COMPANY RECORD · PHILADELPHIA, PA

Seville Theresa D & Robert — permit history in Philadelphia, PA

Seville Theresa D & Robert appears on 131 Philadelphia permit records from 2021 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical131100%

Activity by year

YearPermits issued
202120
202221
202322
202423
202532
202613

Busiest year on record: 2025, with 32 permits. One project can account for several filings, so read this as filing activity rather than workload.

PROJECTS AHEAD SEARCH

Search every Philadelphia permit, not only this company's

This page is a snapshot of Seville Theresa D & Robert. The search behind it holds more than 242,223 Philadelphia permits naming a contractor, since 2021: 82,008 plumbing permits, 51,127 electrical permits, 25,710 mechanical permits, 25,367 residential building permits, 24,512 zoning permits.

  • Search the full history by company, address, permit type or date range.
  • Set an alert and get an email when a new permit matches — the next permit Seville Theresa D & Robert files, or any new electrical permit in Philadelphia. A new permit is an early signal of work to bid on, supply or finance.
  • Export to CSV for your CRM or spreadsheet.

Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans

Names on the same project timelines

Name in sourceLinked permitsLast seen
Spring Garden Construction Co Inc122025-07-28
Ernest Bock & Sons, Inc.102024-08-26
Target Bldg Constructn Inc92026-06-25
Florkowski Builders Inc82026-05-05
Commercial Construction Inc62025-05-12
Canuso Jorden Inc52022-05-03
Erickson C & Sons Inc52024-06-10
Sj Thomas Company Inc32024-07-11
Builders Group Inc22023-08-30
P Agnes Inc22025-11-20
Colleen Harter22023-12-08
Dupuy Construction Services Inc12025-06-17

23 named participants share a resolved project timeline with Seville Theresa D & Robert. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
10800 KNIGHTS RD2026-09-28
1001-41 WALNUT ST2026-09-09
1234 MARKET ST2026-09-09
1000-32 CHESTNUT ST2026-09-03
800-34 WALNUT ST2026-07-27
4001 GRANT AVE2026-06-25
133-49 N 15TH ST2026-06-10
130-40 N BROAD ST2026-05-05
4900-40 FRANKFORD AVE2026-02-10
900-10 WALNUT ST2025-12-23
1650 MARKET ST2025-12-10
1000-28 WALNUT ST2025-09-30
1101 CHESTNUT ST2025-08-19
2036-42 CHESTNUT ST2025-08-19

44 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Herman Goldner Co Inc72021–2026
Oliver Sprinkler Co., Inc.72021–2026
Independence Fire Sprinkler Company62021–2026
Oreilly Edward B & Assoc Inc62021–2026
A & S Sprinkler Co Inc52021–2026
Elc Holding Company52022–2026
Pmc Mechanical Enterprise, LLC42021–2026
Target Bldg Constructn Inc42022–2026

Companies that also appear in Philadelphia permit records at addresses where Seville Theresa D & Robert filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

131 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
EP-2026-0082312026-09-28Electrical10800 KNIGHTS RDInstall 2 Vapor Tight Lights 1 GFI Receptacle - 2 New Fixtures - Wiring for SSHP-1 & HP-1 - New disconnect and new breaker work per approved plans No fire alarm on this permit.
EP-2026-0072612026-09-09Electrical1001-41 WALNUT STReplace lighting in kind with new LED lights. Install new duplex receptacles. All work per approved plans
EP-2026-0082292026-09-09Electrical1234 MARKET STDemo Elevator Equipment - Install New Shunt Trip Disconnects - Wiring from Panels to Elevator Equipment - Wire 23 Lighting Fixtures - Install Conduit and Wire for Card Readers and
EP-2026-0044322026-09-03Electrical1000-32 CHESTNUT STElectrical wiring of the sanitation area all work per approved plans
EP-2026-0055722026-07-27Electrical800-34 WALNUT STInstall 109 Receptacles, 90 Fixtures, 18 Emergency Lights, 3 power panels and 45KVA Transformer, Fire Alarm Panel, 13 Smokes, 4 Pull Stations, 10 Speaker Strobes and 4 Nurse Call D
EP-2026-0058442026-06-25Electrical4001 GRANT AVEDemo existing Devices and Reinstall, Install 3 Light Fixtures and GFI Receptacle
EP-2026-0040482026-06-10Electrical133-49 N 15TH STInstall 4 Speaker/ Strobes & 2 Strobes Only. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
EP-2026-0018282026-05-05Electrical130-40 N BROAD STInstall light Fixtures - Exit lights - Emergency lights 1 GFI & 1 Switch All work per approved plans, NEC 2017 ***NO Fire alarm on this Permit****
EP-2025-0119602026-04-22Electrical1001-41 WALNUT STInstall receptacles, Fixtures, and raceways. PER APPROVED PLANS NEC2017 ***NO FIRE ALARM ON THIS PERMIT.***
EP-2026-0012152026-04-15Electrical1234 MARKET STNew 400-amp 277/480 Panel - Install VFD's for Chillers 1- 7, Spray Pumps 1 & 2, CWP 1&2 & Pump # 7 - Dedicated Circuit and Receptacles with Heat Trace Cabling as per 2017 NEC.
EP-2026-0012492026-03-05Electrical1001-41 WALNUT STFurnish and install a complete fire alarm system, including installation of forty-seven (47) smoke detectors, three (3) duct smoke detectors, forty-one (41) speaker/strobe notifica
EP-2025-0095202026-02-10Electrical4900-40 FRANKFORD AVEInstall 56 duct Detectors - 308 Smoke Detectors - 10 Heat Detectors - 108 Ceiling Strobes - 325 Speaker / Strobes - 11 Wall Strobes - 321 Ceiling Speakers. ALL WORK TO BE DONE AC
EP-2026-0004792026-01-31Electrical1001-41 WALNUT STInstall 2 Door Holder and 1 Relay Module. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
EP-2025-0116842025-12-24Electrical10800 KNIGHTS RDInstall 6 2x2's - 8 High Hats - 1 Under counter light - 4 switches - 8 Receptacles - 150-amp Circuit Breaker . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
EP-2025-0095132025-12-23Electrical900-10 WALNUT STInstall 34 Receptacles - 125 Amp Shunt Trip C B and Enclosure - 150-amp 4 Pole Transfer Switch - Panel EMDP-B & DPP-3 - 2 Mechanical Units .ALL WORK IS TO BE DONE ACCORDING TO AP
EP-2025-0116852025-12-23Electrical1001-41 WALNUT STInstall 1 receptacle outlet for each of the 4 bed lifts and 1 receptacle outlet for the automatic door opener. All work to be done according to the 2017 NEC and per approved plan
EP-2025-0106932025-12-10Electrical1650 MARKET STRework Chillers #1, 2 & 4 with Conduit and Wire - Rework Pumps 8, 9 & 10 with Conduit and Wire - Control Conduit and Wiring for the Same Units - Disconnect and Reconnect EF-4 .ALL
EP-2025-0111622025-12-05Electrical1001-41 WALNUT STInstall 2 Speaker / Strobes - 2 Strobes & Power Supply. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER APPROVED PLANS.
EP-2025-0106502025-11-20Electrical1001-41 WALNUT STInstall 26 Receptacles - 33 Emergency Outlets - 2 UPS GFI Rec's - Panel RP5TC - 1 Exit - 37 Fixtures - Conduit work for Equipment as per 2017 NEC.
EP-2025-0106422025-11-15Electrical1001-41 WALNUT STInstall 4 Pull Stations - 8 Duct Detectors - 4 Smokes - 13 Strobes & 11 Speaker/ Strobes as per 2016 NFPA 72.
EP-2025-0088662025-09-30Electrical1000-28 WALNUT STDemo Power for Elevators 1,2,3, 4 &5 - Install New Panel P1A and Transformer - Wiring of Sump Pumps and Vapor Light Fixtures- 5 New Disconnects with Relays - Wiring of AHU-1,2,3 &
EP-2025-0075582025-08-21Electrical1001-41 WALNUT STInstall 108 Fixtures - 5 Exits - 101 Normal Receptacles - 49 Critical Care Receptacles - Raceways and Junction Boxes - 2 Electrical panels with 3 pole 100 amp Breakers in existing
EP-2025-0069832025-08-19Electrical1101 CHESTNUT STInstall 1 Speaker / Strobe , 1 Relocate speaker/strobe, 1 strobe .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
EP-2025-0070762025-08-19Electrical2036-42 CHESTNUT STINSTALL 60 AMP SUBPANEL AND METER SOCKET. INSTALL 4 LED LIGHTING FOR PARKING LOT. INSTALL TWO DEDICATED CIRCUITS, ONE FOR THE SIGN AND ONE FOR THE PAY KIOSK. ALL WORK TO BE D
EP-2025-0064852025-07-28Electrical1234 MARKET STInstall 43 Receptacles, 2 Floor Boxes, 20 Furniture Feeds and Clean and Relamp. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC **NO FIRE ALARM ON THIS PERMIT**
EP-2025-0063862025-07-24Electrical508-32 WALNUT STINSTALL WIRING AND 2 CEILING MOUNTED SPEAKER/STROBES ON THE 17th FLOOR. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
EP-2025-0066002025-07-21Electrical1513-41 RACE STInstall 16 Speaker Strobes & 12 Strobes as per 2016 NFPA 72.
EP-2025-0062322025-07-17Electrical508-32 WALNUT STInstall 2 Ceiling Fire Alarm Speaker/Strobes . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
EP-2025-0041002025-07-14Electrical3201 RYAN AVEInterior electrical alteration of (7) existing classrooms and new woodshop area. Work to include modifications to existing lighting and will include new light fixtures, power, tele
EP-2025-0057532025-07-02Electrical508-32 WALNUT STINSTALL WIRING, LIGHTING, EMERGENCY LIGHTING, EXIT SIGNS AND RECEPTACLE OUTLETS. INSTALL 8 DEDICATED BRANCH CIRCUITS FOR THE GLASS FILMS. ALL WORK TO BE DONE ACCORDING TO THE 2
EP-2025-0056622025-06-25Electrical508-32 WALNUT STInstall 5 Linear Lights, 6 Cord Reels in Ceiling, 2 Duplex Outlets, 1 Data Raceway and 1 Card reader Raceway . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEP
EP-2025-0042382025-06-19Electrical508-32 WALNUT STInstall 6 Wall Strobes, 3 Wall Speakers, 8 ceiling-mounted speaker/strobes, 2 12V battery, and 1 6.5 amp booster power supply as per 2016 NFPA 72.
EP-2025-0051662025-06-17Electrical1101 CHESTNUT STInstall 10 Quads - 17 Duplex's - 10 Power Poles - 7 EUH - 37 K fixtures - 26 2x2's 6 Exits - Switching - ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE
EP-2025-0034652025-06-10Electrical10800 KNIGHTS RDInstall (2) smoke detectors, (1) strobe, and (1) speaker/strobe. Relocate (1) smoke detector as per 2016 NFPA 72.
EP-2025-0042352025-06-08Electrical3464 W SCHOOL HOUSE LNRenovating Ronson Hall Bathrooms - 175 Fixtures - 60 Receptacles 7 Exhaust Fans - 3 60-amp panels - Motor Starter ,fire alarm. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWING
EP-2025-0036052025-06-05Electrical2680 SOUTHAMPTON RDINSTALL FIRE ALARM SYSTEM ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS
EP-2025-0039152025-06-01Electrical1513-41 RACE STInstall lighting, receptacles, exit/emergency lighting, and power to equipment as per 2017 NEC. ***NOT APPROVED FOR THE INSTALLATION OF FIRE ALARM***
EP-2025-0008382025-05-28Electrical1000-28 WALNUT STPhase One: Install Fire Alarm JCI Equipment for TJU Bluemle Bldg. 3 Power supply's - 4 Distribution Modules - ES - XPS Power Supplies - Expansion Bays as per 2016 NFPA 72.
EP-2025-0036452025-05-12Electrical508-32 WALNUT STInstall 32 Receptacles - 5 Furniture Poke Thurs - 21 Data Boxes - Hot Water Heater New Lights and Switching . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. ** SEP
EP-2025-0014552025-05-06Electrical1001-41 WALNUT STInstall 219 Receptacles - 81 Emergency Rec's - 30 Junction Boxes - 30 Head Walls with Emergency and 1 Normal Outlets - 1213 Fixtures - AHU -3 - 2 Return Fans - 3 GEP and 1 Exhaust
EP-2025-0029932025-04-11Electrical10800 KNIGHTS RDInstall 26 Fixtures - 3 Dimmers - 29 Receptacles - 1 ACC - 1 Crac Unit - Raceways Dedicated Outlet - 2 Shut Trip Buttons - Nurse Call Pull and Dome .ALL WORK IS TO BE DONE ACCORDIN
EP-2025-0008212025-03-27Electrical2680 SOUTHAMPTON RDInstall the Following: 423 Fixtures - 252 Receptacles - 17 Heaters - 2 Hot Water Pumps - 57 Data boxes - 28 VRF- 2 DISTRIBUTION PANELS (SEPARATE FIELD EVALUATION ,BY AN APPROVED FI
EP-2025-0008342025-02-13Electrical2301 S BROAD STINSTALL POWER TO NEW RECEPTACLE OUTLETS FOR SERVING NINE PLUG IN NURSE'S CALL PANELS ACCORDING TO THE 2017 NEC AND PER PLANS.
EP-2025-0008322025-02-04Electrical1000-28 WALNUT STPROVIDE 120V POWER & QUAD RECEPTACLES FOR THE NEW NURSE CALL EQUIPMENT. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
EP-2025-0001262025-01-29Electrical508-32 WALNUT STINSTALL STROBES, PULL STATIONS SPEAKERS AND POWER SUPPLY ACCORDING TO THE 2017 NEC AMENDMENT: THE SCOPE OF WORK IS FOR THE 8th FLOOR
EP-2024-0105922024-11-20Electrical4900-40 FRANKFORD AVEInstall 2 Receptacles - 1 1/2 Conduit for Machine - Wall Duct as per 2017 NEC.
EP-2024-0106012024-11-13Electrical508-32 WALNUT STINSTALL A 100 AMP PANEL & FEEDER. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES & SENSORS. INSTALL RECEPTACLES, FLOOR OUTLETS & FURNITURE FEEDS. PROVIDE POWER FOR THE MECHANICAL & HV
EP-2024-0068302024-10-25Electrical5401 WARRINGTON AVERetrofit 62 Light Fixtures - Replace 12 Sconces - Replace 12 Exits .all work is to be done according to approved drawings-2017 NEC.
EP-2024-0094242024-10-23Electrical1000-28 WALNUT STInstall a Dedicated Circuit for the Nurse Call Panel -2017 NEC.
EP-2024-0077212024-10-03Electrical9501 E ROOSEVELT BLVDInstall (4) Light Fixtures - (5) Receptacles - (1) GFCI - 1 CP-B - CP-1 as per 2017 NEC.

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.