COMPANY RECORD · PHILADELPHIA, PA

Euroquality LLC — permit history in Philadelphia, PA

Euroquality LLC appears on 72 Philadelphia permit records from 2021 through 2026, most often electrical (37.5% of the record).

Permit categories

CategoryPermitsShare
Electrical2737.5%
Mechanical2129.2%
Residential Building1520.8%
Zoning68.3%
Building34.2%

5 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202110
202216
20233
202410
20259
202624

Busiest year on record: 2026, with 24 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
Olympia Construction LLC62026-05-04
A&P Construction LLC42026-07-21
Redion Xhoxhi Joji Contractors32026-01-10
Elsam Corporation22022-08-25
H.A.Blacksmiths22025-10-24
Lk Builders LLC22026-03-19
Midas Investments, LLC22026-02-03
Agim Belulaj12022-12-14
Agim Novruzaj12022-10-01
Mark Morales12026-02-25
Renato Rizaj12022-07-26
Yona Construction LLC12026-02-18

12 named participants share a resolved project timeline with Euroquality LLC. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
585 PARKER AVE2026-07-21
2539 CEDAR ST2026-07-02
5200 WYNNEFIELD AVE2026-06-20
11066 PROCTOR RD2026-06-10
2011 GREEN ST2026-05-26
3062 RUTH ST2026-05-13
26-34 CHURCH LN2026-05-04
1620 S 11TH ST2026-04-27
6983 SILVERWOOD ST2026-04-14
6981 SILVERWOOD ST2026-03-24
1416 E SUSQUEHANNA AVE2026-03-19
2329 E DAUPHIN ST2026-03-19
2133 MORRIS ST2026-02-25
1219 W WESTMORELAND ST2026-02-18

58 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

72 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
EP-2026-0067512026-07-21Electrical585 PARKER AVEElectrical Permit for combo RP-2026-007258
RP-2026-0050402026-07-02Residential Building2539 CEDAR STBench Footing Installation to increase basement ceiling height from 6'-8 to 7'-4", installation of egress well.
EP-2026-0057092026-06-20Electrical5200 WYNNEFIELD AVEWIRE THROUGHOUT INSTALL HARDWIRE SMOKE DETECTOR,INSTALL SWITCHES,OUTLETS LIGHT FIXTURES AS PER NEC 2017
EP-2026-0050072026-06-10Electrical11066 PROCTOR RDAll new wiring for the new addition, for two bedrooms, one bathroom on the second floor and the kitchen and living room on the first floor, using the existing panel.
EP-2026-0022562026-05-26Electrical2011 GREEN STRewire Units 1R and 1F in their entirety due to renovation. Work includes installation of new branch circuit wiring, switches, receptacle outlets, and smoke detectors. Replace ex
EP-2026-0038912026-05-13Electrical3062 RUTH ST
EP-2026-0000052026-05-04Electrical26-34 CHURCH LN
EP-2026-0034552026-04-27Electrical1620 S 11TH ST
RP-2026-0000672026-04-14Residential Building6983 SILVERWOOD ST
RP-2026-0000692026-03-24Residential Building6981 SILVERWOOD ST
EP-2026-0022552026-03-19Electrical1416 E SUSQUEHANNA AVE
EP-2026-0022542026-03-19Electrical2329 E DAUPHIN ST
EP-2026-0007072026-02-25Electrical2133 MORRIS ST
EP-2025-0119912026-02-18Electrical1219 W WESTMORELAND ST
EP-2026-0008282026-02-07Electrical6115 WALTON AVE
EP-2021-0157752026-02-03Electrical2721 W CABOT ST
EP-2022-0009382026-02-03Electrical2723 W CABOT ST
EP-2025-0096432026-02-03Electrical1525 N STILLMAN ST
EP-2025-0096392026-02-03Electrical1510 N 25TH ST
EP-2025-0096442026-01-13Electrical1108 W DAUPHIN ST
ZP-2025-0072822026-01-12Zoning2030 GRANT AVE
EP-2024-0078442026-01-10Electrical1911 WATKINS ST
EP-2024-0110092026-01-10Electrical1915 WATKINS ST
EP-2024-0098562026-01-10Electrical1913 WATKINS ST
EP-2025-0096452025-12-30Electrical1938 N 22ND ST
EP-2025-0096462025-12-18Electrical1940 N 22ND ST
EP-2025-0106312025-11-06Electrical2443 S 7TH ST
EP-2025-0093532025-10-31Electrical4995 W THOMPSON ST
EP-2025-0097622025-10-24Electrical1237 W TIOGA ST
EP-2025-0093652025-10-03Electrical1335 S 8TH ST
EP-2025-0017462025-10-01Electrical5408 WYALUSING AVE
ZP-2024-0110652025-06-18Zoning123 ALBURGER AVE
MP-2024-0052042025-01-09Mechanical2031 S CLEVELAND ST
ZP-2024-0105122024-12-23Zoning2030 GRANT AVE
ZP-2024-0068432024-12-23Zoning2030 GRANT AVE
ZP-2024-0105132024-10-16Zoning2030 GRANT AVE
CP-2024-0047122024-09-26Building2706 FEDERAL ST
CP-2024-0047142024-09-26Building2708 FEDERAL ST
ZP-2024-0068422024-09-25Zoning2030 GRANT AVE
MP-2024-0040522024-09-09Mechanical825 E THOMPSON ST
RP-2024-0075932024-07-20Residential Building825 E THOMPSON ST
RP-2024-0034642024-04-29Residential Building934 MOUNTAIN ST
MP-2023-0047412024-04-23Mechanical217 TASKER ST
MP-2023-0051292023-11-28Mechanical1127 N HANCOCK ST
RP-2023-0077392023-10-30Residential Building217 TASKER ST
MP-2023-0022992023-05-25Mechanical2833 S WARNOCK ST
MP-2022-0040132022-12-14Mechanical809 DIAMOND ST
RP-2022-0061322022-11-17Residential Building1127 N HANCOCK ST
MP-2022-0051572022-10-13Mechanical1910 S HICKS ST
MP-2022-0051582022-10-13Mechanical2469 MEMPHIS ST

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →