COMPANY RECORD · PHILADELPHIA, PA
Camfred Construction LLC — permit history in Philadelphia, PA
Camfred Construction LLC appears on 68 Philadelphia permit records from 2021 through 2026, most often residential building (72.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Residential Building | 49 | 72.1% |
| Building | 17 | 25% |
| Site / Utility Permit | 2 | 2.9% |
3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 56 |
| 2022 | 2 |
| 2023 | 2 |
| 2024 | 4 |
| 2025 | 3 |
| 2026 | 1 |
Busiest year on record: 2021, with 56 permits. One project can account for several filings, so read this as filing activity rather than workload.
Names on the same project timelines
| Name in source | Linked permits | Last seen |
|---|---|---|
| Arber Sulaj | 53 | 2026-06-12 |
| Mk Fire Protection & Supply, LLC | 51 | 2025-05-13 |
| Plumbing Resolution Inc | 50 | 2026-06-17 |
| Bedri Allaraj | 29 | 2026-05-15 |
| All Shore Inc | 22 | 2024-01-18 |
| Oneida Fire Protection Inc | 6 | 2025-10-27 |
| Lor-Mar Mechanical Services LLC | 3 | 2024-06-28 |
| Gm Mechanical Services | 3 | 2025-07-28 |
| Louis Diluzio | 3 | 2025-10-14 |
| Collin Estep | 2 | 2023-11-22 |
| Charles Wright | 1 | 2022-01-10 |
| B.H. Holdings Corp ( Emergency Response Associates) | 1 | 2025-03-05 |
32 named participants share a resolved project timeline with Camfred Construction LLC. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 920-28 MARKET ST | 2026-04-01 |
| 5115-39 BELFIELD AVE | 2025-10-23 |
| 2327-83 COTTMAN AVE | 2025-04-28 |
| 3680-98 ARAMINGO AVE | 2025-01-28 |
| 2716 SOUTH ST | 2024-12-16 |
| 3601-07 N BROAD ST | 2024-12-14 |
| 3400 W GIRARD AVE | 2024-04-19 |
| 1519-25 RIDGE AVE | 2023-10-09 |
| 650 FAIRMOUNT AVE | 2023-08-22 |
| 3801-51 LOCUST WALK | 2022-05-16 |
| 9998 FRANKFORD AVE | 2022-02-09 |
| 1201-15 CALLOWHILL ST | 2021-11-05 |
| 5708 RIDGE AVE | 2021-10-28 |
| 1901-19 E YORK ST | 2021-07-22 |
15 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Palman Electric Inc | 2 | 2022–2025 |
| Arber Sulaj | 2 | 2021–2026 |
| Keegan&Cunnius Plumbing And Mechanical | 2 | 2021–2022 |
| Oneida Fire Protection Inc | 2 | 2021–2022 |
| Klehr Harrison Harvey Branzburg LLP | 2 | 2021–2023 |
| Wm A J Shaeffer & Sons | 1 | 2024–2025 |
| West Chester Mechanical Contractors Inc | 1 | 2024–2025 |
| Oliver Sprinkler Co., Inc. | 1 | 2023–2025 |
Companies that also appear in Philadelphia permit records at addresses where Camfred Construction LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
68 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| CP-2026-001582 | 2026-04-01 | Building | 920-28 MARKET ST | FOR A DRY WALL REPLACEMENT AS PER APPROVED PLANS.**ASBESTOS REMEDIATION REQUIRED PRIOR TO RESUBMISSION** | |
| CP-2025-004348 | 2025-10-23 | Building | 5115-39 BELFIELD AVE | AMENDMENT 8/19/2026 TO INCLUDE LAYOUT CHANGES, NEW FIXTURES, EXTERIOR RAMP MODIFICATIONS, INFILLS AS PER APPROVED PLANS. FOR CHANGE OF OCCUPANCY, ERECTION OF AN ADDITION, AND LE | |
| CP-2025-002245 | 2025-04-28 | Building | 2327-83 COTTMAN AVE | FOR LEVEL II INTERIOR ALTERATIONS WITH A PARTIAL CHANGE IN OCCUPANCY TO GROUP B GROUP MEDICAL OFFICE IN SUITE #60 OF THE EXISTING SHOPPING CENTER. BUILDING IS FULLY SPRINKLERED. AL | |
| CP-2024-006179 | 2025-01-28 | Building | 3680-98 ARAMINGO AVE | FOR LEVEL III ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A BUSINESS OCCUPANCY (URGENT CARE CENTER/MEDICAL OFFICE), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, P | |
| CP-2024-006484 | 2024-12-16 | Building | 2716 SOUTH ST | LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO STORAGE ROOMS ON LEVEL A OF AN EXISTING MEDICAL OFFICE AND RESEARCH BUILDING AS PER APPROVED PLANS. EXISTI | |
| CP-2024-000830 | 2024-12-14 | Building | 3601-07 N BROAD ST | LEVEL III ALTERATIONS (NO CHANGE OF OCCUPANCY CLASSIFICATION) FOR RENOVATIONS TO EXISTING THREE (3) STORY BUILDING WITH BASEMENT FOR USE AS EXISTING MEDICAL CENTER, COMMUNITY PROGR | |
| CP-2024-005409 | 2024-10-29 | Building | 2716 SOUTH ST | FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. | |
| CP-2024-002041 | 2024-04-19 | Building | 3400 W GIRARD AVE | FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE WITHIN THE PHILADELPHIA ZOO WITH NO CHANGE TO GROUP A-2 USE & OCCUPANCY CLASSIFICATION. ALL WORK TO BE DONE PER APPROVED | |
| CP-2023-004817 | 2023-10-09 | Building | 1519-25 RIDGE AVE | FOR A TENANT FIT-OUT TO INCLUDE A CHANGE IN OCCUPANCY TO A TENANT SPACE LOCATED ON THE FIRST FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD COND | |
| SP-2023-000505 | 2023-08-22 | Site / Utility Permit | 650 FAIRMOUNT AVE | FOR SITEWORK FOR THE INSTALLATION OF PLUMBING LINES PER APPROVED PLAN. | |
| CP-2022-000918 | 2022-05-16 | Building | 3801-51 LOCUST WALK | FOR A LEVEL III INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY)TO AN EXISTING STRUCTURE . ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND A | |
| CP-2021-009066 | 2022-02-09 | Building | 9998 FRANKFORD AVE | CORE-SHELL TENANT FIT-OUT FOR A MEDICAL, DENTAL, AND HEALTH PRACTITIONER - GROUP MEDICAL, DENTAL, AND HEALTH PRACTITIONER WITHIN AN EXISTING 1-STORY BUILDING AS PER APPROVED PLANS. | |
| CP-2021-008552 | 2021-12-20 | Building | 650 FAIRMOUNT AVE | AMENDMENT II: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT CP-2021-008552 TO DOCUMENT CHANGE IN SPECIAL INSPECTION AGENCY. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENATIO | |
| CP-2021-008550 | 2021-12-20 | Building | 650 FAIRMOUNT AVE | **Amendment dated 10/24/2024 to submit wood truss submittal package and revised Statement of Special Inspection Schedule.** AMENDMENT: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PER | |
| RP-2020-012386 | 2021-12-10 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013191 | 2021-12-10 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013287 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013270 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013195 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-012911 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013286 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013274 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013304 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013281 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013198 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013276 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013188 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013280 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013298 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-012905 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013282 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-012908 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013290 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-012901 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013256 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013293 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013295 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013254 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013302 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013247 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-012296 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013297 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013248 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013199 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-012379 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013269 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-012887 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECK, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CONF | |
| RP-2020-013268 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013303 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON | |
| RP-2020-013266 | 2021-12-06 | Residential Building | 650 FAIRMOUNT AVE | FOR THE ERECTION OF AN ATTACHED LIGHT-FRAMED STRUCTURE TO INCLUDE ROOF DECKS, ACCESS PILOT HOUSE, PRIVATE GARAGE SEPARATION ASSEMBLIES, ENGINEERED STUD BEARING WALL AND BRACING CON |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 68 permits above are a static record through 2026. Select a year above to open that year’s records, or search Camfred Construction LLC in Philadelphia, PA by address, trade or date range.
Source and limits
Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
