COMPANY RECORD · BELLEVUE, WA
G L Y Construction Inc Frank N Jr Young — permit history in Bellevue, WA
G L Y Construction Inc Frank N Jr Young appears on 241 Bellevue permit records from 2015 through 2025, most often general construction (83% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 200 | 83% |
| Plumbing | 30 | 12.4% |
| Mechanical / HVAC | 11 | 4.6% |
3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 27 |
| 2016 | 31 |
| 2017 | 15 |
| 2018 | 29 |
| 2019 | 14 |
| 2020 | 12 |
| 2021 | 25 |
| 2022 | 31 |
| 2023 | 18 |
| 2024 | 24 |
| 2025 | 15 |
Busiest year on record: 2016, with 31 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Bellevue permit, not only this company's
This page is a snapshot of G L Y Construction Inc Frank N Jr Young. The search behind it holds more than 131,466 Bellevue permits naming a contractor, since 2015: 61,207 electrical permits, 32,396 mechanical (HVAC) permits, 19,696 plumbing permits, 13,557 building permits, 4,610 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit G L Y Construction Inc Frank N Jr Young files, or any new building permit in Bellevue. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Where they worked
| Address in source | Most recent permit |
|---|---|
| 10500 NE 8th St | 2025-10-31 |
| 10900 NE 4th St | 2025-10-16 |
| 400 Bellevue Way NE | 2025-10-02 |
| 10506 Main St | 2025-10-02 |
| 1035 116th Ave NE | 2025-09-09 |
| 1120 Bellevue Sq | 2025-07-01 |
| 575 Bellevue Square | 2025-06-30 |
| 1288 123rd Ave NE | 2025-06-23 |
| 600 Bellevue Way NE | 2025-05-09 |
| 12355 NE District Way | 2025-03-04 |
| 10485 NE 6th St | 2025-02-10 |
| 101 106th Ave NE | 2024-12-30 |
| 1550 121st Ave NE | 2024-11-14 |
| 10400 NE 4th St | 2024-10-11 |
78 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Patriot Fire Protection Inc James E Boulanger | 29 | 2015–2025 |
| Nelson Electric Inc | 22 | 2015–2026 |
| E C Company | 15 | 2015–2026 |
| Cochran Inc | 14 | 2015–2025 |
| Macdonald-Miller Fac Solns LLC Mark Webster | 13 | 2015–2025 |
| Johnson Controls Fire Prttn LP | 13 | 2015–2025 |
| Prime Electric LLC | 12 | 2018–2026 |
| Titan Electric Inc | 10 | 2015–2025 |
Companies that also appear in Bellevue permit records at addresses where G L Y Construction Inc Frank N Jr Young filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
241 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| 25 124228 BZ | 2025-10-31 | General construction | 10500 NE 8th St | Construction of new electrical closet to house replacement ATS unit serving building. Approximately 500 square feet of affected area. | |
| 25 118968 BZ | 2025-10-16 | General construction | 10900 NE 4th St | This set of documents is for the construction of commercial tenant improvements on the 11th level of an existing high-rise building including non-structural partitions, interior fi | |
| 25 116307 BZ | 2025-10-02 | General construction | 400 Bellevue Way NE | Demolishing a portion of the mezzanine slab and reinstalling the structural supports per the attached structural drawings. | |
| 25 107616 BY | 2025-10-02 | General construction | 10506 Main St | Warm shell build-out of lease space (994sf gross) for a future home goods retail tenant at the level 1 southwest corner of the phase 1 tower at West Main / Bellevue Plaza. Work in | |
| 25 118971 BZ | 2025-09-18 | General construction | 10900 NE 4th St | This set of documents is for the installation of modular furniture telephone booths on the eleventh floor of an existing high-rise. The accessory electrical and fire protection sco | |
| 25 111749 BZ | 2025-09-09 | General construction | 1035 116th Ave NE | 1,350 square foot remodel to replace linear accelerator equipment like for like. Minor modifications to casework, finishes, ceiling and light fixture replacement included., N/A | |
| 24 126628 BZ | 2025-07-01 | General construction | 1120 Bellevue Sq | Demolition of existing demising wall and construction of new demising wall in vacant retail suite. Modifications to existing bulkhead, and relocation of lighting as necessary. | |
| 24 111755 BW | 2025-06-30 | General construction | 575 Bellevue Square | Installation of Retaining Wall / Vehicle Barrier greater than 4ft Tall to support new stair and upgraded sidewalk., 23-118448 GD | |
| 24 104521 BZ | 2025-06-23 | General construction | 575 Bellevue Square | Installation of final Cooling Tower Cell into existing Mechanical Plant and Condenser Water Distribution., 23 105353 DC | |
| 25 111072 BZ | 2025-06-23 | General construction | 1288 123rd Ave NE | INSTALLATION OF 1-PERSON, 2-PERSON AND 4-PERSON PHONE BOOTHS THROUGHOUT FLOORS 2-10. MINOR POWER ADDITIONS AND CODE-REQUIRED UPDATES TO LIFE AND SAFETY SYSTEMS. | |
| 25 110606 BZ | 2025-05-09 | General construction | 600 Bellevue Way NE | A water leak on level 17 caused damage to rated trash chute shaft walls. Repair work consists of select GWB demo for moisture mitigation and like for like finish replacement. | |
| 25 106418 BZ | 2025-04-08 | General construction | 1035 116th Ave NE | Replaces Medical Equipment in (2) Cardiac Cath Labs, associated Control Rooms & Equipment Closets on the first floor of Overlake Medical Center. | |
| 25 103610 BZ | 2025-03-04 | General construction | 12355 NE District Way | TENANT IMPROVEMENT OF EXISTING OFFICE SPACE ON LEVELS 03 TO 10. WORK IS LIMITED TO INSTALLATION OF NEW PREMANUFACTURED PHONE BOOTHS. WORK DOES NOT ALTER EXISTING OCCUPANCY OR EGRE | |
| 25 102041 BZ | 2025-02-13 | General construction | 1035 116th Ave NE | Replacement of CT equipment, new finishes, doors, casework, ceiling and lighting., N/A | |
| 24 126442 BZ | 2025-02-10 | General construction | 10485 NE 6th St | Repair damaged trash chute. Add rated access panels to trash chute shaft for access to repairs and future use. | |
| 24 129081 BZ | 2024-12-30 | General construction | 101 106th Ave NE | INSTALLATION OF SECURITY GATE IN EGRESS STAIR IN AN EXISTING BUILDING, 21-122384BY 19-123937BB | |
| 24 123999 BZ | 2024-12-06 | General construction | 10900 NE 4th St | This set of documents is for the construction of commercial tenant improvements including non-structural partition, interior finishes, millwork, ceilings, and door, frames and hard | |
| 24 125616 BZ | 2024-11-14 | General construction | 1550 121st Ave NE | Installation of 2-person and 4-person phone booths throughout floors 2-5. Minor power additions and code-required updates to life and safety systems., N/A | |
| 24 125527 BZ | 2024-11-14 | General construction | 1288 123rd Ave NE | Installation of 1-person, 2-person and 4-person phone booths throughout floors 2-10. Minor power additions and code-required updates to life and safety systems. | |
| 24 123139 BZ | 2024-11-14 | General construction | 12355 NE District Way | Installation of 1-person phone booths and 4-pereson pods throughout floors 3-8. Minor power additions and code-required updates to life and safety systems., N/A | |
| 24 122582 BZ | 2024-11-12 | General construction | 575 Bellevue Square | The scope of work primarily involves adding security panels and two additional roll-up doors to secure vehicular and pedestrian entries. Landuse Exemption has been approved., 24-1 | |
| 24 125412 BZ | 2024-11-07 | General construction | 1035 116th Ave NE | Install new CT equipment. Work limited to patch and repair of exist walls for new electrical requirements, new flooring, ceiling, lighting and GRDs., N/A | |
| 24 120288 BZ | 2024-10-22 | General construction | 1035 116th Ave NE | THIS PROJECT INCLUDES THE INSTALLATION OF A NEW ACOUSTICAL CEILING PANEL SYSTEM AND LIGHT FIXTURES INTO AN EXISTING 770 SF ROOM ON LEVEL P1 OF BUILDING 04- SOUTH TOWER, 18 116015 | |
| 24 119308 BZ | 2024-10-11 | General construction | 10400 NE 4th St | Interior non-structural tenant improvement for Parker Smith & Feek office. Scope of work includes minor demolition, new partitions, casework, doors, lighting and finishes. | |
| 24 119628 BZ | 2024-09-20 | General construction | 10401 NE 8th St | New flooring, lighting, wall finishes, plumbing fixtures, and accessories. Utilizing existing rough in remaining from prior demolition., N/A | |
| 24 112217 BZ | 2024-09-13 | General construction | 1135 116th Ave NE | Expansion of Fred Hutchinson Research Lab on the second floor of Overlake Medical Center. Scope of work includes demolition of non-structural partitions for a revised layout, new c | |
| 24 118658 BZ | 2024-08-26 | General construction | 10401 NE 8th St | There was a water leak from a backflow preventer on level 12, flooding the floors below for levels 12, 11, 10, 9, 8. Repair work consists of GWB selective demo for moisture mitigat | |
| 24 113754 BZ | 2024-07-18 | General construction | 575 Bellevue Square | Demolition of existing vanity counters, sinks, and plumbing fixtures and replacing with new. Demolition of existing finishes. Demolition of existing mirrors and scones. Limited cei | |
| 24 106790 BZ | 2024-06-13 | General construction | 10400 NE 4th St | Interior non-structural alterations on Floor 10 of Lincoln Square Expansion. Unity currently occupies Floors 9 and 10 - they are vacating the entirety of floor 9 and reducing thei | |
| 24 103952 BZ | 2024-04-01 | General construction | 619 156th Ave SE | Repair the existing wall framing, gypsum wall board, and finished to repair damages caused by car strike., 24 103466 BE | |
| 24 103537 BZ | 2024-02-29 | General construction | 1035 116th Ave NE | 500 SF Tenant Improvement - Install patient lift in MRI Suite; Replace (2) doors with new doors & hardware and modify exit signs in order to relocate the exit access route from the | |
| 24 103621 BZ | 2024-02-26 | General construction | 575 Bellevue Sq - Ste 105A | Construction of new walls, doors, lighting and power., N/A | |
| 23 128578 BZ | 2024-02-16 | General construction | 85 106th Ave NE | Modifications to convert conference rooms to Storage rooms., 22 114104 BY | |
| 24 102047 BZ | 2024-02-02 | General construction | 1135 116th Ave NE | Relocation of existing blood draw room on second floor of Overlake Medical Center. Scope of work includes new electrical outlets, lighting and finishes. No structural work is being | |
| 24 101052 BZ | 2024-02-02 | General construction | 10401 NE 8th St | Interior only, non-structural tenant improvement including construction of new walls, doors, ceilings, casework, finishes, and lighting. | |
| 23 128703 BZ | 2024-02-01 | General construction | 10400 NE 4th St | INTERIOR TENANT IMPROVEMENT, DEMO OF WALLS AND DOORS. NEW WALLS AND DOORS, MINOR CEILING MODIFICATIONS PER NEW LAYOUT., 16-142055 | |
| 24 100103 BZ | 2024-01-29 | General construction | 10401 NE 8th St | SCOPE OF PROJECT INCLUDES: COMMON CORRIDOR: Replacement of existing ceilings and light fixtures and installation of new finishes. ELEVATOR LOBBY: Replace flooring and wall | |
| 23 128493 BZ | 2024-01-08 | General construction | 1035 116th Ave NE | Installation of Acoustical Ceiling panel system and lights in existing 75 sf room on Level B of Building 01, 18 116015 | |
| 23 123759 BZ | 2024-01-02 | General construction | 575 Bellevue Square | Install two rolling security doors at the Macy's Fountain Court Entry on Bellevue Way. The new rolling doors will be on the exterior of the building., 23_118375 LJ | |
| 23 121961 BZ | 2023-12-27 | General construction | 700 Bellevue Way NE - Unit podium | INSTALL EQUIPMENT SCREENS INTENDED TO CONCEAL HVAC UNITS AT THE SOUTH EAST ROOF OF LEVEL5. 1. CUT AND REMOVE ROOFING AS NEEDED TO INSTALL ROOF SCREEN SUPPORT COLUMNS AS SHOWN. 2. | |
| 23 121433 BZ | 2023-12-12 | General construction | 900 Bellevue Way NE | Adding structural reinforcement to underside of level P4 deck. | |
| 23 117332 BW | 2023-12-11 | General construction | 503 Bellevue Sq | EXTERIOR IMPROVEMENT TO PARTIALLY DEMOLISH EXISTING PLANTER AND SIDEWALK TO PROVIDE NEW CONCRETE PAD WITH RAILING FOR ADJACENT QUICK SERVICE RESTAURANT WALK-UP WINDOW AND PROVIDE R | |
| 23 125950 BZ | 2023-12-08 | General construction | 10400 NE 4th St | TI of existing office space on 30th Floor. The work includes selective addition of new sprinklered phone booths and minor related construction of soffits / partitions., 23 105019 B | |
| 23 121610 BZ | 2023-10-17 | General construction | 10900 NE 4th St | This set of documents is for the construction of commercial tenant improvements including non-structural partitions, interior finishes, millwork, ceilings, and door, frames, hardwa | |
| 23 101180 BZ | 2023-10-16 | General construction | 575 Bellevue Sq - Ste 105A | Work Covered by this application: Egress upgrades and modifications to the existing Mall path of travel, rated partitions, and provisions for future roof top equipment., 19 130713 | |
| 23 121129 BZ | 2023-10-04 | General construction | 700 Bellevue Way NE - Unit podium | REPLACE EXISTING DAMAGE INTERIOR PARTITIONS WITHIN TUNNEL WITH NEW HEAVY-DUTY CONSTRUCTION, 07-107410BM | |
| 23 102387 BZ | 2023-09-01 | General construction | 1790 124th Ave NE | This project will make non-structural improvements to existing spaces in the operations dispatch area, resulting in three offices and a storage closet. | |
| 23 109787 BZ | 2023-06-29 | General construction | 900 Bellevue Way NE | Waterproofing upgrades to roof plaza- currently leaking into spaces below. Scope: Demo of exist topping slab and filler insulation. Install waterproofing and reinstall insulation a | |
| 23 108900 BZ | 2023-05-15 | General construction | 172 Bellevue Sq | Selective demolition of interior walls, doors, and minor modifications to lighting. Construction of a new demising wall to divided existing suite into two smaller suites for futur | |
| 23 108903 BZ | 2023-05-15 | General construction | 168 Bellevue Sq | Selective demolition of interior walls, doors, and minor modifications to lighting and ceilings. Construction of a new demising wall to divided existing suite into two smaller sui |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Bellevue permit records through 2025, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
