COMPANY RECORD · SEATTLE, WA

Northwest Electric & Solar — permit history in Seattle, WA

Northwest Electric & Solar appears on 2,439 Seattle permit records from 2015 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical2439100%

Activity by year

YearPermits issued
2015205
2016255
2017189
2018242
2019232
2020211
2021313
2022238
2023270
2024226
202528
202630

Busiest year on record: 2021, with 313 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
323 NW 54TH ST2026-08-26
21 W COMSTOCK ST2026-08-17
3700 W COMMODORE WAY2026-08-14
1388 ALKI AVE SW2026-08-03
1711 MADRONA DR2026-07-29
615 W PROSPECT ST2026-07-28
3314 SW HINDS ST2026-07-15
363 NW 76TH ST2026-06-25
2735 NE 103RD ST2026-06-22
410 18TH AVE E2026-06-16
5238 39TH AVE NE2026-06-15
410 NE 70TH ST2026-06-15
1902 31ST AVE S2026-06-11
5822 56TH AVE NE2026-06-11

1,798 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,000,000, median $0. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

2,439 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7159945-EL2026-08-26Electrical323 NW 54TH STInstalling circuit for EV charger
7155044-EL2026-08-17Electrical21 W COMSTOCK STInside electrical room install 50 breaker disconnect to unit 102. Inside disconnect install Tesla load shedding module. From disconnect surface mount 3/4 inch flexible conduit 5-8f$2,000
7154809-EL2026-08-17Electrical21 W COMSTOCK STPamela Kraus EVC installation: Inside electrical room install to unit # 501 a 50 amp breaker disconnect. Inside breaker disconnect install Tesla load shedding module. From disconne$2,000
7155085-EL2026-08-17Electrical21 W COMSTOCK STInside electrical room install 50 amp breaker disconnect to unit 301. Inside disconnect install Tesla load shedding module. From disconnect surface mount 3/4 inch flexible conduit $2,000
7155060-EL2026-08-17Electrical21 W COMSTOCK STInside electrical room install to unit 301 50 amp breaker disconnect. Inside breaker disconnect install Tesla load shedding module. From disconnect surface mount 3/4 inch flexible $2,000
7158211-EL2026-08-14Electrical3700 W COMMODORE WAYInstall hardwired charger up to 35 ft from electrical panel. Inside sub panel install NWEs supplied Load shedding module. From Sub panel surface mount 3/4 inch EMT conduit 35ft ins
7156296-EL2026-08-03Electrical1388 ALKI AVE SWInside electrical room install DCC-12 to condo unit along with 50 amp breaker disconnect. From breaker disconnect surface mount 3/4 inch flex to nearest existing EV J box. Pull #6
7155601-EL2026-07-29Electrical1711 MADRONA DRInstall hardwired charger up to 5 ft from electrical panel. From sub panel inside garage. Install NWES supplied Tesla load shedding module. From sub panel surface mount 3/4 inch fl
7155351-EL2026-07-28Electrical615 W PROSPECT STMax Bardon - EVC installation
7153205-EL2026-07-15Electrical3314 SW HINDS STFrom breaker panel surface mount 3/4 inch flexiblele conduit 5ft from breaker panel. Install customer supplied EV charger. Charger will be mounted in an attached garage. EV charger
7150099-EL2026-06-25Electrical363 NW 76TH STEVC installation
7149344-EL2026-06-22Electrical2735 NE 103RD STEVC installation
7148392-EL2026-06-16Electrical410 18TH AVE EInstall hardwired charger up to 5 ft from electrical panel. From sub panel in garage surface mount 3/4 inch flexible conduit within 5ft. Install customer supplied Tesla universal w
7148132-EL2026-06-15Electrical5238 39TH AVE NE-          Remove existing gear as needed so new siding can be installed. -          Replace gear in existing location. -          Add new 120v GFCI outlet outside for new awni
7148120-EL2026-06-15Electrical410 NE 70TH STInside electrical room install Tesla load shedding module with 50 amp disconnect to unit #201. From disconnect use pre existing raceway into parking garage. From parking garage J b
7147745-EL2026-06-11Electrical1902 31ST AVE SMatthew Hall - EVC installation
7147747-EL2026-06-11Electrical5822 56TH AVE NEInstall hardwired charger 5 ft from electrical panel. From pre wired J box install customer supplied EV charger. Remove 2 pole 50 amp GFCI breaker in sub panel. Charger will be mou
