COMPANY RECORD · PHILADELPHIA, PA
Euroquality LLC — permit history in Philadelphia, PA
Euroquality LLC appears on 80 Philadelphia permit records from 2021 through 2026, most often electrical (41.2% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 33 | 41.2% |
| Mechanical | 21 | 26.2% |
| Residential Building | 15 | 18.8% |
| Zoning | 7 | 8.8% |
| Building | 4 | 5% |
5 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 10 |
| 2022 | 16 |
| 2023 | 3 |
| 2024 | 10 |
| 2025 | 9 |
| 2026 | 32 |
Busiest year on record: 2026, with 32 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every Philadelphia permit, not only this company's
This page is a snapshot of Euroquality LLC. The search behind it holds more than 242,223 Philadelphia permits naming a contractor, since 2021: 82,008 plumbing permits, 51,127 electrical permits, 25,710 mechanical permits, 25,367 residential building permits, 24,512 zoning permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Euroquality LLC files, or any new electrical permit in Philadelphia. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Names on the same project timelines
| Name in source | Linked permits | Last seen |
|---|---|---|
| Olympia Construction LLC | 6 | 2026-05-04 |
| A&P Construction LLC | 4 | 2026-07-21 |
| Redion Xhoxhi Joji Contractors | 3 | 2026-01-10 |
| Lk Builders LLC | 3 | 2026-10-29 |
| H.A.Blacksmiths | 2 | 2025-10-24 |
| Midas Investments, LLC | 2 | 2026-02-03 |
| Elsam Corporation | 2 | 2022-08-25 |
| Agim Novruzaj | 1 | 2022-10-01 |
| Isuf Dushku | 1 | 2026-10-07 |
| Ismailanji LLC | 1 | 2026-06-10 |
| Agim Belulaj | 1 | 2022-12-14 |
| Mateos Drywall Construction | 1 | 2026-05-26 |
16 named participants share a resolved project timeline with Euroquality LLC. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1026-28 BELMONT AVE | 2026-10-30 |
| 4919 CATHARINE ST | 2026-10-29 |
| 2000 SOUTH ST | 2026-10-27 |
| 2017 GREEN ST | 2026-10-20 |
| 2833 E VENANGO ST | 2026-10-07 |
| 211-15 W GIRARD AVE | 2026-09-28 |
| 2109 GREEN ST | 2026-09-14 |
| 1514 PORTER ST | 2026-09-10 |
| 585 PARKER AVE | 2026-07-21 |
| 2539 CEDAR ST | 2026-07-02 |
| 5200 WYNNEFIELD AVE | 2026-06-20 |
| 11066 PROCTOR RD | 2026-06-10 |
| 2011 GREEN ST | 2026-05-26 |
| 3062 RUTH ST | 2026-05-13 |
66 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Eagle Electrical Construction Co Inc | 23 | 2021–2025 |
| Ak Scorpion Inc | 13 | 2022–2026 |
| A&P Construction LLC | 10 | 2022–2026 |
| Pasp LLC | 9 | 2021–2026 |
| Michael A Bradley | 9 | 2021–2023 |
| Justin's Plumbing And Heating LLC | 7 | 2022–2026 |
| Thomas Uhl | 7 | 2022–2026 |
| Grosso Concrete LLC | 7 | 2024–2026 |
Companies that also appear in Philadelphia permit records at addresses where Euroquality LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
80 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| CP-2026-004425 | 2026-10-30 | Building | 1026-28 BELMONT AVE | FOR LEVEL III ALTERATIONS WITH CHANGE OF OCCUPANCY TO AN EXISTING COMMERCIAL BUILDING FOR USE AS AN APARTMENT BUILDING WITH FOUR (4) DWELLING UNITS (R-2 OCCUPANCY) ABOVE A VACANT C | |
| EP-2026-010107 | 2026-10-29 | Electrical | 4919 CATHARINE ST | REPLACE PANEL, SWITCHES,OUTLETS,LIGHTS,CEILING FAN ONLY FOR THE 1ST UNIT | |
| EP-2026-006992 | 2026-10-27 | Electrical | 2000 SOUTH ST | . Install 600amp service with 7 meter. Install fire alarm as per plans. Vanilla commercial . Install switches, outlets and hardwire smoke alarms ,em.lighting. ALL WORK IS TO BE DO | |
| EP-2026-005560 | 2026-10-20 | Electrical | 2017 GREEN ST | Rewire two(2) apartments,110v interconnected smoke alarms. All from existing service& fire alarm to remain. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. | |
| EP-2026-009376 | 2026-10-07 | Electrical | 2833 E VENANGO ST | Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE as per Residential Service Equipment EZ Standard. Replace existing 200 AMP SERVI | |
| EP-2026-006200 | 2026-09-28 | Electrical | 211-15 W GIRARD AVE | NEW 600 AMP SERVICE NEW SWITCHES, OUTLETS HARDWIRE SMOKE DETECTORS AND NEW FIRE ALARMS PER ELECTRICAL DESIGNER NO FUEL BURNING APPLIANCES IN THE PROPERTY Separate service load ca | |
| EP-2026-005562 | 2026-09-14 | Electrical | 2109 GREEN ST | Rewire two apartment units. Install lighting, switches, receptacles, smoke/CO alarms, and provide power to equipment as per 2017 NEC. Install fire alarm as per 2016 NFPA 72. | |
| ZP-2024-012700 | 2026-09-10 | Zoning | 1514 PORTER ST | FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK ACCESSED BY A PILOTHOUSE, SIZE AND LOCATION AS SHOWN ON THE PLANS. | |
| EP-2026-006751 | 2026-07-21 | Electrical | 585 PARKER AVE | Electrical Permit for combo RP-2026-007258 | |
| RP-2026-005040 | 2026-07-02 | Residential Building | 2539 CEDAR ST | Bench Footing Installation to increase basement ceiling height from 6'-8 to 7'-4", installation of egress well. | |
| EP-2026-005709 | 2026-06-20 | Electrical | 5200 WYNNEFIELD AVE | WIRE THROUGHOUT INSTALL HARDWIRE SMOKE DETECTOR,INSTALL SWITCHES,OUTLETS LIGHT FIXTURES AS PER NEC 2017 | |
| EP-2026-005007 | 2026-06-10 | Electrical | 11066 PROCTOR RD | All new wiring for the new addition, for two bedrooms, one bathroom on the second floor and the kitchen and living room on the first floor, using the existing panel. | |
| EP-2026-002256 | 2026-05-26 | Electrical | 2011 GREEN ST | Rewire Units 1R and 1F in their entirety due to renovation. Work includes installation of new branch circuit wiring, switches, receptacle outlets, and smoke detectors. Replace ex | |
| EP-2026-003891 | 2026-05-13 | Electrical | 3062 RUTH ST | WIRE THROUGHOUT NEW 200 AMP SERVICE NEW PANEL HARDWIRE SMOKE DETECTORS | |
| EP-2026-000005 | 2026-05-04 | Electrical | 26-34 CHURCH LN | Installation of 1200 amp meter bank service per plans. 400 amp Panel for House circuits Interior wiring of 33 dwelling units and common areas. Install a fire alarm throughout. Inst | |
| EP-2026-003455 | 2026-04-27 | Electrical | 1620 S 11TH ST | New 200 AMP Service, wire the whole house, new electric panel, new switches and outlets, and new hardwire smoke detector. | |
| RP-2026-000067 | 2026-04-14 | Residential Building | 6983 SILVERWOOD ST | FOR THE ERECTION OF A REAR YARD DECK ADDITION TO AN EXISTING DETACHED BUILDING. DETAILS AS SHOWN ON THE APPLICATION/PLAN. | |
| RP-2026-000069 | 2026-03-24 | Residential Building | 6981 SILVERWOOD ST | Construction of a rear outdoor deck to comply with CF-2025-085140 , details as shown on plans. | |
| EP-2026-002254 | 2026-03-19 | Electrical | 2329 E DAUPHIN ST | New wire throughout the building install hardwired smoke detector, switches outlets as per 2017 nec | |
| EP-2026-002255 | 2026-03-19 | Electrical | 1416 E SUSQUEHANNA AVE | Install 200 amp service with 40 circuit panel .Wire throughout the building hardwire smoke detector install switches, outlets as per nec 2017 | |
| EP-2026-000707 | 2026-02-25 | Electrical | 2133 MORRIS ST | New wiring install new hardwire smoke detector install new switches outlets | |
| EP-2025-011991 | 2026-02-18 | Electrical | 1219 W WESTMORELAND ST | Install 300 amp service 4 gang meter socket, wire throughout , install fire alarm, hardwired smoke alarms, outlets and switches. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWIN | |
| EP-2026-000828 | 2026-02-07 | Electrical | 6115 WALTON AVE | install 600amp service ,install 5 panels 125 amp and 1 panel 100 amp for house meter. New wiring through out the building install hardwire smoke alarms, switches ,outlets .Install | |
| EP-2025-009639 | 2026-02-03 | Electrical | 1515 N STILLMAN ST | INSTALL 1200 AMP ELECTRICAL SERVICE AND 15 METER PACKS WITH PROPER GROUNDING AND BONDING. INSTALL ONE 125 AMP SUBPANELS FOR HOUSE AND ONE 150 AMP SUBPANEL FOR EACH OF THE 14 DWEL | |
| EP-2025-009643 | 2026-02-03 | Electrical | 1525 N STILLMAN ST | Scope of Work: INSTALL 1600-AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, INSTALL OUTLETS, SWITCHES, SMOKE ALARMS, AND GROUNDING AS PER 2017 NEC. INSTALL FIRE ALARM THRO | |
| EP-2022-000938 | 2026-02-03 | Electrical | 2723 W CABOT ST | NEW CONSTRUCTION WIRE THROUGH OUT THE BUILDING.INSTALL 200AMP SERVICE WITH 40 CIRCUIT PANEL.NEW GROUNDING SYSYTEM.INSTALL HARD WIRE SMOKE DETECTORS,SWITCHES,OUTLETS AND LIGHT FIXTU | |
| EP-2021-015775 | 2026-02-03 | Electrical | 2721 W CABOT ST | NEW CONSTRUCTION WIRE THROUGH OUT THE BUILDING.NEW 200 AMP SERVICE WITH 40 CIRCUIT PANEL.NEW GROUNDING SYSTEM.HARDWIRE SMOKE DETECTORS,INSTALL SWITCHES,OUTLETS,LIGHT FIXTURES AS PE | |
| EP-2025-009644 | 2026-01-13 | Electrical | 1108 W DAUPHIN ST | **ELECTRICAL PERMIT REQ'D FOR FITOUT OF COMMERCIAL SPACES -A SERVICE CALC WAS NOT SUPPLIED FOR COMMERCIAL SPACES (VACANT CALC ONLY) A NEW SERVICE CALC WILL BE NEEDED FOR FUTURE USE | |
| ZP-2025-007282 | 2026-01-12 | Zoning | 2030 GRANT AVE | Personal Services | |
| EP-2024-011009 | 2026-01-10 | Electrical | 1915 WATKINS ST | Electrical Permit for combo RP-2024-006019 | |
| EP-2024-007844 | 2026-01-10 | Electrical | 1911 WATKINS ST | Electrical Permit for combo RP-2024-006375 | |
| EP-2024-009856 | 2026-01-10 | Electrical | 1913 WATKINS ST | Electrical Permit for combo RP-2024-009053 | |
| EP-2025-009645 | 2025-12-30 | Electrical | 1938 N 22ND ST | INSTALL400A SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, INSTALL OUTLETS, SWITCHES, SMOKE ALARMS, GROUNDING . INSTALL FIRE ALARM W/ LOW FREQUENCY SOUND IN ALL LIVING RMS AN | |
| EP-2025-009646 | 2025-12-18 | Electrical | 1940 N 22ND ST | Scope of Work: INSTALL 400 AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, INSTALL OUTLETS, SWITCHES, SMOKE DETECTORS, AND GROUNDING AS PER 2017 NEC. INSTALL FIRE ALARM TH | |
| EP-2025-010631 | 2025-11-06 | Electrical | 2443 S 7TH ST | Replace meter and panels install two meter gang 200 amp service | |
| EP-2025-009353 | 2025-10-31 | Electrical | 4995 W THOMPSON ST | INSTALL 600AMP - 1PHS SERVICE, WIRING THROUGHOUT, 2 COMMERCIAL SPCES, GARAGE, AND 2 DWELLING UNITS. INSTALL FIRE ALARM THROUGHOUT THE BUILDING AS PER ELECTRIC AND FIRE PLANS. IN AC | |
| EP-2025-009762 | 2025-10-24 | Electrical | 1237 W TIOGA ST | INSTALL400amp SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, INSTALL OUTLETS, SWITCHES, SMOKE ALARMS, GROUNDING . INSTALL FIRE ALARM THROUGHOUT THE BUILDING . ALL WORK IS TO | |
| EP-2025-009365 | 2025-10-03 | Electrical | 1335 S 8TH ST | Replace switches and outlets for unit 1 and 2 and hallway. Replace existing fire alarm Horn/Strobe. | |
| EP-2025-001746 | 2025-10-01 | Electrical | 5410 WYALUSING AVE | Electrical Permit for combo RP-2024-011469 | |
| ZP-2024-011065 | 2025-06-18 | Zoning | 123 ALBURGER AVE | Permit for the erection of a second story addition over existing one-story portion and for the legalization of an accessory storage shed of an existing single family detached struc | |
| MP-2024-005204 | 2025-01-09 | Mechanical | 2031 S CLEVELAND ST | EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from the | |
| ZP-2024-010512 | 2024-12-23 | Zoning | 2030 GRANT AVE | Office - Business and Professional | |
| ZP-2024-006843 | 2024-12-23 | Zoning | 2030 GRANT AVE | Maintenance and Repair of Consumer Goods | |
| ZP-2024-010513 | 2024-10-16 | Zoning | 2030 GRANT AVE | Child Care - Child Care Center | |
| CP-2024-004712 | 2024-09-26 | Building | 2706 FEDERAL ST | NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH PRIVATE ROOF DECK AND PILOT HOUSE FOR USE AS A THREE (3) FAMILY DWELLING WITH ACCESSORY SURFACE PARKING AS PER APPROVED PLANS. B | |
| CP-2024-004714 | 2024-09-26 | Building | 2708 FEDERAL ST | NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH PRIVATE ROOF DECK AND PILOT HOUSE FOR USE AS A THREE (3) FAMILY DWELLING WITH ACCESSORY SURFACE PARKING AS PER APPROVED PLANS. B | |
| ZP-2024-006842 | 2024-09-25 | Zoning | 2030 GRANT AVE | Maintenance and Repair of Consumer Goods | |
| MP-2024-004052 | 2024-09-09 | Mechanical | 825 E THOMPSON ST | EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from th | |
| RP-2024-007593 | 2024-07-20 | Residential Building | 825 E THOMPSON ST | FOR THE INTERIOR ALTERATIONS AND RENOVATION, INCLUDING REMOVAL AND REPLACEMENT OF THE BASEMENT SLAB, IN AN EXISTING SINGLE-FAMILY DWELLING AS PER THE PLAN. ** EXCAVATION ON THE BAS | |
| RP-2024-003464 | 2024-04-29 | Residential Building | 934 MOUNTAIN ST | Interior alteration of the existing two-story house with basement. Addition third story above the existing two story and the roof deck. Pilot house used as access stair only. NO WO |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
