Swartley Bros Engineers Inc appears on 115 Philadelphia permit records from 2021 through 2026, most often electrical (91.3% of the record).

Permit categories

CategoryPermitsShare
Electrical10591.3%
Building87%
Mechanical21.7%

3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202112
202235
202328
202420
202512
20268

Busiest year on record: 2022, with 35 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
Mandrel Construction Company32024-10-04
Cvm Construction Managers Inc22022-07-12
P. J. Dick Incorporated22025-07-21
Magness & Sons General Contracting Inc12023-01-04
Michael Joseph Macdonald12024-09-11
Moore Energy LLC12024-09-23
Pilot Construction, LLC12025-08-25
The Norwood Company12024-05-23

8 named participants share a resolved project timeline with Swartley Bros Engineers Inc. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
2000-12 S BROAD ST2026-09-17
815 E WASHINGTON LN2026-09-11
3333 S 3RD ST2026-07-30
401-15 N 52ND ST2026-06-22
5750 NEWTOWN AVE2026-04-30
701 S BROAD ST2026-02-25
830 RAMONA AVE2026-01-15
1922-56 N 63RD ST2025-09-08
2275 BRIDGE ST2025-08-25
2042-52 S 56TH ST2025-08-11
2221-25 N BROAD ST2025-07-23
444 N 4TH ST2025-07-23
8700 RIDGE AVE2025-07-21
4735 DUFFIELD ST2025-05-29

88 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
James R Eley Electrical LLC42021–2024
Oliver Sprinkler Co., Inc.32022–2025
Liberty Integrated Solutions, Inc.32021–2024
Klehr Harrison Harvey Branzburg LLP22022–2026
Stephanie Rumer22024–2026
Devine Brothers Inc.22024–2025
Pullman Sst Inc22022–2026
Keegan&Cunnius Plumbing And Mechanical22022–2026

Companies that also appear in Philadelphia permit records at addresses where Swartley Bros Engineers Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

115 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
EP-2026-0076832026-09-17Electrical2000-12 S BROAD STInstalling a new 200amp service from exiting meter bank, including new equipment cabinets for Verizon wireless and antennas on rooftop. All work to be perform according to the 201
EP-2026-0067532026-09-11Electrical815 E WASHINGTON LNINSTALLING A NEW 200 AMP SERVICE FROM EXISTING METER BANK. INSTALL NBEW EQUIPMENT CABINETS FOR VERIZON WIRELESS. INSTALL ANTENNAS ON EXISTING TOWER. All work to be perform a
EP-2026-0047082026-07-30Electrical3333 S 3RD STService Upgrade. Install 3000 amp service w/ all grounding and bonding as per APPROVED DRAWINGS-2017 NEC.
EP-2026-0048522026-06-22Electrical401-15 N 52ND STDisconnect and re-terminate existing power connections serving HVAC units as required. Install new power feeders and associated electrical connections to serve the new HVAC units,
MP-2026-0028892026-05-27Mechanical401-15 N 52ND STFOR THE INSTALLATION OF TWO (2) HVAC APPLIANCES TO SERVE AN EXISTING WIRELESS COMMUNICATIONS ANTENNA EQUIPMENT SPACE WITHIN THE CHURCH STEEPLE. ALL WORK TO BE DONE PER APPROVED PLA
EP-2026-0036302026-04-30Electrical5750 NEWTOWN AVEINSTALL NEW 200 AMP SERVICE FROM EXISTING METER BANK INSTALL NEW EQUIPMENT CABINETS FOR VERIZON WIRELESS INSTALL ANTENNAS ON EXISTING TOWER
EP-2025-0120072026-02-25Electrical701 S BROAD STINSTALL NEW 200 AMP SERVICE FROM EXISTING METER BANK INSTALL NEW EQUIPMENT CABINETS FOR VERIZON WIRELESS INSTALL NEW 30KW PROPANE GENERATOR INSTALL ANTENNAS ON EXISTING TOWER .PER
EP-2025-0120062026-01-15Electrical830 RAMONA AVEInstall a new 200-amp electrical service from the existing meter bank. Install new equipment cabinets for Verizon Wireless. Install a new 30 kW propane generator. Install antennas
EP-2025-0079082025-09-08Electrical1922-56 N 63RD STAdding receptacles for plug-in window A/C units, and replacing existing main distribution panel as per 2017 NEC.
EP-2025-0062532025-08-25Electrical2275 BRIDGE STINSTALL WIRING, LIGHTING, LIGHTING CONTROLS, EXIT SIGNS, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS, INSTALL DEDICATED BRANCH CIRCUITS FOR ELECTRICAL EQUIPMENT AND HVAC. INSTALL T
EP-2025-0076952025-08-11Electrical2042-52 S 56TH STElectrical Permit for combo CP-2025-000413
CP-2025-0004132025-08-08Building2042-52 S 56TH STFOR CONCRETE WORK TO ACCOMMODATE NEW ELECTRICAL EQUIPMENTS. WORK TO BE COMPLETED PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WO
EP-2025-0054452025-07-23Electrical2221-25 N BROAD STNEW AT&T WIRELESS ON EXISTING BUILDING INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO AT&T BTS & BATTERY CABINET INSTALL CONDUITS FROM AT&T SITE LOCATION
EP-2025-0057832025-07-23Electrical444 N 4TH STINSTALL NEW 200 AMP SERVICE FOR AT&T FROM EXISTING HOUSE POWER INSTALL NEW FIBER PATH FROM EXISTING BUILDING DEMARK ROOM TO SITE LOCATION INSTALL NEW AT&T EQUIPMENT ON ROOFTOP STEE
EP-2025-0042782025-07-21Electrical8700 RIDGE AVEInstall Lighting panel, receptacles, and 200 amp service as per 2017 NEC.
EP-2025-0024792025-05-29Electrical4735 DUFFIELD STAdding (6) 20' LED parking lot lights and a 100a 120/240V electrical panel. (ZP-2023-006591) -- the site lighting was included on the approved zoning permit -2017 NEC.
EP-2024-0115542025-05-20Electrical3800 WYALUSING AVESwap existing antennas, add RRUs, add coax cables, swap cabinets on the existing concrete pad, add new 150A P2 breaker. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 N
EP-2025-0022772025-04-30Electrical1100-40 E ERIE AVEINSTALLATION OF ROOFTOP MOUNTED 866.32KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER PLANS.
EP-2024-0082552025-03-31Electrical4050 MAIN STINSTALLATION OF VOICE FIRE ALARM SYSTEM. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
EP-2024-0072122025-02-13Electrical4401 CLARISSA STInstalling 400A service & two (2) gang meter bank , equipment cabinets ,all related grounding and bonding ,generator. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC
EP-2024-0103592024-12-10Electrical5450 WISSAHICKON AVEINSTALL 200 AMP SERVICE FROM EXISTING METER BANK INSTALL NEW EQUIPMENT CABINETS FOR VERIZON WIRELESS INSTALL NEW 30KW PROPANE GENERATOR INSTALL ANTENNAS ON EXISTING TOWER INSTALLAT
EP-2024-0097962024-10-17Electrical3601 S BROAD STNEW DISH WIRELESS ON EXISTING BUILDING INSTALL NEW 200 AMP ELECTRIC SERVICE INSTALL WIRING FROM PPC CABINET TO DISH BTS CABINET INSTALL CONDUITS FROM DISH LOCATION ON ROOF TO EXISI
EP-2024-0099612024-10-17Electrical4900-40 FRANKFORD AVENEW DISH WIRELESS ON EXISTING BUILDING INSTALL NEW 200 AMP ELECTRICAL SERIVCE INSTALL WIRING FROM PPC CABINET TO DISH BTS CABINET INSTALL CONDUITS FROM DISH SITE LOCATION ON ROOF T
EP-2024-0095522024-10-09Electrical8700 RIDGE AVEDemo existing lighting and install lighting, lighting controls and emergency , exit lighting . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
EP-2024-0089012024-10-04Electrical2830 N AMERICAN STFURNISH & INSTALL (2) FEED FROM EXISTING MDP IN BOILER ROOM OVER TO NEW TRAILERS FURNISH & INSTALL STEP DOWN TRANSFORMERS AS NEEDED TO FEED THE TRAILER PANELS PROVIDE ANY SUPPORTS
EP-2024-0070312024-10-04Electrical3711 SEPVIVA STFurnish and install 3000 amp switchgear, new panels, transformers, and disconnects. Install lighting, lighting controls, and receptacles. Furnish and install empty conduits for d
EP-2024-0082492024-09-23Electrical2727 COMMERCE WAYFURNISH & INSTALL A NEW PECO TRANSFORMER TO FEED A NEW 3000 AMP SERVICE, A 1600 AMP SWITCH BOARD, (2) 600 AMP DISCONNECTS, (7) 200 AMP DISCONNECTS FOR SOLAR INVERTERS. 1600 AMP ATS
EP-2024-0078262024-09-11Electrical8500 ESSINGTON AVEINSTALL (1) EQUIPMENT CABINET INSTALL (2) BATTERY CABINETS ON (1) PROPOSED 16'X11"X12'-4" EQUIPMENT PLATFORM INSTALL (1) H-FRAME WITH (1) 2OO AMP PPC, (2) HOFFMAN ENCLOSURES, (1) F
EP-2024-0074792024-09-11Electrical3711 SEPVIVA STInstall Fire Alarm devices and wiring -2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
EP-2024-0038232024-06-05Electrical2950 E TIOGA STINSTALL NEW 200 AMP SERVICE FROM EXISTING METER BANK INSTALL NEW EQUIPMENT CABINETS FOR VERIZON WIRELESS INSTALL NEW 30KW PROPANE GENERATOR INSTALL ANTENNAS ON EXISTING TOWER INSTA
EP-2024-0005222024-05-23Electrical4050 MAIN STProvide 600 amp service, lighting, telecommunication, receptacles, and power to equipment in existing building as per 2017 NEC.
MP-2024-0019982024-05-17Mechanical1401-35 S 16TH STFOR INSTALATION OF A NATURAL GAS GENERATOR AT CELL SITE WITH ASSOCIATED BOOSTER PUMP.
EP-2024-0034562024-05-02Electrical1401-35 S 16TH STADD NEW 30KW GENERATOT TO EXISTING AT&T SITE NEW CONDUITS & WIRING FROM EXISTING AT&T SHELTER TO NEW GENERATOR LOCATION NEW 30 KW GENERATOR WILL BE NG NEW BOOSTER PUMP FOR NG FEED
EP-2024-0029862024-04-22Electrical4259 RICHMOND STREMOVE THE EXISTING WALL LIGHT FIXTURES & CIRCUITING. INSTALL (12) NEW CANOPY LIGHT FIXTURES & TIME CLOCK. INSTALL (3) NEW OUTDOOR HEATERS. ALL WORK IN ACCORDANCE WITH THE 2017 NEC
CP-2024-0017462024-04-09Building1401-35 S 16TH STFOR THE ERECTION OF CONCRETE PAD FOR PROPOSED GENERATORS. SEPARATE PERMITS REQUIRED FOR ANY MEP WORK.
EP-2024-0023942024-03-14Electrical2520-26 W SEDGLEY AVEADD NEW DISH WIRELESS ON EXISTING BUILDING INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO DISH BTS CABINET INSTALL CONDUITS FROM DISH SITE TO EXISTING UT
EP-2024-0023652024-03-14Electrical5450 WISSAHICKON AVEADDING NEW DISH WIRELESS SERVICE ON EXISTING BUILDING INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO DISH BTS CABINET INSTALL CONDUITS FROM DISH SITE LOC
EP-2024-0025792024-03-14Electrical2628-44 MARTHA STNEW AT&T WIRELESS ON EXISTING BUILDING INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO AT&T BTS CABINET INSTALL CONDUITS FROM AT&T SITE LOCATION ON ROOF T
EP-2023-0118462024-02-05Electrical440 N BROAD STELECTRIC:CRAC replacement installation and controls. -2017 nec. FP-2022-000550: Issued (Commercial - Addition and/or Alterations) 440 N BROAD ST # 101, Philadelphia, PA 19130-409
EP-2023-0119332024-01-24Electrical17-23 S 52ND STINSTALL CONDUIT RUNS AS NEEDED INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO DISH EQUIPMENT CABINETS PROVIDE ABOVE GROUND CONDUIT PATH FOR POWER AND FIB
EP-2023-0114332023-12-01Electrical3521-35 MARKET STNEW DISH WIRELESS SITE ON EXISTING BUILDING INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO DISH BTS CABINET INSTALL CONDUITS FROM DISH SITE LOCATION ON R
EP-2023-0076442023-10-19Electrical5141-53 BELFIELD AVEINSTALL A 200 AMP 1 PHASE SERVICE, (2) GANG METER BANK, (1) 200 AMP SERVICE RATED NEMA 3R CIRCUIT BREAKER, 200 AMP 1 PHASE ATS, 150 AMP FEEDER FROM THE EXISTING GENERATOR. INSTALL
EP-2023-0092762023-09-27Electrical444 N 4TH STInstall conduit runs as needed. Install new 200-amp electrical service. Install wiring from PPC cabinet to Dish equipment/cabinets. Provide above ground conduit path for power and
EP-2023-0088092023-09-14Electrical22-34 S 17TH STINSTALL 3 NEW ANTENNA AND 6 RADIO HEADS ON EXISTING STRUCTURE INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO ENERSYS CABINET PROVIDE ABOVE GROUND CONDUIT
EP-2023-0085902023-09-07Electrical6100 HENRY AVEINSTALL 3 NEW ANTENNA AND 6 RADIO HEADS ON EXISTING STRUCTURE INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO ENERSYS CABINET PROVIDE TRENCHING OR ABOVE G
EP-2023-0073142023-08-07Electrical2929 ARCH STINSTALL 3 NEW ANTENNA AND 6 RADIO HEADS ON EXISTING STRUCTURE INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINT TO ENERSYS CABINET PROVIDE TRENCHING OR ABOVE GR
EP-2023-0069652023-07-26Electrical4401 HOLDEN STINSTALL NEW CONDUIT AND WIRING FROM STREET TO EXISTING BUILDING FOR T-MOBILE 200 AMP SERVICE EXISTING SERVICE TO HIGH RISE WAS TURNED OFF BY LANDLORD AND T-MOBILE NEEDS TO RE-POWE
EP-2023-0041972023-07-24Electrical2275 BRIDGE STINSTALL A 225 AMP / 480V / 3 PHASE DELTA PANEL & FEEDER. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES & SENSORS. INSTALL RECEPTACLES & HAND DRYERS. PROVIDE POWER FOR THE MECHANICAL
EP-2023-0066952023-07-24Electrical7600 E ROOSEVELT BLVDINSTALL 3 NEW ANTENNAE AND 6 RADIO HEADS ON THE EXISTING STRUCTURE INSTALL NEW 200 AMP ELECTRICAL SERVICE INSTALL WIRING FROM PPC CABINET TO ENERSYS CABINET PROVIDE TRENCHING OR AB
EP-2023-0045882023-07-14Electrical2275 BRIDGE STINSTALL NEW SPEAKER / STROBES, STROBES & PULL STATIONS ON THE 3RD FLOOR. THE NEW 3RD FLOOR FIRE ALARM DEVICES ARE CONNECTED TO THE EXISTING BUILDING FIRE ALARM VOICE EVCUATION SYST

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Search these records

The 115 permits above are a static record through 2026. Select a year above to open that year’s records, or search Swartley Bros Engineers Inc in Philadelphia, PA by address, trade or date range.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.