7147718-EL2026-06-11Electrical1305 E PROSPECT STEV charger From Tesla Gateway surface mount 3/4 inch EMT conduit 8-10ft. Install customer supplied EV charger. Commission EV charger on 2-pole 60 amp breaker. Inside Tesla Gateway
7134835-EL2026-03-24Electrical5509 5TH AVE NWOu Ye - EVC installation
7132681-EL2026-03-10Electrical6517 6TH AVE NWFrom breaker panel surface mount 3/4 inch flexible conduit 30-35ft inside unfinished basement. Drill outside and transition into PVC conduit. Install 60 amp non fused disconnect ou
7131156-EL2026-02-26Electrical1250 ALKI AVE SW-          From EV charger house panel run _ inch flexible conduit into parking garage. -          Inside parking garage transition into _ inch EMT conduit. -          Use existing
7128672-EL2026-02-10Electrical5315 46TH AVE SW
7128510-EL2026-02-09Electrical4057 SW HOLGATE STCustomer is purchasing charger separately and will provide it at the time of the installation,- From sub panel inside the house run 4-3 romex cable 20ft under stairs. drill outsid
7127944-EL2026-02-04Electrical530 BROADWAY E
7127762-EL2026-02-03Electrical9546 2ND AVE NW
7127740-EL2026-02-03Electrical5315 46TH AVE SWRemove existing overhead service. Move new 200amp meter/main overhead service to front SE part of House. From new meter/ main surface mount 2 inch PVC outside 20-25ft. LB
7126878-EL2026-01-28Electrical1564 ALKI AVE SWIn main electrical room install 200amp load shedding module to unit 404 with a 50amp breaker disconnect. From smart switch use existing EV raceway to closest J box in uppe
7126463-EL2026-01-26Electrical225 27TH AVE E
7126398-EL2026-01-26Electrical2612 32ND AVE W
7125512-EL2026-01-19Electrical3811 29TH AVE W
7109609-EL2025-10-01Electrical4721 S ORCAS STPanel change - like for like - Randy Nelson 14433$0
7100937-EL2025-08-11Electrical1664 FEDERAL AVE E14351 Lisa Erlanger From Sq D QO breaker panel inside garage install load shedding module inside panel. - From Sub panel surface mount _ Inch EMT pipe 30-35ft from the panel. - Ei$0
7095556-EL2025-07-10Electrical7100 55TH AVE SThis is for the remodel of a basement. Going from an unfinished basement to a finished basement with bedrooms a bathroom and an office and exercise room.$40,000
7090351-EL2025-06-10Electrical4949 ERSKINE WAY SWOH temp pole$500
7089437-EL2025-06-04Electrical4828 NE 85TH STRemodel.; [7/1/26 RN Renewal/Reinstatement fee added]$40,000
7088040-EL2025-05-28Electrical8343 32ND AVE NWKitchen remodel.$20,297
7087841-EL2025-05-27Electrical1620 43RD AVE Eadd fixture, like for like as well(C3)$0
7087431-EL2025-05-22Electrical1125B 23RD AVE EChild permit for DADU.$400
7084220-EL2025-05-06Electrical625 HILLSIDE DR Eset up current permanent into temp for construction use$0
7082753-EL2025-04-28Electrical99 UNION STModification of lighting and outlet circuits.$15,000
7079182-EL2025-04-04Electrical6052 52ND AVE SEVC$0
7075727-EL2025-03-26Electrical530 BROADWAY EInside electrical room install 100 amp smart switch to unit 510 with 30 amp breaker disconnect -Run 8-4 MC cable in pre existing EV raceway 280ft to parking spot #46. -At par$3,425
7071672-EL2025-03-18Electrical1104 41ST AVE E(6) Enphase 5P (2) Enphase system controllers Backing up both legs of service 24) Silfab 440 QD Prime NTC (24) Enphase IQ8M$4,600
7075718-EL2025-03-17Electrical11015 28TH AVE NErebuild after tree strike. 3/19/25 r m, 7051053-el for SCL safety check and hot tub.$0
7071669-EL2025-02-21Electrical1104 41ST AVE EOTC Wall cover for future solar and ESS$1,000
7069947-EL2025-02-11Electrical1956 EDGEMONT PL WEVC - Geoff Derry$0
7069743-EL2025-02-10Electrical3824 EVANSTON AVE N13744 Stonewater HOA Raceway - Inside electrical room core drill 4 -1 ¼ hole into parking garage. - Install 4-1 ¼ EMT conduits. - Install J boxes on each side of the wall.$0
7069396-EL2025-02-07Electrical11923 LAKESIDE PL NEEVC - Anne Schwabel$0
7069338-EL2025-02-07Electrical2624 E OLIVE STEVC - Elie Ahovi$0
7069246-EL2025-02-06Electrical1700 17TH AVE Ereplace mast due to storm damage last week$3,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →