COMPANY RECORD · PHILADELPHIA, PA

Pmc Mechanical Enterprise, LLC — permit history in Philadelphia, PA

Pmc Mechanical Enterprise, LLC appears on 70 Philadelphia permit records from 2023 through 2026, most often plumbing (55.7% of the record).

Permit categories

CategoryPermitsShare
Plumbing3955.7%
Mechanical3144.3%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202317
202419
202523
202611

Busiest year on record: 2025, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
Lorenzon Bros Co172026-06-12
Target Bldg Constructn Inc72026-07-07
Intech Construction LLC62026-07-07
Massimino Building Corp52025-10-24
Ernest Bock & Sons, Inc.52025-05-22
Wolfe Scott Associates, Inc52025-06-30
P Agnes Inc42025-10-29
Flatiron Building Company42026-07-06
Florkowski Builders Inc22023-06-13
Mcdonald Building Co LLC22023-05-18
Bsi Construction LLC12024-05-28
Dupuy Construction Services Inc12026-02-17

13 named participants share a resolved project timeline with Pmc Mechanical Enterprise, LLC. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
5501-19 CHESTNUT ST2026-09-18
819-41 CHESTNUT ST2026-08-25
4182-90 CITY AVE2026-07-07
4001 GRANT AVE2026-07-07
3600-90 WALNUT ST2026-07-06
3300 CHESTNUT ST2026-06-12
3726-34 WALNUT ST2026-06-02
7500 CENTRAL AVE2026-04-01
100 E LEHIGH AVE2026-02-17
220-60 S 33RD ST2025-11-17
4000 LOCUST ST2025-10-29
3200 WALNUT ST2025-10-24
508-32 WALNUT ST2025-09-03
501 OSLER CIR2025-07-29

36 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Oliver Sprinkler Co., Inc.132021–2026
Hatzel & Buehler Inc82021–2026
Independence Fire Sprinkler Company72021–2026
Palman Electric Inc62021–2026
Flatiron Building Company62021–2026
Lorenzon Bros Co52021–2026
Elc Holding Company52021–2026
Dwd Mechanical Contractor Inc52022–2026

Companies that also appear in Philadelphia permit records at addresses where Pmc Mechanical Enterprise, LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

70 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
PP-2026-0115762026-09-18Plumbing5501-19 CHESTNUT STALTERATIONS TO EXISTING OFFICE BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VE
MP-2026-0042712026-08-25Mechanical819-41 CHESTNUT STFOR A MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE A PORTION OF THE 3RD FLOOR OF AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS.
PP-2026-0091862026-07-07Plumbing4182-90 CITY AVEFor minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ S
MP-2026-0037092026-07-07Mechanical4001 GRANT AVEFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE D
MP-2026-0032612026-07-06Mechanical3600-90 WALNUT STFOR THE INSTALLATION OF AN APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. I
PP-2026-0085762026-07-01Plumbing4001 GRANT AVEALTERATIONS TO INCLUDE (1) FLOOR DRAIN, (4) TOILETS, (2) LAV SINKS AND ASSOCIATED PIPING AS PER APPROVED PLANS
PP-2026-0071382026-06-12Plumbing3300 CHESTNUT STINSTALLATION OF (2) GREASE INTERCEPTORS AS PER APPROVED PLANS
PP-2026-0050132026-06-02Plumbing3726-34 WALNUT STALTERATIONS AND FIXTURE RREPLACMENT. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC. ALL WORK TO BE INSTALLED
MP-2026-0021802026-04-30Mechanical3726-34 WALNUT STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK
PP-2026-0012492026-04-01Plumbing7500 CENTRAL AVEALTERATIONS TO EXISTING OFFICE SPACE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTI
MP-2026-0005982026-02-17Mechanical100 E LEHIGH AVEALTERATIONS TO HVAC SYSTEM ON THE FIRST FLOOR OF AN EXISTING HOSPITAL FACILITY (CENTENNIAL BUILDING) AS PER APPROVED PLANS. *2018 IMC REVIEW*
MP-2025-0054782025-11-17Mechanical220-60 S 33RD STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO B
PP-2025-0139492025-11-07Plumbing220-60 S 33RD STINSTALL (2) LAB SINKS AND (2) INDIRECT WASTE/HUB DRAINS
MP-2025-0054532025-10-29Mechanical4000 LOCUST STFOR THE REPLACEMENT OF REGISTERS AND DIFFUSERS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PE
MP-2025-0052182025-10-24Mechanical3200 WALNUT STFOR THE INSTALLATION OF (5) SNORKELS, (3) GAS CABINETS, (3) FUME HOODS S WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL
PP-2025-0138762025-10-24Plumbing4000 LOCUST STFIXTURE REPLACEMENT CONSISTING OF (4) LAVS, (3) WATER CLOSETS, (1) URINAL. **WITHOUT PIPING**
PP-2025-0133222025-10-24Plumbing3200 WALNUT STINSTALLATION OF 6 NEW CUP SINKS AND ALL ASSOCIATED PIPING IN ACCORDANCE WITH 2018 PPC AND EZ STANDARD.
PP-2025-0131902025-10-23Plumbing220-60 S 33RD STINSTALLATION OF A NEW SUMP PUMP & PIPING FOR A NEW ELEVATOR SHAFT AS PER APPROVED PLANS
MP-2025-0051872025-10-20Mechanical220-60 S 33RD STFOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED PIPING. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF F
PP-2025-0113242025-09-03Plumbing508-32 WALNUT STREPLACEMENT OF (1) KITCHENETTE SINK ON THE MEZZANINE FLOOR AND INSTALLING (1) NEW SINK ON THE FITH FLOOR WITH NEW DRAIN, VEBT, AND WATER LINES
PP-2025-0088562025-07-29Plumbing501 OSLER CIRINSTALL LAB SINK ACCORDING TO THE 2018 PPC AND PER PLANS.
MP-2025-0036712025-07-23Mechanical501 OSLER CIRFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS P
MP-2025-0032502025-06-30Mechanical419-23 S 6TH STFOR AN ALTERATION TO AN EXISTING MECHANICAL SYSTEM. **WORK TO BE COMPLETED PER APPROVED PLANS** MECHANICAL WORK ONLY**
PP-2025-0076602025-06-23Plumbing419-23 S 6TH STALTERATIONS AS PER APPROVED PLANS TO INCLUDE (6) LAV SINKS, (7) TOILETS, (1) MOP SINK, AND (3) FLOOR DRAINS
MP-2025-0029042025-06-04Mechanical3200 WALNUT STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE D
PP-2025-0071802025-06-03Plumbing3200 WALNUT STALTERATIONS TO INCLUDE A NEW LAB SINK AND FUME HOOD CUP SINK ON LEVEL "0"; AND FOUR FUME HOOD CUP SINK ON LEVEL "5"
PP-2025-0023072025-05-22Plumbing9801 FRANKFORD AVEINSTALL TWO INCH WATER SERVICE, 1 BUILDING DRAIN, 1 CURB TRAP, 1 FAI, 2 BOTTLE FILLER, 2 FLOOR SINKS, 2 SINKS, 2 WASHING MACHINE BOXES, 2 MOP SINKS, 9 LAVATORIES, 8 FLOOR DRAINS, 9
MP-2025-0021152025-04-24Mechanical3700-34 WALNUT STFOR THE INSTALLATION OF NEW DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS.
