COMPANY RECORD · SEATTLE, WA

Apex Electrical Group LLC — permit history in Seattle, WA

Apex Electrical Group LLC appears on 30 Seattle permit records from 2022 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical30100%

Activity by year

YearPermits issued
20222
20232
20248
202510
20268

Busiest year on record: 2025, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
201 S JACKSON ST2026-07-01
325 9TH AVE2026-04-01
2700 W COMMODORE WAY2026-03-26
3919 18TH AVE W2026-03-26
2711 ALASKAN WAY2026-03-26
2225 ALASKAN WAY2026-03-26
2001 W GARFIELD ST2026-01-28
2500 LAKE WASHINGTON BLVD E2025-11-18
1007 12TH AVE S2025-11-14
25 S HORTON ST2025-10-09
7001 SEAVIEW AVE NW2025-09-19
2510 LAKE WASHINGTON BLVD E2025-09-09
5500 PHINNEY AVE N2025-08-29
2701 26TH AVE SW2025-07-07

26 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,200 to $1,400,000,000, median $19,300. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

30 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
7150602-EL2026-07-01Electrical201 S JACKSON STINSTALLING TWO NEW 400AMP PANELS. INSTALLING SIX EPO BUTTONS. INSTALLING CONDUIT AND WIRE TO SUPPORT 114 FUTURE EV CHARGES. NO CHARGERS WILL BE INSTALLED AT THIS TIME. [7/1/26 KEF $100,000
7135608-EL2026-04-01Electrical325 9TH AVEHarborview Medical Center West Hospital Fluid Cooler & Aux Cooling Upgrades [4/1/26 KEF - Plan set approved.][6/23/2026 JBC Permit Transfered to Apex Electric Group]$200,000
7135441-EL2026-03-26Electrical2700 W COMMODORE WAYInstallation of pathway only at the Maritime Industrial Building for communications cabling.
7135439-EL2026-03-26Electrical3919 18TH AVE WInstalling pathway only, in various locations at Fisherman's Terminal for communications cabling
7135421-EL2026-03-26Electrical2711 ALASKAN WAYInstalling pathway only, in various locations of Pier 69 building for communications cabling.
7135427-EL2026-03-26Electrical2225 ALASKAN WAYInstalling pathway only, in various locations of Pier 66 building for communications cabling.
7126855-EL2026-01-28Electrical2001 W GARFIELD ST
7123073-EL2026-01-16Electrical201 S JACKSON STInstalling raceway and wire to feed 41 EV Chargers. Installing (3) panels. Installing (2) transformers. Installing (1) shunt trip [1/16/26 KEF - Plan set approved.] [1-23-26 D Ran$150,000
7117152-EL2025-11-18Electrical2500 LAKE WASHINGTON BLVD EAdd (7) dedicated branch circuits to existing panelboard.$10,000
7116810-EL2025-11-14Electrical1007 12TH AVE SThey are removing the current restroom and building a new one.$10,000
7110979-EL2025-10-09Electrical25 S HORTON STReplacing cameras and associated low voltage wiring$10,000
7107657-EL2025-09-19Electrical7001 SEAVIEW AVE NWReplacing Cameras and associated low voltage wiring$15,000
7105780-EL2025-09-09Electrical2510 LAKE WASHINGTON BLVD EInstalling Service$15,000
7104289-EL2025-08-29Electrical5500 PHINNEY AVE NInstalling/repairing branch circuits for fiber and irrigation$10,000
7094779-EL2025-07-07Electrical2701 26TH AVE SWInstall underground raceway for two new services, panel for bathroom, and gate lanes. Install above ground pathway for fiber.$300,000
7086303-EL2025-05-23Electrical1959 NE PACIFIC STWall rough in for all systems except AV (power, data, FA, lighting) Lighting: wall and overhead rough in, install fixtures and lighting controls. Fire alarm wall rough in an$431,000
7077077-EL2025-04-03Electrical2608 BOYER AVE EDisconnect and reconnect of an existing system to allow for a dock rehab to take place. [04/03/25 BGO - Approved Plan Set with Comments]$130,000
7072463-EL2025-02-26Electrical2608 BOYER AVE EDisconnect and reconnect of an existing system to allow for a dock rehab to take place.$130,000
7056859-EL2024-11-18Electrical2510 LAKE WASHINGTON BLVD E400Amp Temp Service.$1,400,000,000
7051900-EL2024-10-18Electrical2525 LAKE WASHINGTON BLVD EAdding circuits to existing panel board.$15,000
7046965-EL2024-09-19Electrical909 PINE STPike and Pine Streetscape and Bicycle Improvements Project. Installing pad-mounted lighting service cabinets.$19,300
7047005-EL2024-09-19Electrical900 PIKE STPike and Pine Streetscape and Bicycle Improvements Project. Installing pat-mounted lighting service cabinets.$19,300
7046939-EL2024-09-19Electrical1127 PINE STPike and Pine Streetscape and Bicycle Improvements Project. Installing pad-mounted lighting service cabinets.$19,300
7028354-EL2024-06-03Electrical1100 OLIVE WAYReplacing outlets and connecting new cubicles to power.$10,000
7007802-EL2024-02-02Electrical1129 HIAWATHA PL SService Cabinet installation at 1900 Hiawatha Pl S$9,800
6955999-EL2024-02-01Electrical1620 S ATLANTIC ST2-1-24 BZ Plan Review Waived subject to Field Inspections Per DR. PW # 2021-058. Installation of electrical conduit, trail lighting including but not limited electrical service ca$1,365,100
6967451-EL2023-06-30Electrical6705 EAST MARGINAL WAY S- Upgrading (4) existing 100a feeders to (4) new feeders rated at 150a each. - Also, replacing (4) locations of existing panelboards and step down transformers with - (1 new ea) 4$300,000
6953092-EL2023-03-14Electrical6701 EAST MARGINAL WAY STenant Improvement. 9/28/23 r m, see also Permit 6967451-EL. [C.Kenefick 2/15/24 - permit extended until 7/1/24]$50,000
6915165-EL2022-08-04Electrical5031 UNIVERSITY WAY NETemporary Construction Trailer Power$1,200
6915167-EL2022-08-04Electrical5031 UNIVERSITY WAY NEInstallation of new electrical to support the installation of new elevator.$80,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Seattle permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →