COMPANY RECORD · SEATTLE, WA

Cosco Fire Protection — permit history in Seattle, WA

Cosco Fire Protection appears on 286 Seattle permit records from 2018 through 2026, most often fire protection (71% of the record).

Permit categories

CategoryPermitsShare
Fire protection20371%
Electrical8329%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
201812
201937
202014
202123
202219
202336
202464
202543
202638

Busiest year on record: 2024, with 64 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
509 OLIVE WAY2026-08-27
800 5TH AVE2026-08-25
2690 NE VILLAGE LN2026-08-19
400 9TH AVE N2026-08-19
1900 9TH AVE2026-08-05
1301 5TH AVE2026-07-29
600 UNIVERSITY ST2026-07-24
1208 EASTLAKE AVE E2026-07-21
600 PINE ST2026-07-07
1930 6TH AVE S2026-07-01
3611 E DENNY WAY2026-06-16
909 5TH AVE2026-06-04
700 5TH AVE2026-06-01
1201 2ND AVE2026-05-18

194 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $5,487,000, median $11,274. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

286 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7160265-EL2026-08-27Electrical509 OLIVE WAYAdding (3) SD500 devices to area for protection.
7160262-EL2026-08-27Electrical509 OLIVE WAYAdding (Qty.4) Speaker Strobes to area lacking coverage.
7159757-EL2026-08-25Electrical800 5TH AVECustomer is adding a new bathroom on the 28th floor that will require a single wall mount strobe to meet fire code.
7158923-FS2026-08-19Fire protection2690 NE VILLAGE LNTENANT IMPROVEMENT - Cosco Fire Protection to modify existing wet system to accommodate new walls and ceilings per NFPA 13, 2019.$15,722
7158913-FS2026-08-19Fire protection400 9TH AVE Nrelocate 20 QR upright sprinklers for the removal of 12" of insulation at the deck$14,755
7156801-EL2026-08-05Electrical1900 9TH AVEChanging and relocating 3 notification appliances from ceiling mount to wall mount in the area of work.
7153492-FS2026-07-29Fire protection1301 5TH AVETenant improvement of the entirety of L36, L37, and L39, and approximately half of L38 of existing Rainier Tower. All existing ceilings within tenant spaces outside of elevator lob$179,000
7154819-FS2026-07-24Fire protection600 UNIVERSITY STreplace 9 existing QR pendent sprinklers with new VS2 Pendent sprinkler and add 2 VS2 Pendent sprinklers on both Level 35 and Level 36 elevator lobbys. VS2's are flexable sprinkler$14,598
7154186-FS2026-07-21Fire protection1208 EASTLAKE AVE EAdding and relocating sprinklers around 4 new offices being built in existing open office space.$7,900
7151727-FS2026-07-07Fire protection600 PINE STrelocate 7 concealed pendents in soffit that is being modified$5,620
7150902-FS2026-07-01Fire protection1930 6TH AVE STENANT IMPROVEMENT - Cosco Fire Protection is to add/ relocate sprinkler heads to accommodate new project area layout per NFPA 13, 2019$13,197
7148446-FS2026-06-16Fire protection3611 E DENNY WAYTenant improvement in existing private school. Existing office spaces are being converted to classrooms. Adding, relocating, and plugging sprinklers to accommodate a new wall and c$6,900
7146332-EL2026-06-04Electrical909 5TH AVE25th floor mechanical room has 4-5 fire alarm field devices that need to be relocated in the same room temporarily while un-related boiler equipment repair / replacement takes plac
7143155-FS2026-06-01Fire protection700 5TH AVETENANT IMPROVEMENT - Cosco Fire Protection to modify existing wet sprinkler system to accommodate new office layout for Level 46 and Level 48 per NFPA 13 2019.$79,426
7143712-FS2026-05-18Fire protection1201 2ND AVETENANT IMPROVEMENT - Cosco Fire Protection to add sprinkler to new phone booths for L28 and L29.$8,007
7130705-FS2026-05-12Fire protection500 BOREN AVE NTENANT IMPROVEMENT OF FLOORS 1-5 OF EXISTING BUILDING. CONSTRUCTION OF NEW WALLS & CEILINGS TO CREATE OFFICE SPACES CATEGORIZED AS GROUP B (BUSINESS), ASSEMBLY SPACES CATEGORIZED $44,960
7142748-EL2026-05-12Electrical800 5TH AVETemporarily remove and then reinstall upon completion of the remodel work, one (1) speaker strobe on level 39 just inside the occupied space.
7140857-EL2026-04-30Electrical909 5TH AVETo upgrade the existing Notifier NFS2-3030 fire alarm control panel with the direct replacement Notifier N16X with integrated digital voice and smoke control capabilities. The repl$70,000
7136540-EL2026-04-20Electrical1900 9TH AVEUpdate of notification appliances on level 5 associated with the tenant improvement project as noted within the area of work on the drawings.1 existing strobe will be removed, 1 ex$11,000
7138864-EL2026-04-17Electrical2230 4TH AVEPROVIDING NEW FIRE ALARM CONTROL PANEL, NEW SMOKE DETECTOR, AND PROGRAMMING.
7137955-EL2026-04-13Electrical1735 DEXTER AVE NPanel Replacement with Surge protection
7137952-EL2026-04-13Electrical1735 DEXTER AVE NReplace FACP with surge protector
7137950-EL2026-04-13Electrical1735 DEXTER AVE NReplaced FACP and surge protector
7133157-EL2026-03-12Electrical1027 NE 65TH STAs part of recent demolition and new wall installation, two wall-mounted fire device will need to be reinstalled. Previously wall-mounted devices will need to be reinstalled; howev
7131558-FS2026-03-11Fire protection922 MCGILVRA BLVD ETENANT IMPROVEMENT - REFERENCE TO ISSUED PERMIT 7101234-FS - Revision to Level 1 Wet Fire Sprinkler System layout due to install constructability.$24,570
7125666-EL2026-03-11Electrical800 5TH AVEAs part of the tenant improvement to renovate suites on level 39 through level 42 of the building, the fire alarm system notification appliances will be updated in the area of work$50,000
7129102-EL2026-03-09Electrical2100 ALASKAN WAYComplete replacement and upgrade of the head-end fire alarm control panel. This replacement is necessary due to the aging condition of the current system.$100,000
7125672-EL2026-02-19Electrical800 5TH AVELevel 38 renovation of suites. Fire alarm system notification appliances will be updated in the area of work. Existing speaker circuit on level 38 will be used for the new applianc$8,000
7129938-FS2026-02-18Fire protection2025 1ST AVEadd 1 QR pendent sprinkler on Level 5 for new small conference room 05-301 and add 1 QR pendent sprinkler on Level 6 for new lactation room 06-205$4,270
7105838-EL2026-02-18Electrical2700 NE UNIVERSITY VILLAGE STTENANT IMPROVEMENT TO EXISTING FIRE ALARM SYSTEM IN EXISTING BUILDING. NEW PULL STATIONS AT EXITS, DUCT DETECTION SUPERVISION, & OCCUPANT NOTIFICATION$60,171
7117622-EL2026-02-05Electrical2414 43RD AVE EREPLACE FACP WITH SILENT KNIGHT 6700, ADD CLSS FOR MONITORING, REPLACE MINI-HORNS IN BEDROOMS WITH LOW FREQUENCY SOUNDERS, SWAPPING OUT DEVICES AND USING EXSITING WIRE$33,520
7122449-FS2026-02-03Fire protection400 WESTLAKE AVE NCOSCO FIRE SCOPE OF WORK IS ON THE 1ST AND 13TH FLOORS. ADD/RELOCATE PENDENTS AND UPRIGHTS FOR TI.$69,433
7127005-EL2026-01-29Electrical511 W MERCER PL
7126734-EL2026-01-27Electrical2325 43RD AVE E
7072809-FS2026-01-12Fire protection1200 STEWART STA T.I. project for the existing 1200 Stewart high-rise project. Scope involves a new decommissioned Boeing Airplane housed & suspended within the galleria atrium. Plane is provid$33,880
7074379-EL2026-01-12Electrical1200 5TH AVEChanging Suite 200 & 300 to Shell & core with eight speaker/strobes in area, leaving one smoke and one pull in area.$9,900
7123841-FS2026-01-07Fire protection1301 2ND AVErelocating / adding 10 sprinklers$9,210
7123842-FS2026-01-07Fire protection1000 DEXTER AVE NAdd / relocate 11 pendents / uprights within space$10,376
7122577-FS2025-12-24Fire protection600 PINE STRelocating / adding 14 sprinklers due to new walls & ceiling changes$5,810
7121821-FS2025-12-18Fire protection13701 AURORA AVE NTENANT IMPROVEMENT - Cosco Fire Protection to modify existing preaction system per NFPA 13, 2019 and City of Seattle.$47,493
7121583-FS2025-12-17Fire protection400 N 34TH STrelocate 22 sprinkler heads$14,695
7113464-FS2025-12-08Fire protection1301 5TH AVEImprovements in existing tenant space, on Levels 16 + 17 of Rainier Tower. Entirety of Level 16 is within scope (15,636 sq.ft), while only a portion of Level 17 is (8,266 sq.ft). $88,216
7119318-FS2025-12-02Fire protection316 BROADWAYCOSCO FIRE PROTECTION SCOPE OF WORK IS ADD/ RELOCATE 24 SPRINKLERS FOR NEW WALLS AND CEILINGS.$25,160
7108450-FS2025-11-20Fire protection325 9TH AVE NCosco Fire Protection to add/relocate sprinkler heads to accommodate new walls and ceiling office layout for Levels 10-12 per NFPA 13, 2019.$175,734
7105522-EL2025-11-06Electrical800 5TH AVETENANT IMPROVEMENT PHASE 3 CONNECTING NOTIFICATION DEVICES TO EXISTING FIRE ALARM CONTROL PANEL. ADDINT INPUT MODULES AND RELAYS FOR CONTROLLING RTUS.$10,000
7113293-EL2025-10-23Electrical201 ELLIOTT AVE WUPDATE FIRE ALARM SYSYSTEM FOR TENANT IMPROVEMENT ADDING NEW ROOMS TO SPACE. USE EXISTING POWER SUPPLY AND TAPPING OFF OF EXISTING CIRCUIT.$3,500
7111139-FS2025-10-10Fire protection4800 SAND POINT WAY NErelocate 5 pendents after ceiling tiles are replaced$1,500
7110707-FS2025-10-08Fire protection601 UNION ST3 flex relocates$1,500
7101426-EL2025-09-17Electrical5425 SHILSHOLE AVE NWInstallation of a new fire alarm system. The design includes monitoring of the fire sprinkler system, code compliant smoke/heat detection, manual pull stations, and occupant notifi$129,000
7101234-FS2025-08-26Fire protection922 MCGILVRA BLVD ETENANT IMPROVEMENT - Cosco Fire Protection to add and relocate sprinklers from an existing fire sprinkler system to accommodate new floor and ceiling layout in Levels 1 and 2 per N$24,570

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →