COMPANY RECORD · SEATTLE, WA

Current Solutions NW — permit history in Seattle, WA

Current Solutions NW appears on 78 Seattle permit records from 2019 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical78100%

Activity by year

YearPermits issued
201910
202015
202127
202217
20235
20241
20251
20262

Busiest year on record: 2021, with 27 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
6000 16TH AVE SW2026-03-31
2632 NE UNIVERSITY VILLAGE ST2026-02-10
14352 LAKE CITY WAY NE2025-03-11
519 N BOWDOIN PL2024-02-05
1607 14TH AVE2023-12-29
514 FEDERAL AVE E2023-12-29
1122 23RD AVE2022-11-28
1114 8TH AVE W2022-11-21
1942 S LANDER ST2022-08-25
3008 12TH AVE S2022-07-14
1320 E PINE ST2022-06-07
5620 55TH AVE NE2022-05-25
6035 42ND AVE SW2022-04-07
6037 42ND AVE SW2022-02-06

40 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $2,600,000, median $1,450. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

78 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7136068-EL2026-03-31Electrical6000 16TH AVE SWReplacing food warmer and moving location for fridge receptacles
7128728-EL2026-02-10Electrical2632 NE UNIVERSITY VILLAGE ST
7074852-EL2025-03-11Electrical14352 LAKE CITY WAY NEInstalled a 4-Square and plug where the existing panel was located. Then from that 4-square then 90 into the new panel. Added a plug for the AES radio$500
7005124-EL2024-02-05Electrical519 N BOWDOIN PLMulti-family 22,080 sq ft. 8 levels, consisting of 29 units and 3 additional units in existing structure. Line voltage, door access, security and telecoms. [2/5/24 JSS See permit 6$859,708
7002647-EL2023-12-29Electrical1607 14TH AVEEast Pine Apartments Temp Power 2x 200a 3 phase 208v$7,500
7002644-EL2023-12-29Electrical519 N BOWDOIN PLRelocating service to exterior of building & temporary feed of service. New building being constructed behind existing building. Permanent power of existing building once new build$27,732
7002641-EL2023-12-29Electrical514 FEDERAL AVE EREFER TO ASSOCIATED 6966858-EL PERMIT, UFER GROUND TESTING PERMIT$850,000
7002636-EL2023-12-29Electrical514 FEDERAL AVE EFederal Ave Temp (2) 200A temp services on a single pole$3,200
6966858-EL2023-09-07Electrical514 FEDERAL AVE EMixed use 42,000 sq ft. 5 levels, 58 Units, one in building vault, one elevator, 2 stair wells. Will have door access, FA, security, telecoms.$850,000
6935656-EL2022-11-28Electrical1122 23RD AVEGym Tenant Improvement$80,000
6934882-EL2022-11-21Electrical1114 8TH AVE WNew Construction SFR with ADU on same meter.$130,000
6925842-EL2022-10-03Electrical1114 8TH AVE WTemp Power for residence remodel and addition$1,000
6921878-EL2022-09-12Electrical514 FEDERAL AVE E(2) 200A temp services on a single pole$3,200
6919175-EL2022-08-25Electrical1942 S LANDER STDuplex with (2) DADUs and House Meter$74,740
6905770-EL2022-08-04Electrical1607 14TH AVETHE PROJECT IS A MULTIFAMILY BUILDING IN THE CAPITOL HILL NEIGHBORHOOD WITH 79-UNITS WITH APPROXIMATELY 1,750 SF OF GROUND FLOOR COMMERCIAL EATING AND DRINKING ESTABLISHMENT ALONG $1,324,271
6911203-EL2022-07-14Electrical3008 12TH AVE S200A Overhead Temp Power$1,500
6907554-EL2022-06-24Electrical1942 S LANDER STUfer for Duplex with (2) DADUs$0
6904334-EL2022-06-07Electrical1320 E PINE STTemp Power 2x 200a 3 phase 208v$7,500
6902050-EL2022-05-25Electrical5620 55TH AVE NEADU with 2 bedrooms, kitchen, bathroom and generator$10,000
6901091-EL2022-05-20Electrical5620 55TH AVE NERemodel master bedroom, add ADU with 2 bedrooms, kitchen, bathroom, and remodel garage. PEM 6/22/2022 per zendesk request 25676, added 20 each light fixtures, switches and receptac$20,000
6893084-EL2022-04-07Electrical6035 42ND AVE SWRefeeding 200A service$6,500
6883217-EL2022-02-16Electrical1942 S LANDER ST200A Overhead temp power pole. 02/16/2023 Renewed.$1,200
6852895-EL2022-02-15Electrical519 N BOWDOIN PLRelocate service to ext of bldg & temp feed of service. New bldg being constructed behind existing bldg. Permanent power of existing bldg once new bldg & infrastructure is in place$27,732
6881393-EL2022-02-06Electrical6037 42ND AVE SWUfer for triplex$1
6881392-EL2022-02-06Electrical6037 42ND AVE SWNew Construction Triplex$58,840
6881390-EL2022-02-06Electrical6245 30TH AVE NESFR Remodel$7,300
6874056-EL2021-12-17Electrical4622 S ORCHARD STNW SFR and DADU. Fees paid under parent permit 6872393-EL. 11/17/2022 renewal$0
6872393-EL2021-12-17Electrical4624 S ORCHARD ST(4) single family homes with (4) DADU's. 600A service, (8) residential meters & (1) house meter. No on-site parking. 11/17/2022 renewal$102,900
6874055-EL2021-12-17Electrical4626 S ORCHARD STSW SFR and DADU. Fees paid under parent permit 6872393-EL. 11/17/2022 renewal$0
6874054-EL2021-12-17Electrical4628 S ORCHARD STSE SFR and DADU. Fees paid under parent permit 6872393-EL. 11/17/2022 renewal$0
6870107-EL2021-11-22Electrical4622 S ORCHARD STUfer Ground$0
6870117-EL2021-11-22Electrical4624 S ORCHARD STUfer Ground$0
6870119-EL2021-11-22Electrical4626 S ORCHARD STUfer Ground Unit A$0
6870121-EL2021-11-22Electrical4628 S ORCHARD STUfer Ground Unit B$0
6867250-EL2021-11-04Electrical4628 S ORCHARD STUfer Ground$0
6867256-EL2021-11-04Electrical4626 S ORCHARD STUfer Ground$0
6867257-EL2021-11-04Electrical4622 S ORCHARD STUfer Ground$0
6867258-EL2021-11-04Electrical4624 S ORCHARD STUfer Ground$0
6852893-EL2021-08-23Electrical513 1ST AVE N600A temp service, (3) 200A subpanels, step-up transformer, crane hookup. 8/23/21 JSS Value for temp power is included in Permit #6811524-EL at $42500. Renewal NDM 12/27/23$1,000
6848963-EL2021-07-19Electrical4626 S ORCHARD ST200A Overhead Temp Pole$400
6847759-EL2021-07-12Electrical2203 22ND AVE SSingle Family with DADU TR 7/30/2021 add house meter. PEM 6/22/2022 renew$12,000
6847762-EL2021-07-12Electrical2119 S WALKER STSingle family with DADU. PEM 6/22/2022 renew.$12,000
6847761-EL2021-07-12Electrical2117 S WALKER STSingle family with DADU. PEM 6/22/2022 renew$12,000
6841379-EL2021-06-01Electrical4727 12TH AVE NEUfer test$0
6837727-EL2021-05-10Electrical2203 22ND AVE SUfer for (3) single families with (3) DADU - 2203,2117,2119$0
6832074-EL2021-04-14Electrical3138 FAIRVIEW AVE ERelocating 600A 3-phase Delta service, new gear$21,500
6824389-EL2021-03-23Electrical106 N 36TH STMixed-Use building consisting of 38 residential units, one commercial shell and one level of parking. 3-5-21 BZ Address changed to correct address, Contractor Error. 2/22/2022 rene$442,780
6828380-EL2021-03-15Electrical2203 22ND AVE S200A Overhead Temp power pole with (2) 50A GFCI outlets$1,000
6827496-EL2021-03-09Electrical6039 42ND AVE SWRe feeding 200A service. Replacing meter can.$2,500
6827177-EL2021-03-08Electrical6041 42ND AVE SWNew Construction Triplex Line and Low Voltage 300A service$51,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →