COMPANY RECORD · PHILADELPHIA, PA
Carr And Duff LLC — electrical permits in Philadelphia, PA
Carr And Duff LLC appears on 116 electrical permits issued by the Philadelphia Department of Licenses and Inspections from 2021 through 2026, most often electrical (94.8% of the record).
At a glance
- First permit on record
- 2021-01-07
- Most recent permit
- 2026-10-30
- Years with filings
- 6 (2021–2026)
- Busiest year
- 2023 · 24 permits
- Main category
- Electrical · 94.8%
- Distinct addresses
- 74
- Most frequent ZIP codes
- 19153, 19131, 19107
How Carr And Duff LLC compares in Philadelphia
In 2025, Carr And Duff LLC filed 23 electrical permits in Philadelphia — 93rd of 610 companies named on electrical permits that year. Across all records since 2021, it ranks 107th of 1,021 with 110 electrical permits.
Ranked by the number of permits in the company's main category, among every company named on such permits in Philadelphia records — not only those with a page here. Companies with equal counts share a place. Filing volume measures activity, not quality.
Latest electrical permits
| Issued | Category | Address in source | Scope as filed |
|---|---|---|---|
| 2026-10-30 | Electrical | 1604 CHESTNUT ST | Electrical work includes installation of the transformer and connection to the existing electrical service and panels. All work to be performed according to the 2020 NEC and per |
| 2026-10-07 | Electrical | 3901 CONSHOHOCKEN AVE | Replace existing 13,200 volt main switch as per 2020 NEC. |
| 2026-09-23 | Electrical | 2701-99 BELMONT AVE | Wiring of instrumentation and control panels, Furnishing and installing heat trace for wrap installation. All work to be perform according to the 2017 NEC and per approved plans. |
| 2026-09-01 | Electrical | 5901 HAMMOND AVE | Install and retrofit MUSCO sport lighting for the baseball field lighting. All work to be perform according to the 2017 NEC and per approved plans |
| 2026-08-27 | Electrical | 303 N BROAD ST | Electrical Permit for combo SP-2026-000520 ELECTRIC: INSTALL TEMP CONSTRUCTION SERVICE,ELECTRICAL SITE WORK W/ NEW FEEDERS & 800A 100% RATED BREAKER AT EXISTING MDP. |
The 5 most recent filings; the full list is further down.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 110 | 94.8% |
| Building | 3 | 2.6% |
| Site / Utility Permit | 2 | 1.7% |
| Zoning | 1 | 0.86% |
4 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 15 |
| 2022 | 15 |
| 2023 | 24 |
| 2024 | 16 |
| 2025 | 24 |
| 2026 | 22 |
Busiest year on record: 2023, with 24 permits. One project can account for several filings, so read this as filing activity rather than workload.
Names on the same project timelines
| Name in source | Linked permits | Last seen |
|---|---|---|
| Bsi Construction LLC | 3 | 2024-04-05 |
| Seravalli Inc | 3 | 2026-03-16 |
| P Agnes Inc | 3 | 2025-09-29 |
| Connor Construction LLC | 2 | 2025-10-06 |
| National Maint & Build Out LLC | 2 | 2025-01-29 |
| C Abbonizio Contractors Inc | 1 | 2025-12-03 |
| Clemens Construction Co Inc.. | 1 | 2024-06-12 |
| Commerce Construction Corp | 1 | 2024-10-25 |
| Curtis Sedden | 1 | 2025-01-22 |
| City Of Philadelphia | 1 | 2025-03-04 |
| Borrelli Construction, LLC | 1 | 2023-12-08 |
| Axiom Distribution And Fulfillment Corp. | 1 | 2025-09-17 |
28 named participants share a resolved project timeline with Carr And Duff LLC. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1604 CHESTNUT ST | 2026-10-30 |
| 3901 CONSHOHOCKEN AVE | 2026-10-07 |
| 2701-99 BELMONT AVE | 2026-09-23 |
| 5901 HAMMOND AVE | 2026-09-01 |
| 303 N BROAD ST | 2026-08-27 |
| 8500 ESSINGTON AVE | 2026-08-12 |
| 2760 RED LION RD | 2026-07-02 |
| 24-28 S 8TH ST | 2026-06-15 |
| 7400 LANSDOWNE AVE | 2026-05-25 |
| 3401 GRAYS FERRY AVE | 2026-05-13 |
| 4115 MONTGOMERY DR | 2026-05-12 |
| 3400 MAIDEN LN | 2026-05-06 |
| 3301 W GIRARD AVE | 2026-04-09 |
| 1954 PATTISON AVE | 2026-03-16 |
74 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Klehr Harrison Harvey Branzburg LLP | 10 | 2021–2026 |
| Tandem Associates Inc | 8 | 2021–2026 |
| Jpc Group, Inc. | 7 | 2022–2026 |
| Oliver Sprinkler Co., Inc. | 6 | 2021–2026 |
| Bsi Construction LLC | 5 | 2021–2026 |
| Meco Constructors Inc | 4 | 2022–2026 |
| Stephanie Rumer | 4 | 2021–2026 |
| Pennoni Associates, Inc. | 4 | 2021–2026 |
Companies that also appear in Philadelphia permit records at addresses where Carr And Duff LLC filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Electrical permits on record
116 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| EP-2026-009841 | 2026-10-30 | Electrical | 1604 CHESTNUT ST | Electrical work includes installation of the transformer and connection to the existing electrical service and panels. All work to be performed according to the 2020 NEC and per | |
| EP-2026-009338 | 2026-10-07 | Electrical | 3901 CONSHOHOCKEN AVE | Replace existing 13,200 volt main switch as per 2020 NEC. | |
| EP-2026-005630 | 2026-09-23 | Electrical | 2701-99 BELMONT AVE | Wiring of instrumentation and control panels, Furnishing and installing heat trace for wrap installation. All work to be perform according to the 2017 NEC and per approved plans. | |
| EP-2026-006303 | 2026-09-01 | Electrical | 5901 HAMMOND AVE | Install and retrofit MUSCO sport lighting for the baseball field lighting. All work to be perform according to the 2017 NEC and per approved plans | |
| EP-2026-007507 | 2026-08-27 | Electrical | 303 N BROAD ST | Electrical Permit for combo SP-2026-000520 ELECTRIC: INSTALL TEMP CONSTRUCTION SERVICE,ELECTRICAL SITE WORK W/ NEW FEEDERS & 800A 100% RATED BREAKER AT EXISTING MDP. | |
| SP-2026-000520 | 2026-08-12 | Site / Utility Permit | 303 N BROAD ST | FOR THE INSTALLATION OF UNDERGROUND UTILITIES AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLAN. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESI | |
| EP-2026-005373 | 2026-08-12 | Electrical | 8500 ESSINGTON AVE | Replace lighting at Terminal A-East & Terminal E with high mast lighting poles. add/extend branch and feeder wiring and distribution equipment . ALL WORK IS TO BE DONE ACCORDING TO | |
| EP-2026-004926 | 2026-07-02 | Electrical | 2760 RED LION RD | Power feeders & lighting installation for a new conveyor system. 100A power feeders at 2 locations. Wiring for area lighting ***ALL WORK PER APPROVED PLANS*** | |
| EP-2026-004955 | 2026-06-15 | Electrical | 2760 RED LION RD | Installation of 6 replacement pad-mounted transformers (5 - 1500kVA & 1 - 750kVA) . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. | |
| EP-2026-005097 | 2026-06-15 | Electrical | 24-28 S 8TH ST | Refeed existing 200Amp, 240V, 1-Phase,3-Wire existing load center for parking lot lighting as per 2017 NEC. | |
| EP-2026-003201 | 2026-05-25 | Electrical | 7400 LANSDOWNE AVE | Provide all labor, material, equipment, and supervision for the intake pump electrical feed to run one (1) 3” SCH 40 PVC conduit plus one spare 3” SCH 40 PVC conduit from 50 FT. aw | |
| EP-2026-001366 | 2026-05-13 | Electrical | 3401 GRAYS FERRY AVE | Install owner furnished medium voltage switchgear, MV switches, MV transformers, DC battery rack system, power panels, lighting, receptacles, FA devices, data devices, conduit, and | |
| EP-2026-004010 | 2026-05-12 | Electrical | 4115 MONTGOMERY DR | Temporary 200 amp single phase 120/240v service entrance for mobile cell site | |
| EP-2026-002871 | 2026-05-06 | Electrical | 3400 MAIDEN LN | Provide (3) 200amp 3-Phase 120/208 main breaker panels and (1) Disconnect. Temporary Service will be feed from existing PECO pole #67169 with (3) existing PECO Pole Top 25KVA tran | |
| EP-2026-002988 | 2026-04-09 | Electrical | 3301 W GIRARD AVE | 200 amp 1-Phase 120/240v Temp. Electrical Service for Jobsite Trailer. | |
| EP-2025-012043 | 2026-03-18 | Electrical | 8500 ESSINGTON AVE | Disconnect & remove the existing disconnects and starters from the Mechanical and HVAC equipment. Install new Feeders to the mechanical-supplied disconnects, VFDs, and equipment. D | |
| EP-2026-001437 | 2026-03-16 | Electrical | 1954 PATTISON AVE | Install underground duct bank and associated distribution equipment to serve the recreation park. Furnish and install the Musco sports lighting system, including poles, luminaires, | |
| EP-2025-011846 | 2026-03-12 | Electrical | 4540 RIDGE AVE | Electrical Permit for combo CP-2025-005309 | |
| EP-2024-002800 | 2026-02-27 | Electrical | 4301-15 WISSAHICKON AVE | Electrical Permit for combo SP-2023-000100 | |
| EP-2026-000948 | 2026-02-24 | Electrical | 8401 STATE RD | New power to bridge crane Power for rollup door Power for Unit Heater Power for heat pumps Lightning Protection New Power to intake crane Temp electric as needed ***NO FIRE ALARM | |
| EP-2025-011886 | 2026-01-27 | Electrical | 1101 ARCH ST | 12th and Filbert Street tunnel lighting renovation and painting of underpass. Furnish and install 3/4'' GRS conduit, lighting circuits, lighting, lighting controls, 30 kVA transfor | |
| CP-2025-005309 | 2026-01-06 | Building | 4540 RIDGE AVE | FOR THE ERECTION OF SWITCHGEARS AND GENERATORS ON CONCRETE PADS AND ASSOCIATED WORK TO REPLACE SUMP PUMPS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK. | |
| EP-2025-011371 | 2025-12-03 | Electrical | Electrical Permit for combo SP-2025-001317 | ||
| EP-2025-008803 | 2025-12-02 | Electrical | 5700 HAVERFORD AVE | Recreational building renovations/ expansion. Including a new PECO utility transformer and incoming service. Including all new Fire alarm equipment and system. In accordance wi | |
| EP-2025-011112 | 2025-11-19 | Electrical | 1201 S 35TH ST | Installation of new 100amp, 240/120v, 1-Phase service / panel at Pennovation Works Off-Site Parking Lot. | |
| EP-2025-009341 | 2025-11-19 | Electrical | 501-35 MARKET ST | Replacing 300 existing light fixtures (one for one) with no new conduit or wiring. Also upgrading the conduit and wiring in the elevator machine room. *************** | |
| EP-2025-009448 | 2025-10-23 | Electrical | 2760 RED LION RD | INSTALL 23 RELAY MODULES FOR HVLS FANS SHUTDOWNS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA AND PER PLANS. | |
| EP-2025-004922 | 2025-10-17 | Electrical | 3401 GRAYS FERRY AVE | Provide temporary 13.2KVA high voltage from PECO service manhole service access and PECO selector switch and run aerial cable on (11) telephone poles to new 4 section 1000 amp 13.2 | |
| EP-2025-007858 | 2025-10-14 | Electrical | 2760 RED LION RD | Install 23 High Velocity fans in warehouse area . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT WILL BE REQ'D FOR THE FIRE ALARM WOR | |
| EP-2025-009450 | 2025-10-09 | Electrical | 2001 HAMILTON ST | Install 1000kva transformer for future use. All work to be done according to the 2017 NEC. | |
| EP-2025-009434 | 2025-10-06 | Electrical | 2760 RED LION RD | INSTALL LIGHTING FIXTURES, LIGHTING CONTROL, GFCI RECEPTACLE OUTLETS AND REPLACE FIRE ALARM DEVICES TO RESTROOM AREA. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC. | |
| EP-2025-007532 | 2025-09-29 | Electrical | 2910 SOUTH ST | Install branch circuits, disconnects and VFDs for mechanical equipment; two light fixtures; one new receptacle ,fire alarm. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-20 | |
| CP-2025-003010 | 2025-09-18 | Building | 2001 HAMILTON ST | FOR THE INSTALLATION OF STRUCTURAL STEEL TO SUPPORT THE EXISTING ROOF STRUCTURE. FOR USE AS PREVIOUSLY APPROVED. AS PER APPROVED PLANS. ************SEPARATE PERMITS FOR ANY OTHER | |
| EP-2025-007724 | 2025-09-17 | Electrical | 2760 RED LION RD | New lighting and receptacles on mezzanine platform . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. | |
| EP-2025-003586 | 2025-06-12 | Electrical | 8500 ESSINGTON AVE | Disconnect and make Electrical safe qty: (16) RTUs Furnish and install conduit, wiring as described for the new HVAC units. Disconnect and make the existing fire alarm devices saf | |
| EP-2025-003576 | 2025-06-11 | Electrical | 8500 ESSINGTON AVE | Disconnect and make electrically safe qty (21) HVAC RTUs. Replace HVAC RTU(s) as per plans and 2017 NEC. Disconnect and Install new Fire Alarm Devices per drawings for the D/E bag | |
| EP-2025-003982 | 2025-06-09 | Electrical | 1601-35 E WALNUT LN | Simons Recreation Center Relocate (3) existing high mast pole lights, relamp (4) additional high mast poles, added distribution for mechanical equipment, new locker rooms, restroom | |
| EP-2025-004987 | 2025-06-02 | Electrical | 2701-99 BELMONT AVE | Miscellaneous power upgrades to support upgrades to elevator equipment. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT REQ'D** | |
| EP-2025-004976 | 2025-05-29 | Electrical | 5201 PARKSIDE AVE | Install Grounding for Temporary portable generators for Music Festival at the Mann Music Festival. | |
| EP-2025-003567 | 2025-05-22 | Electrical | 3101 ORTHODOX ST | INSTALL 225 AMP ELECTRICAL SERVICE WITH CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING FOR LIGHTING. INSTALL 6 LIGHT POLES WITH PROPER GROUNDING AND BONDING FOR EXTERIOR | |
| EP-2025-001712 | 2025-03-04 | Electrical | 640 WATER WORKS DR | INSTALL A 400 AMP / 3 PHASE SERVICE, 400 AMP / 3 PHASE FUSED DISCONNECT SWITCH & 400 AMP /3 PHASE PANEL. INSTALL (10) 45' WOOD POLES WITH OVERHEAD SERVICE CONDUCTORS. ALL WORK IN A | |
| EP-2025-000011 | 2025-01-30 | Electrical | 8500 ESSINGTON AVE | DISCONNECT & REMOVE THE FEEDERS, DISCONNECT SWITCHES & STARTERS FROM THE EXISTING MECHANICAL & HVAC EQUIPMENT. INSTALL NEW FEEDERS, DISCONNECTS & STARTERS FOR THE NEW MECHANICAL & | |
| EP-2025-000538 | 2025-01-29 | Electrical | 2760 RED LION RD | Adding 2 receptacles and 2 lights to security canopy | |
| EP-2025-000156 | 2025-01-22 | Electrical | 1101 ARCH ST | Furnish and install panels, conduit, feeders, branch wiring, receptacles, lighting as per 2017 NEC. | |
| EP-2024-011842 | 2025-01-22 | Electrical | 901-37 FILBERT ST | INSTALLATION OF 600KW GENERATOR AND REPLACING EXISTING ELECTRICAL PANELS IN KIND. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. | |
| EP-2024-011838 | 2025-01-10 | Electrical | 114-24 S FRONT ST | Install new lighting for parking garage and replace existing electrical panels AND RING OUT &VERIFY CIRCUITS TO UPDATE PANEL SCHEDULES , and 13.2kv switch in kind. | |
| EP-2024-010646 | 2024-11-19 | Electrical | 3201 N 5TH ST | INSTALL A 45KVA TRANSFORMER & 100 AMP PANEL & FEEDER. INSTALL LIGHTING CONTACTOR & TIMER. EXTEND THE EXISTING DUCT BANK, & INSTALL NEW CIRCUITING TO THE EXISTING SITE LIGHTS. ALL W | |
| EP-2024-007609 | 2024-10-31 | Electrical | 4501 RICHMOND ST | Install (3) wooden poles with LED lights and GFCI(s) for a community dog park at the rear of the property. Install new 60 amp service and grounding. Install (1) 60 amp 12-circuit | |
| EP-2024-008315 | 2024-10-25 | Electrical | 2760 RED LION RD | Install (1) 60 amp disconnect, (1) 30kva transformer, (1) 100 amp MCB panel, lighting, receptacles, power to equipment, and exit/emergency lights as per 2017 NEC. | |
| EP-2024-010313 | 2024-10-25 | Electrical | 1400 KITTY HAWK AVE | Installation of utility company (Dominion Energy) provided 13.2KV distribution equipment & 208/120V distribution. Branch circuit wiring for new light poles and power as per 2017 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Other electrical contractors in Philadelphia
| Company | Permits on record |
|---|---|
| William Sommerville | 118 |
| Star Light Electric Inc | 116 |
| Beng Ding | 115 |
| Swartley Bros Engineers Inc | 115 |
| Galaxy Electric LLC | 114 |
| Bluestone Communications Inc | 113 |
| H B Frazer Co Penna | 113 |
| Bsf Electrical Contractors LLC | 111 |
Companies whose main permit category in Philadelphia is also electrical, closest to Carr And Duff LLC in filing volume. Listed for comparison, not as a recommendation.
Questions about Carr And Duff LLC
What permits has Carr And Duff LLC filed in Philadelphia?
116 electrical permits on record from 2021 through 2026, most often electrical (94.8% of the record).
When did Carr And Duff LLC last file a permit in Philadelphia?
The most recent permit on record was issued 2026-10-30: electrical at 1604 CHESTNUT ST.
Where does Carr And Duff LLC work?
74 distinct Philadelphia addresses appear on its permits, most often in ZIP codes 19153, 19131, 19107.
Which companies appear on permits with Carr And Duff LLC?
Most often Bsi Construction LLC, Seravalli Inc, P Agnes Inc. Appearing on the same permit is a documented co-appearance, not proof of a current contract.
Search these records
The 116 permits above are a static record through 2026. Select a year above to open that year’s records, or search Carr And Duff LLC in Philadelphia, PA by address, trade or date range.
Source and limits
Public Philadelphia electrical permits from the Philadelphia Department of Licenses and Inspections through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
