COMPANY RECORD · SEATTLE, WA
Cascade Energy Services Electrical — permit history in Seattle, WA
Cascade Energy Services Electrical appears on 37 Seattle permit records from 2022 through 2026, all of them electrical.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 37 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 1 |
| 2023 | 8 |
| 2024 | 9 |
| 2025 | 13 |
| 2026 | 6 |
Busiest year on record: 2025, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1919 NE 137TH ST | 2026-07-27 |
| 9731 8TH AVE NE | 2026-05-10 |
| 13320 23RD PL NE | 2026-04-23 |
| 1318 E BOSTON ST | 2026-02-27 |
| 10616 ALTON PL NE | 2026-01-29 |
| 3006 34TH AVE W | 2026-01-06 |
| 9736 49TH AVE NE | 2025-09-08 |
| 210 N 87TH ST | 2025-09-03 |
| 3828 WOODLAWN AVE N | 2025-09-03 |
| 8625 30TH AVE SW | 2025-08-01 |
| 8627 30TH AVE SW | 2025-08-01 |
| 7350 31ST AVE SW | 2025-04-10 |
| 3243 NW 64TH ST | 2025-04-08 |
| 14001 23RD AVE NE | 2025-02-27 |
29 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $200 to $40,000, median $2,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
37 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 7155006-EL | 2026-07-27 | Electrical | 1919 NE 137TH ST | Minisplit 10a, service receptacle | |
| 7142396-EL | 2026-05-10 | Electrical | 9731 8TH AVE NE | Office plugs, bed plugs, exterior plugs, heat pump | |
| 7139838-EL | 2026-04-23 | Electrical | 13320 23RD PL NE | Service upgrade from 100a to 200a, panel change, heat pump | |
| 7131249-EL | 2026-02-27 | Electrical | 1318 E BOSTON ST | Addition of (1) 30a, and (1) 40a heat pump circuit, breaker, and disconnects. Service receptacles within 25' of each unit. Panel in basement, heat pumps on south exterior of reside | |
| 7127188-EL | 2026-01-29 | Electrical | 10616 ALTON PL NE | ||
| 7123664-EL | 2026-01-06 | Electrical | 3006 34TH AVE W | ||
| 7105661-EL | 2025-09-08 | Electrical | 9736 49TH AVE NE | 50a 240v EV circuit/receptacle | $2,500 |
| 7104795-EL | 2025-09-03 | Electrical | 210 N 87TH ST | Installation of (3) new downstairs heaters | $1,000 |
| 7104857-EL | 2025-09-03 | Electrical | 3828 WOODLAWN AVE N | Heat pump install 40a | $900 |
| 7099561-EL | 2025-08-01 | Electrical | 8625 30TH AVE SW | 2 units [3.10.26 VR - See also Permit 7099552-EL / 6997511-CN for Single Unit Dwelling) | $30,000 |
| 7099552-EL | 2025-08-01 | Electrical | 8627 30TH AVE SW | Single unit, [3.10.26 VR See also 7099561-EL / 6982320-CN for Duplex Unit] | $15,000 |
| 7090284-EL | 2025-06-10 | Electrical | 8627 30TH AVE SW | Ufer inspection | $650 |
| 7090292-EL | 2025-06-10 | Electrical | 8625 30TH AVE SW | Ufer inspection | $650 |
| 7081526-EL | 2025-04-18 | Electrical | 210 N 87TH ST | Sub panel, upstairs circuits relocate | $4,000 |
| 7080218-EL | 2025-04-10 | Electrical | 7350 31ST AVE SW | Kitchen remodel [C.Kenefick 8/12/2025 - fee added for 20a dedicated circuit for ceiling heat. Post admin waived.] | $2,000 |
| 7080264-EL | 2025-04-10 | Electrical | 7350 31ST AVE SW | Kitchen Remodel ufer installation [C.Kenefick 5/6/2025 - ufer not needed. No new service work being done.] | $200 |
| 7079605-EL | 2025-04-08 | Electrical | 3243 NW 64TH ST | Remodel complete rewire, re-attach service to new 3rd story. | $40,000 |
| 7072711-EL | 2025-02-27 | Electrical | 14001 23RD AVE NE | Service 200a upgrade, panel change to 200a | $2,000 |
| 7070747-EL | 2025-02-15 | Electrical | 8627 30TH AVE SW | Temp pole | $600 |
| 7053139-EL | 2024-10-24 | Electrical | 6020 26TH AVE NE | 30a Heat Pump, service receptacle under overhang. | $1,000 |
| 7042014-EL | 2024-08-20 | Electrical | 1606 3RD AVE W | EV install on detached garage | $2,200 |
| 7041250-EL | 2024-08-16 | Electrical | 7948 10TH AVE SW | 15a Heatpump install [C.Kenefick 7/31/2026 - Renewal fee added.] | $1,000 |
| 7037655-EL | 2024-07-26 | Electrical | 6934 37TH AVE SW | 2 story DADU, garage downstairs, living unit above. | $8,000 |
| 7026992-EL | 2024-05-23 | Electrical | 1606 3RD AVE W | New Heat Pump | $1,400 |
| 7026486-EL | 2024-05-22 | Electrical | 5976 26TH AVE SW | General Contractor found us to repair previous electricians work. They installed a OH conversion kit before the meter, which allows access to feeders. | $3,500 |
| 7014783-EL | 2024-03-15 | Electrical | 732 11TH AVE E | Install new wall sconce | $500 |
| 7012084-EL | 2024-02-29 | Electrical | 6932 37TH AVE SW | New Construction DADU, main house remodel [C.Kenefick 7/26/24 - DADU is on permit 7037655.] | $29,000 |
| 7005427-EL | 2024-01-18 | Electrical | 1143B N 93RD ST | Installing (1) 15a minisplit | $900 |
| 6998008-EL | 2023-11-28 | Electrical | 6225 NE PRINCETON WAY | Some knob and tube left over, replacing lighting circuits. New furnace. | $12,500 |
| 6984097-EL | 2023-09-02 | Electrical | 5604 23RD AVE SW | 2400sq ft per unit, gas used for boiler, and range. | $34,000 |
| 6984098-EL | 2023-09-02 | Electrical | 5606 23RD AVE SW | 2400sq ft per unit. Gas used for boiler and range. | $34,000 |
| 6966944-EL | 2023-05-26 | Electrical | 2005A DEXTER AVE N | Running 1 new 35A 240v EV charger circuit from interior panel, to driveway. | $1,800 |
| 6957827-EL | 2023-04-07 | Electrical | 6844 47TH AVE NE | 3rd & 2nd floor lighting remodel, along with new furnace and heat pump | $10,000 |
| 6956865-EL | 2023-04-03 | Electrical | 6401 DAYTON AVE N | Providing 20A motor power for lift and 15a lighting | $1,800 |
| 6956866-EL | 2023-04-03 | Electrical | 6844 47TH AVE NE | 3rd & 2nd floor lighting remodel, along with new furnace and heat pump | $10,000 |
| 6945897-EL | 2023-02-01 | Electrical | 6844 47TH AVE NE | Running 1 new 30a heat pump circuit, and 2 new furnace circuits 30a/60a | $1,300 |
| 6936943-EL | 2022-12-06 | Electrical | 9533 45TH AVE NE | Running surface mounted 12/2 MC cable from mechanical room into closet under the stairs and into new dedicated stairlift receptacle. | $882 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
