COMPANY RECORD · BELLEVUE, WA

Patriot Fire Protection Inc James E Boulanger — permit history in Bellevue, WA

Patriot Fire Protection Inc James E Boulanger appears on 807 Bellevue permit records from 2015 through 2026, all of them fire protection.

Permit categories

CategoryPermitsShare
Fire protection807100%

Activity by year

YearPermits issued
201570
201685
201790
201876
201984
202050
202156
202252
202369
202473
202568
202634

Busiest year on record: 2017, with 90 permits. One project can account for several filings, so read this as filing activity rather than workload.

PROJECTS AHEAD SEARCH

Search every Bellevue permit, not only this company's

This page is a snapshot of Patriot Fire Protection Inc James E Boulanger. The search behind it holds more than 131,466 Bellevue permits naming a contractor, since 2015: 61,207 electrical permits, 32,396 mechanical (HVAC) permits, 19,696 plumbing permits, 13,557 building permits, 4,610 fire protection permits.

  • Search the full history by company, address, permit type or date range.
  • Set an alert and get an email when a new permit matches — the next permit Patriot Fire Protection Inc James E Boulanger files, or any new fire protection permit in Bellevue. A new permit is an early signal of work to bid on, supply or finance.
  • Export to CSV for your CRM or spreadsheet.

Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans

Where they worked

Address in sourceMost recent permit
143 Bellevue Sq2026-09-16
333 108th Ave NE2026-09-15
10500 NE 8th St2026-09-09
15325 SE 30th Pl - Bldg 12026-08-11
10900 NE 4th St2026-08-05
12920 SE 38th St2026-07-29
2058 Bellevue Sq2026-07-28
10770 NE 8th St2026-07-27
2700 Bellevue Way SE2026-06-16
13191 NE Spring Blvd2026-06-11
700 110th Ave NE - Bldg Podium2026-06-03
2601 110th Ave NE2026-05-08
177 Bellevue Sq2026-04-27
10400 NE 4th St2026-04-13

297 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Nelson Electric Inc1282015–2026
Johnson Controls Fire Prttn LP792015–2025
Macdonald-Miller Fac Solns LLC Mark Webster622015–2026
Macdonald-Miller Fac Solns LLC472015–2026
Cochran Inc402015–2026
Titan Electric Inc362015–2026
G L Y Construction Inc Frank N Jr Young292015–2025
Adt LLC252015–2026

Companies that also appear in Bellevue permit records at addresses where Patriot Fire Protection Inc James E Boulanger filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

807 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
26 121504 FG2026-09-16Fire protection143 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (11 Relocated Heads, 11 Total Sprinkler Heads)
26 121474 FG2026-09-15Fire protection333 108th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (2 Total Sprinkler Heads)
26 121154 FG2026-09-09Fire protection10500 NE 8th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (23 Relocated Heads, 23 Total Sprinkler Heads)
26 118251 FG2026-08-11Fire protection15325 SE 30th Pl - Bldg 1A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (25 Total Sprinkler Heads)
26 117939 FG2026-08-05Fire protection10900 NE 4th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (5 Total Sprinkler Heads)
26 117557 FG2026-07-29Fire protection12920 SE 38th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (19 Total Sprinkler Heads)
26 117496 FG2026-07-28Fire protection2058 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (10 Total Sprinkler Heads)
26 117434 FG2026-07-27Fire protection10770 NE 8th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (4 Capped or Plugged Heads, 2 Relocated Heads, 6 Total Sprinkler Heads), 26 101173 BZ
26 115205 FG2026-07-06Fire protection10900 NE 4th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (13 Relocated Heads, 13 Total Sprinkler Heads)
26 114265 FG2026-06-16Fire protection2700 Bellevue Way SEA Nonresidential Repair or Replacement Fire Sprinkler Systems Project Involving (16 Relocated Heads, 16 Total Sprinkler Heads)
26 114058 FG2026-06-11Fire protection13191 NE Spring BlvdA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (13 Total Sprinkler Heads)
26 112430 FG2026-06-03Fire protection700 110th Ave NE - Bldg PodiumA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (3 Relocated Heads, 3 Total Sprinkler Heads)
26 111199 FG2026-05-08Fire protection2601 110th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (1125 Total Sprinkler Heads)
26 110247 FG2026-05-01Fire protection10500 NE 8th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (14 Relocated Heads, 14 Total Sprinkler Heads)
26 109978 FG2026-04-27Fire protection177 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (8 Relocated Heads, 8 Total Sprinkler Heads)
26 109863 FG2026-04-24Fire protection700 110th Ave NE - Bldg PodiumA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (5 Relocated Heads, 5 Total Sprinkler Heads)
26 108525 FG2026-04-13Fire protection10400 NE 4th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (13 Capped or Plugged Heads, 4 Relocated Heads, 17 Total Sprinkler Heads)
26 108418 FG2026-04-09Fire protection1500 116th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (1 Total Sprinkler Heads)
26 108417 FG2026-04-09Fire protection1500 116th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (2 Total Sprinkler Heads)
26 108250 FG2026-04-06Fire protection700 Bellevue Way NE - Ste 310A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (10 Total Sprinkler Heads)
26 106703 FG2026-03-26Fire protection929 108th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (4 Relocated Heads, 4 Total Sprinkler Heads)
26 106499 FG2026-03-23Fire protection192 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (13 Relocated Heads, 13 Total Sprinkler Heads)
26 106274 FG2026-03-18Fire protection15375 SE 30th Pl - Bldg 3A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (9 Total Sprinkler Heads)
26 106273 FG2026-03-18Fire protection15375 SE 30th Pl - Bldg 3A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (5 Total Sprinkler Heads)
26 106134 FG2026-03-16Fire protection3380 146th Pl SEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (1 Relocated Heads, 1 Quick Response Heads, 1 Total Sprinkler Heads)
26 102310 FG2026-02-12Fire protection2062 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (2 Total Sprinkler Heads)
26 102238 FG2026-02-11Fire protection110 110th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (9 Total Sprinkler Heads)
26 101857 FG2026-02-04Fire protection11235 SE 6th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (12 Total Sprinkler Heads)
26 101624 FG2026-01-30Fire protection1035 116th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (15 Total Sprinkler Heads)
26 101277 FG2026-01-23Fire protection777 108th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (1 Capped or Plugged Heads, 13 Relocated Heads, 14 Total Sprinkler Heads)
26 101197 FG2026-01-22Fire protection10400 NE 4th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (12 Capped or Plugged Heads, 6 Relocated Heads, 18 Total Sprinkler Heads)
26 101026 FG2026-01-19Fire protection194 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (18 Total Sprinkler Heads)
26 101018 FG2026-01-19Fire protection11130 NE 10th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (16 Total Sprinkler Heads)
26 100599 FG2026-01-09Fire protection601 108th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (14 Relocated Heads, 14 Total Sprinkler Heads)
25 129929 FG2025-12-19Fire protection10500 NE 8th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (4 Total Sprinkler Heads)
25 129470 FG2025-12-10Fire protection10400 NE 4th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (17 Total Sprinkler Heads)
25 127645 FG2025-12-01Fire protection11235 SE 6th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (12 Relocated Heads, 12 Quick Response Heads, 12 Total Sprinkler Heads), 25-122261 BZ
25 127500 FG2025-11-25Fire protection500 108th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (3 Capped or Plugged Heads, 20 Relocated Heads, 23 Total Sprinkler Heads)
25 127359 FG2025-11-21Fire protection2028 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (20 Total Sprinkler Heads)
25 126855 FG2025-11-12Fire protection1019 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (2 Relocated Heads, 2 Total Sprinkler Heads)
25 124898 FB2025-11-05Fire protection10401 NE 8th StTENANT IMPROVEMENT - ADD RELOCATE FIRE SPRINKLERS FOR T.I. WALLS AND CEILINGS. PATRIFP099CF. (38) Heads., 25 122083 BZ
25 126050 FG2025-10-28Fire protection4455 148th Ave NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (16 Total Sprinkler Heads)
25 125942 FG2025-10-27Fire protection236 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (2 Capped or Plugged Heads, 2 Total Sprinkler Heads)
25 125899 FG2025-10-24Fire protection172 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (21 Total Sprinkler Heads)
25 125123 FG2025-10-21Fire protection1083 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (14 Relocated Heads, 14 Total Sprinkler Heads)
25 125018 FG2025-10-20Fire protection3617 131st Ave SEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (2 Relocated Heads, 2 Total Sprinkler Heads)
25 125083 FG2025-10-20Fire protection500 Bellevue Way NEA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (6 Capped or Plugged Heads, 6 Total Sprinkler Heads)
25 125087 FG2025-10-20Fire protection228 Bellevue SqA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (18 Total Sprinkler Heads)
25 125072 FG2025-10-20Fire protection10425 NE 8th StA Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (18 Relocated Heads, 18 Total Sprinkler Heads)
25 121315 FB2025-10-03Fire protection700 110th Ave NE - Bldg Podiumremove existing pendent sprinklers and add upright protection to a shell condition. Rework mains so suites 162 & 163 are isolated for new smoke control zone

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Bellevue permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.