MP-2025-0013472025-04-11Mechanical3501 SPRUCE STFOR A MECHANICAL SYSTEM INSTALLATION. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS V
PP-2025-0047382025-04-10Plumbing3700-34 WALNUT STINSTALL FIXTURES LIKE FOR LIKE. FIXTURE REPLACEMENT WITHOUT PIPING PER 2018 PPC
PP-2025-0027412025-03-13Plumbing3501 SPRUCE STinstallation of drainage, waste, vent, and water supply to 12 fixtures per renovations to ground floor toilet rooms. all work performed in compliance with 2018 PPC AND APPROVED PLA
MP-2025-0011452025-03-06Mechanical9801 FRANKFORD AVEFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO
PP-2024-0173842025-02-05Plumbing3737 MARKET STINSTALL 1 FLOOR DRAIN, 8 LAVATORIES AND 1 MOP SINK ACCORDING TO THE 2018 PPC AND PER PLANS.
MP-2024-0060142025-01-13Mechanical3737 MARKET STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO
MP-2024-0048992024-12-19Mechanical3600 PINE STFOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
PP-2024-0144592024-10-31Plumbing3600 PINE STALTERATION OF OFFICE AND LAB SPACE TO CONVERT INTO SPACE FOR HOUSEKEEPING DEPT AS APPROVED DRAWINGS TO INCLUDE A NEW TOILET, LAV SINK, KIT SINK, DRINKING FOUNTAIN, AND FLOOR DRAIN.
PP-2024-0098352024-09-10Plumbing3200 WALNUT STALTERATIONS AS PER APPROVED PLANS TO INCLUDE (1) GREASE TRAP, (1) BOTTLE FILLER, (3) INDIRECT DRAINS, (1) 3 COMP SINK, (1) HAND SINK, (1) FLOOR DRAIN 8 FIXTURES
MP-2024-0032152024-07-22Mechanical3200 WALNUT STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE D
MP-2024-0026672024-07-08Mechanical3201-59 WALNUT STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED
PP-2024-0061012024-06-14Plumbing10800 KNIGHTS RD ALTERATIONS TO PLUMBING AS PER APPROVED DRAWINGS TO INCLUDE FIXTURES AS INDICATED AND (2) SURGICAL SCRUB SINKS
PP-2024-0070502024-06-12Plumbing221 S 34TH STALTERATIONS AS PER APPROVED DRAWINGS TO INCLUDE (2) TOILETS, (2) LAV SINKS, & (2) FLOOR DRAINS. 6 FIXTURES.
PP-2024-0082472024-06-08Plumbing3201-59 WALNUT STFor minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ S
MP-2024-0022362024-05-31Mechanical221 S 34TH STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE D
PP-2024-0068982024-05-28Plumbing3301 SOLLY AVEplumbing per plans
MP-2024-0020502024-05-28Mechanical3201-59 WALNUT STFOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
MP-2024-0019802024-05-15Mechanical10800 KNIGHTS RDFOR ALTERATIONS TO HVAC SYSTEM INCLUDING NEW REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCTWORK AS PER PLANS.
MP-2024-0020532024-05-01Mechanical1331 E WYOMING AVEFOR MODIFICATIONS TO EXISTING HVAC SYSTEMS, ASSOCIATED DUCT WORK, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSIO
PP-2024-0063482024-05-01Plumbing3201-59 WALNUT STREPLACE 2 LAB SINKS.
PP-2024-0063612024-05-01Plumbing1331 E WYOMING AVE(1) NEW SINK AND (2) NEW ICE MAKER BOXES (LISTED AS WALL BOXES ON THE DWG)
PP-2024-0014122024-04-15Plumbing10800 KNIGHTS RDPlumbing per plans

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Questions about Pmc Mechanical Enterprise, LLC

What permits has Pmc Mechanical Enterprise, LLC filed in Philadelphia?

70 building and trade permits on record from 2023 through 2026, most often plumbing (55.7% of the record).

When did Pmc Mechanical Enterprise, LLC last file a permit in Philadelphia?

The most recent permit on record was issued 2026-09-18: plumbing at 5501-19 CHESTNUT ST.

Where does Pmc Mechanical Enterprise, LLC work?

36 distinct Philadelphia addresses appear on its permits, most often in ZIP codes 19104, 19114, 19111.

Which companies appear on permits with Pmc Mechanical Enterprise, LLC?

Most often Lorenzon Bros Co, Target Bldg Constructn Inc, Intech Construction LLC. Appearing on the same permit is a documented co-appearance, not proof of a current contract.

Search these records

The 70 permits above are a static record through 2026. Select a year above to open that year’s records, or search Pmc Mechanical Enterprise, LLC in Philadelphia, PA by address, trade or date range.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.