COMPANY RECORD · BELLEVUE, WA

Re-Bath Of Seattle — permit history in Bellevue, WA

Re-Bath Of Seattle appears on 22 Bellevue permit records from 2023 through 2026, all of them plumbing.

Permit categories

CategoryPermitsShare
Plumbing22100%

Activity by year

YearPermits issued
20235
20247
20256
20264

Busiest year on record: 2024, with 7 permits. One project can account for several filings, so read this as filing activity rather than workload.

PROJECTS AHEAD SEARCH

Search every Bellevue permit, not only this company's

This page is a snapshot of Re-Bath Of Seattle. The search behind it holds more than 131,466 Bellevue permits naming a contractor, since 2015: 61,207 electrical permits, 32,396 mechanical (HVAC) permits, 19,696 plumbing permits, 13,557 building permits, 4,610 fire protection permits.

  • Search the full history by company, address, permit type or date range.
  • Set an alert and get an email when a new permit matches — the next permit Re-Bath Of Seattle files, or any new plumbing permit in Bellevue. A new permit is an early signal of work to bid on, supply or finance.
  • Export to CSV for your CRM or spreadsheet.

Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans

Where they worked

Address in sourceMost recent permit
2985 142nd Pl SE - Unit 711-B2026-04-07
5715 138th Pl SE2026-02-10
1692 118th Ave SE - Unit A-1032026-02-09
12606 SE 42nd St2026-02-02
5427 159th Pl SE2025-12-01
10430 NE 32nd Pl - Unit C-2022025-10-13
1035 156th Ave NE - Unit 16-T2025-09-02
16635 Northup Way2025-03-11
14701 NE 5th St2025-01-29
16421 SE 8th St2025-01-06
3020 168th Ave NE2024-10-30
15212 NE 8th St - Unit F-32024-08-21
2825 165th Ave SE2024-07-18
17050 Northup Way - Unit 242024-02-13

20 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Fast Water Heater Company42022–2026
Fast Water Heater Company Jeffery David Jordan42015–2026
A C Electric Service22024–2025
A&R Solar22015–2025
Brennan Heating & A/C LLC Darrin Paul Erdahl22017–2024
Jcs Construction Solutions LLC12026
Seatown Electric Htg & Airllc12025
E C Company12024

Companies that also appear in Bellevue permit records at addresses where Re-Bath Of Seattle filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

22 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
26 108272 BN2026-04-07Plumbing2985 142nd Pl SE - Unit 711-BA Single Family Condo Unit Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
26 102183 BN2026-02-10Plumbing5715 138th Pl SEA Single Family Residential Addition to Existing Structure None Project Involving (1 Shower, Tub, or Combo)
26 102060 BN2026-02-09Plumbing1692 118th Ave SE - Unit A-103A Single Family Condo Unit Alteration to Existing Structure None Project Involving (1 Shower, Tub, or Combo)
26 101727 BN2026-02-02Plumbing12606 SE 42nd StA Single Family Condo Unit Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
25 127640 BN2025-12-01Plumbing5427 159th Pl SEA Single Family Residential Alteration to Existing Structure None Project Involving (1 Bathroom Sink, 1 Shower, Tub, or Combo)
25 124673 BN2025-10-13Plumbing10430 NE 32nd Pl - Unit C-202A Single Family Condo Unit Alteration to Existing Structure None Project Involving (1 Shower, Tub, or Combo)
25 120768 BN2025-09-02Plumbing1035 156th Ave NE - Unit 16-TA Multifamily Residential Alteration to Existing Structure None Project Involving (2 Shower, Tub, or Combo)
25 106171 BN2025-03-11Plumbing16635 Northup WayA Single Family Residential Alteration to Existing Structure None Project Involving (1 Shower, Tub, or Combo)
25 102393 BN2025-01-29Plumbing14701 NE 5th StA Single Family Residential Alteration to Existing Structure None Project Involving (2 Shower, Tub, or Combo)
25 100164 BN2025-01-06Plumbing16421 SE 8th StA Single Family Residential Alteration to Existing Structure None Project Involving (1 Shower, Tub, or Combo)
24 125930 BN2024-10-30Plumbing3020 168th Ave NEA Single Family Residential Alteration to Existing Structure None Project Involving (1 Shower, Tub, or Combo)
24 119654 BN2024-08-21Plumbing15212 NE 8th St - Unit F-3A Single Family Condo Unit Repair or Replacement None Project Involving (2 Shower, Tub, or Combo)
24 117330 BN2024-07-18Plumbing2825 165th Ave SEA Single Family Residential Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
24 103577 BN2024-02-13Plumbing17050 Northup Way - Unit 24A Single Family Condo Unit Repair or Replacement None Project Involving (2 Shower, Tub, or Combo, 2 bath sink)
24 101843 BN2024-01-24Plumbing5733 122nd Ave SE - Unit 141-NA Single Family Condo Unit Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
24 100110 BN2024-01-03Plumbing14125 NE 7th Pl - Unit E-18A Single Family Condo Unit Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
24 100032 BN2024-01-02Plumbing16862 NE 14th PlA Single Family Residential Repair or Replacement None Project Involving (1 Bathroom Sink, 1 Shower, Tub, or Combo)
23 127843 BN2023-12-07Plumbing189 142nd Pl NE - Unit K-54A Single Family Condo Unit Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
23 121797 BN2023-09-26Plumbing2220 132nd Ave SE - Unit A-205A Single Family Residential Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
23 121122 BN2023-09-12Plumbing2440 140th Ave NE - Unit 29A Single Family Residential Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
23 118300 BN2023-08-24Plumbing2440 140th Ave NE - Unit 29A Single Family Residential Repair or Replacement None Project Involving (1 Shower, Tub, or Combo)
23 116845 BN2023-07-26Plumbing189 142nd Pl NE - Unit K-54A Single Family Residential Repair or Replacement None Project Involving (2 Bathroom Sink, 1 Shower, Tub, or Combo)

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Bellevue permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.