | Electrical | 300 WESTLAKE AVE N | We are doing a TI on level 1. We are installing (1) power supply, (1) smoke detector, (27) horn/strobes, (9) ceiling strobes, and (2) weatherproof horn/strobes.[12//18/2025 JBC Cha | $24,306 |
| 7114875-EL | 2025-11-03 | Electrical | 419 OCCIDENTAL AVE S | Install 15 outlets and 5 40amp equipment connections. | $8,000 |
| 7114418-EL | 2025-10-30 | Electrical | 600 PINE ST | Relocate service. | $8,200 |
| 7113750-EL | 2025-10-27 | Electrical | 315 N 145TH ST | Power to new type 1 hood and new ovens. | $5,000 |
| 7109136-EL | 2025-10-10 | Electrical | 822 QUEEN ANNE AVE N | Completion of previously started remodel of existing apartment spaces. [9-30-25 DR - previous permit 6825305-EL] | $170,000 |
| 7104634-EL | 2025-09-11 | Electrical | 300 WESTLAKE AVE N | Restaurant and Bar Tenant Build out in existing 7,186sq ft restaurant space. Installation of lighting and controls, electrical to casework, outlets and connections to kitchen equip | $317,925 |
| 7104973-EL | 2025-09-04 | Electrical | 4449 CALIFORNIA AVE SW | Connections to type 1 hood | $4,000 |
| 7097070-EL | 2025-07-18 | Electrical | 851 NW 85TH ST | New hood and exhaust system. | $5,000 |
| 7081543-EL | 2025-07-14 | Electrical | 3700 S FERDINAND ST | Install lighting and controls, new 400amp single phase panel and 200amp sub panel, outlets and equipment connections. [7/14/2025 BGO - Approved Plan Set] | $158,485 |
| 7091417-EL | 2025-06-16 | Electrical | 1614 W DRAVUS ST | Install 4 dedicated circuits | $2,000 |
| 7090575-EL | 2025-06-11 | Electrical | 3015 E MADISON ST | Install 4 dedicated circuits | $5,000 |
| 7087996-EL | 2025-05-28 | Electrical | 419 OCCIDENTAL AVE S | Install new 200amp 480v panel, 75kva trans, 200amp 120v panel, kitchen connections, and HVAC power. | $105,300 |
| 7087410-EL | 2025-05-22 | Electrical | 199 ALASKAN WAY S | Install 20amp Heat Tape in exterior restroom. | $1,000 |
| 7087157-EL | 2025-05-21 | Electrical | 199 ALASKAN WAY S | Install 20amp circuit for heat tape | $2,000 |
| 7086832-EL | 2025-05-20 | Electrical | 4556 CALIFORNIA AVE SW | Add 200amp feeder and panel(6/13/2025 Inspector JDC closing permit. Service was not added and meter blanked off. Meter will not be used.) | $5,000 |
| 7086161-EL | 2025-05-15 | Electrical | 199 ALASKAN WAY S | 30amp connection for exterior bathroom unit. | $2,000 |
| 7082235-EL | 2025-04-23 | Electrical | 13537 AURORA AVE N | Adding 200amp feeder | $1,500 |
| 7023763-EL | 2025-03-28 | Electrical | 315 1ST AVE N | Tom's Watch Bar Electrical TI | $175,000 |
| 7077240-EL | 2025-03-25 | Electrical | 506 2ND AVE | Install 15 fire alarm devices | $3,000 |
| 7074460-EL | 2025-03-10 | Electrical | 501 FAIRVIEW AVE N | Install new LED lighting and connections for added lighting for tenant improvement to space. | $33,000 |
| 7071257-EL | 2025-02-19 | Electrical | 4556 CALIFORNIA AVE SW | Install lighting and controls, outlets and kitchen connections. | $385,000 |
| 7071282-EL | 2025-02-19 | Electrical | 199 ALASKAN WAY S | Install lighting, kitchen equipment, outlets, signage, and heat tape. | $40,500 |
| 7071250-EL | 2025-02-19 | Electrical | 1917 QUEEN ANNE AVE N | Install lighting, outlets, LED drivers, sign circuit, and fireplace. | $54,000 |
| 7057435-EL | 2025-02-18 | Electrical | 4601 26TH AVE NE | EXISTING EST3 ADDRESSABLE SYSTEM TO REMAIN. ALL EXISTING NOTIFICATION WIRING TO BE REMOVED. EXISTING HORN/STROBE DEVICES TO BE RELOCATED AND NEW DEVICES PROVIDED WHERE REQUIRED. TW | $3,500 |
| 7068713-EL | 2025-02-04 | Electrical | 13537 AURORA AVE N | Relocate existing panel and add 20 new outlets. Some electrical demo. [C.Kenefick 4/24/2024 - 200a feeder added to permit.] | $21,000 |
| 7068562-EL | 2025-02-03 | Electrical | 4730 CALIFORNIA AVE SW | TI for new hair salon space. | $118,000 |
| 7043022-EL | 2025-01-15 | Electrical | 4601 26TH AVE NE | TENANT IMPROVEMENT OF AN INTERIOR SPACE IN AN EXISTING MULTI-TENANT BUILDING AS PART OF AN OUTDOOR SHOPPING MALL FOR RETAIL, RESTAURANT, AND BAR USE | $350,000 |
| 7055220-EL | 2024-11-07 | Electrical | 3509 STONE WAY N | Update lighting and controls, connections for equipment and HVAC, 10 general use outlets, 1 - 200amp sub panel fed from 400amp mini panel. | $71,000 |
| 7055241-EL | 2024-11-07 | Electrical | 506 2ND AVE | Install lighting and controls, relocate panel, fire alarm, equipment connections. | $144,000 |
| 7046967-EL | 2024-09-19 | Electrical | 2417 NW MARKET ST | Build out of existing space for food service. Installation of lighting and power for equipment. Service existing. | $92,736 |
| 7046256-EL | 2024-09-16 | Electrical | 1091 THOMAS ST | New FOH lighting and order kiosk and BOH exhaust hood connections power for kitchen equipment. | $28,600 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
