COMPANY RECORD · PHILADELPHIA, PA

Rue Electric Inc — permit history in Philadelphia, PA

Rue Electric Inc appears on 57 Philadelphia permit records from 2021 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical57100%

Activity by year

YearPermits issued
20216
202214
202314
202410
20256
20267

Busiest year on record: 2022, with 14 permits. One project can account for several filings, so read this as filing activity rather than workload.

PROJECTS AHEAD SEARCH

Search every Philadelphia permit, not only this company's

This page is a snapshot of Rue Electric Inc. The search behind it holds more than 242,223 Philadelphia permits naming a contractor, since 2021: 82,008 plumbing permits, 51,127 electrical permits, 25,710 mechanical permits, 25,367 residential building permits, 24,512 zoning permits.

  • Search the full history by company, address, permit type or date range.
  • Set an alert and get an email when a new permit matches — the next permit Rue Electric Inc files, or any new electrical permit in Philadelphia. A new permit is an early signal of work to bid on, supply or finance.
  • Export to CSV for your CRM or spreadsheet.

Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans

Names on the same project timelines

Name in sourceLinked permitsLast seen
Aaron Weiner Construction Inc82023-09-05
Domus, Inc.52025-09-03
Bsi Construction LLC42024-05-21
Mcdonald Building Co LLC32025-06-23
National Maint & Build Out LLC22025-04-23
Shawmut Woodworking & Supply Inc22026-02-26
Dale Corporation22026-01-14
Camfred Construction LLC12022-08-01
Deracon LLC12023-09-29
Daniel J. Keating Company12023-05-23
B. Tait Builders, LLC.12024-05-29
Jb Richards Construction LLC12023-04-01

16 named participants share a resolved project timeline with Rue Electric Inc. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
2411 N 11TH ST2026-10-24
3319 EDGEMONT ST2026-08-11
6232-50 WALNUT ST2026-08-04
2079 N 63RD ST2026-04-30
2201 E TIOGA ST2026-04-03
1608-34 SANSOM ST2026-02-26
2190 HORNIG RD2026-01-14
226 N HOBART ST2025-08-07
3400 W GIRARD AVE2025-06-23
641 LINDLEY AVE2025-05-07
2760 RED LION RD2025-04-23
6441 LANSDOWNE AVE2024-12-07
606-22 SPRING GARDEN ST2024-10-28
2112 RIDGE AVE2024-09-13

38 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Tandem Associates Inc102021–2026
Preferred Fire Protection Inc82021–2025
Oneida Fire Protection Inc42022–2026
Joseph Rosati Inc42023–2026
Mk Fire Protection & Supply, LLC42021–2026
Churchville Mechanical Inc42021–2026
Domus, Inc.42022–2026
Klehr Harrison Harvey Branzburg LLP42021–2025

Companies that also appear in Philadelphia permit records at addresses where Rue Electric Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

57 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
EP-2026-0054632026-10-24Electrical2411 N 11TH STInstallation of incoming HT service for building Installation of Switchgear and multiple sub panels for branch circuits, apartment feeder panels Installation of Fire alarm ,Fire Pu
EP-2026-0073702026-08-11Electrical3319 EDGEMONT STInstall a new dedicated circuit off of the existing panel for a new AC unit Install a new 2 pole 25 amp breaker and feed AC unit with a disconnect
EP-2026-0014392026-08-04Electrical6232-50 WALNUT STInstall 18 new 225-amp panels in the basement, fed from the existing switchgear Install 6 new panels for the new HVAC throughout the building Install new branch circuits for each a
EP-2026-0023632026-04-30Electrical2079 N 63RD STInstall new 125 amp panel for DOAS system Install new lighting and power branch circuits as per drawings Fire alarm is existing and will be relocated to meet code
EP-2026-0006062026-04-03Electrical2201 E TIOGA STProvide new incoming service for residential units (1600 amp) and 1000 amp for the rest of the building. Install all branch circuits for power and lighting. Install tel/CATV and
EP-2026-0006082026-02-26Electrical1608-34 SANSOM STInstall one new 225-amp panelboard fed from the existing switchgear. Provide new branch circuits utilizing MC cable in accordance with approved drawings. Install CAT 6 cabling for
EP-2025-0112032026-01-14Electrical2190 HORNIG RDRelocate 2 electrical panels as per drawings Install new 60 amp panel as per drawings Install fire alarm as per attached drawings Install all branch circuits and lighting as per dr
EP-2025-0084322025-09-03Electrical2201 E TIOGA STInstall new 200 amp panel for jobsite temp. power. Install power feed for job site trailer
EP-2025-0068382025-08-07Electrical226 N HOBART STUpgrade service from 100 amp to 200 amp Install new service cable, new meter socket, and new panel
EP-2025-0058442025-06-23Electrical3400 W GIRARD AVEInstall a total of 14 lights in 2 bathrooms. Install 2 floor boxes and 6 receptacles in meeting room. All circuits shall come from existing panels Install wiring for 3 exhaust fans
EP-2025-0038472025-06-03Electrical1608-34 SANSOM STInstall new 400 amp 480 volt panel with a transformer and 2 sub panels 120/208 volt. Install all branch circuits from new panels. Install lighting and power per plans. Install fire
EP-2025-0034972025-05-07Electrical641 LINDLEY AVEINSTALL 1000 AMP ELECTRICAL SERVICE, METER SOCKET AND CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING. INSTALL LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL DEDICAAT
EP-2025-0015782025-04-23Electrical2760 RED LION RDElectrical Permit for combo CP-2024-006425
EP-2024-0115112024-12-19Electrical641 LINDLEY AVEInstall 1 200 amp service for temporary power and lighting for construction site. Hook up job trailer
EP-2024-0085362024-12-07Electrical6441 LANSDOWNE AVEINSTALL A 1,800 AMP 120/208V 3 PHASE SERVICE & 1,800 AMP SWITCHBOARD. INSTALL (2) 400 AMP FEEDERS & METER BANKS, (1) 300 AMP FEEDER & METER BANK. INSTALL PANELS, FEEDERS, & TRANSFO
EP-2024-0109082024-11-28Electrical3400 W GIRARD AVEInstall 1 new panel 200 amp 3 phase MCB Install lighting as per drawings Install as per 2017 NEC
EP-2024-0094722024-10-28Electrical606-22 SPRING GARDEN STElectrical Permit for combo CP-2024-001527
EP-2024-0045162024-09-13Electrical2112 RIDGE AVEInstall 400 amp incoming service for fire pump, 800 amp for MDP, and 1200 amp for residential and commercial metering. Install all grounding. Install all branch circuits for pow
EP-2024-0065162024-07-09Electrical6441 LANSDOWNE AVETemporary 200 amp service for job trailer and temp power for construction site
EP-2024-0052762024-06-04Electrical7159 JAMES STInstall 200 amp service Aerial
EP-2023-0084762024-05-29Electrical2327-83 COTTMAN AVEINSTALL FIRE ALARM SYSTEM ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
EP-2024-0042192024-05-21Electrical3301 SOLLY AVEInstall 2- 800 amp disconnects for service to building, to include 2- 400 amp future panels. Install all branch circuits for power and lighting as per plans. Install power only for
EP-2023-0098802024-02-23Electrical217 N 9TH STINSTALL A 800 AMP/120/208V/ 3 PHASE MDP, (2) 800 AMP 120/208V/ 3 PHASE METER BANKS. INSTALL A 208V/ 3 PHASE SERVICE FOR THE FIRE PUMP. INSTALL A 100 KW GENERATOR & (2) ATS, INSTALL
EP-2023-0104472023-11-14Electrical2604 ISLAND AVEWe will be doing the incoming service ONLY!! Install PECO vault for transformer. Install 6- 4" PVC conduits for 1200 amp service to a CT cabinet for a distribution panel. Install
EP-2023-0055552023-10-13Electrical5364 JACKSON STInstall all incoming service from existing gear in original building, into our new service, as per drawings. Install fire alarm system as per plans. Purchase and install all lighti
EP-2023-0040812023-09-29Electrical6800 ESSINGTON AVEElectrical Permit for combo CP-2022-006908
EP-2023-0079562023-09-05Electrical1909 WALNUT STInstall appliances off of existing power in Unit We are ONLY installing the appliances and plugging in place
EP-2023-0080352023-08-25Electrical217 N 9TH STInstall 100 amp temporary service for construction site and hook up 1 job trailer AS PER NEC 2017
EP-2023-0067652023-07-24Electrical1909 WALNUT STInstall all branch circuits as per drawings for unit 4402 Installation to include power and lighting, switches and receptacles. Install power for Lutron lighting system as per 2017
EP-2023-0046622023-06-13Electrical1909 WALNUT STInstall branch circuits for lighting and power off of existing panel installed by others. Install all final electrical devices such as switches and receptacles . ALL WORK IS TO BE
EP-2023-0047342023-05-23Electrical2112 RIDGE AVEInstall 200 amp service for trailer and job site power and lighting as used for temporary during construction as per 2017 nec
EP-2023-0026032023-04-20Electrical1909 WALNUT STInstall all branch circuits as per drawings. This will include all switches, lights, and receptacles. Install power to Lutron lighting panels AS PER 2017 NEC
EP-2022-0098762023-04-01Electrical12002 E ROOSEVELT BLVDINSTALL (2) 400 AMP 120/208V 3 PHASE SERVICES, (1) CT CABINET & METERING, (1) 400 AMP SERVICE RATED ENCLOSED CIRCUIT BREAKER, (1) 400 AMP FEEDER TO TENANT SHELL SPACE FOR FUTURE FI
EP-2023-0007122023-04-01Electrical2201 E ALLEGHENY AVEInstall all incoming power and raceways as per drawings. Install all lighting and switching ,fire pump and controls as per drawings Install owner provided generator and all associa
EP-2023-0025992023-04-01Electrical1909 WALNUT STInstall all branch circuits including switches, lights, and receptacles as per drawings. Install sub panel off of existing panel in the unit as per 2017 nec
EP-2022-0098752023-04-01Electrical12000 E ROOSEVELT BLVDInstall electrical service to building to include from PECO PAD-MOUNT a 400 amp, 800 amp, and a 1200 amp service for future tenants. Install lighting for code, and wiring for roof
EP-2022-0128862023-02-09Electrical1909 WALNUT STInstall power branch circuits and lighting branch circuits as per drawings. Install 110 volt smoke alarms per code. Install telephone, data, and CATV wiring as per 2017 NEC.
EP-2022-0119802022-12-20Electrical3000 ISLAND AVEINSTALL AN ADDRESSABLE FIRE ALARM SYSTEM . ALL WORK IN ACCORDANCE WITH THE 2017 NEC & 2016 NFPA-72.
EP-2022-0112872022-11-29Electrical45 N 3RD STInstall branch circuits for lighting and power utilizing existing panels. Install new panel PC utilizing existing panel P1 to feed the basement branch circuits. Install all swi
EP-2022-0099972022-11-28Electrical801 E ERIE AVEInstall all branch circuits for lighting and receptacles as per plans. All circuits will be installed using the existing panels and breakers Install low voltage wiring for tel/Data
EP-2022-0065082022-11-23Electrical1611-41 RUAN STInstall a 1,200 amp service, (44) gang meter bank, (44) 100 amp panels & feeders. Install a 800 amp service & MDP, (2) 200 amp panels & feeders, (2) 100 amp panels & feeders. Provi
EP-2022-0113342022-11-16Electrical45 N 3RD STRough-In Permit for EP-2022-011287 Install branch circuits for lighting and power off of existing panels. Install new panel PC off of existing panel P1 to feed the basement branch
EP-2022-0056192022-11-04Electrical3000 ISLAND AVEElectrical Permit for combo CP-2021-009493 **SEPARATE FIRE ALARM PERMIT REQ'D**
EP-2022-0065042022-09-08Electrical1909 WALNUT STInstall electrical systems to entire floor as per drawings. Install additional fire alarm . Install new 400 amp panel for power and lighting. Install switches, receptacles, lights,
EP-2022-0065102022-08-01Electrical3801-51 LOCUST WALKRemove old wiring from walls being removed. Remove existing lights, switches, and receptacles and relocate in new walls as per plans and 2017 NEC. Install new duct detectors as pe
EP-2022-0072962022-07-25Electrical425-29 CHESTNUT STDemo 4 existing lights and replace with 8 LED hi hats using existing circuit. Install 2 floor boxes in new part of stage. Remove existing receptacles and boxes and replace with new
EP-2022-0071322022-07-19Electrical12427 SWEET BRIAR RDInstall new 200 amp service as per 2014 nec
EP-2022-0071302022-07-19Electrical2034 S DARIEN STInstall 28 switches, 34 lights, and 62 receptacles using the existing service and breakers. Install telephone and CATV Install 110 volt smoke detectors as per 2014 nec AMEND Chang
EP-2022-0040202022-05-27Electrical4301 BYBERRY RDRemove Electrical boxes and outlets for new cash wrap furniture and replace using existing wiring. Install 1 power pole for soda case using existing circuit as per 2017 nec
EP-2022-0040312022-04-28Electrical1611-41 RUAN STInstall 200Amp panel for temporary power for construction site as per 2017 nec

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.