COMPANY RECORD · NEW YORK, NY

Vital Plumbing, Inc — permit history in New York, NY

Vital Plumbing, Inc appears on 92 New York permit records from 2020 through 2026, most often plumbing (63% of the record).

Permit categories

CategoryPermitsShare
Plumbing5863%
General construction1415.2%
Fire protection1213%
Mechanical / HVAC88.7%

4 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20207
20213
20221
20239
202410
202535
202627

Busiest year on record: 2025, with 35 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Adam's European Contracti112026-08-07
Roma Scaffolding Inc42026-04-14
Mac Contractor Inc32026-05-22
The Outfit M&J LLC22024-02-20
Ansu Construction Inc22025-05-09
Floracon LLC22023-11-16
Neelam Construction Corp22025-04-15
Musa Builder Corp12023-07-28
Spencer Contracting, LLC12023-11-17
Sampson Laurier Williams12026-07-10
Om General Contractors Co12026-04-24
Northeast Atlantic Busine12024-04-03

23 companies are named alongside Vital Plumbing, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
500 19 STREET2026-08-20
780 POST AVENUE2026-08-07
4011 FILLMORE AVENUE2026-07-10
400 EMPIRE BOULEVARD2026-06-11
2420 CROTONA AVENUE2026-05-22
1951 ARTHUR KILL ROAD2026-05-19
1951A ARTHUR KILL ROAD2026-05-15
500 MACON STREET2026-04-24
231 OSBORN STREET2026-04-14
25 GREENLEAF AVENUE2026-04-09
195 NAGLE AVENUE2026-02-04
3736 10 AVENUE2026-02-04
3716 10 AVENUE2026-02-03
3798 10 AVENUE2025-12-18

54 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,796,600, median $100,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

92 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
B01069859-I1-PL2026-08-20Plumbing500 19 STREETInstallation of storm drainage including storm inlet, cleanout, and piping to connect to existing catch basin. No change to use, egress, or occupancy.$75,000
S01073279-S3-PL2026-08-07Plumbing780 POST AVENUEP.S. 019-R: Installation of two (2) roof drains & associated piping on new connection bridge link structure. New water service into basement level for local sprinkler system, and d$2,000
S01073279-S4-EW-SP2026-08-07Fire protection780 POST AVENUEP.S. 019-R: NEW SPRINKLER HEADS (WATER CURTAIN) AT DOORS CONNECTING TO 25 GREENLEAF AVENUE AND REPLACEMENT OF EXISTING SPRINKLER HEADS WITH NEW 1 PIPING IN BASEMENT AND FIRST FLOOR$510,000
B01153643-S1-PL2026-07-10Plumbing4011 FILLMORE AVENUEUpgrade of Classroom 308 to a Science Lab Classroom with required plumbing fixtures. The interior alteration also consists of the replacement of water closet, lavatory, and associa$116,010
B00779536-S4-EW-SP2026-06-11Fire protection400 EMPIRE BOULEVARDWork includes per the filed plans replace three (3) sprinkler heads and remove eleven (11) sprinkler heads.$8,000
X01121593-S1-PL2026-05-22Plumbing2420 CROTONA AVENUEINSTALLATION OF: 1). NEW EXTERIOR DRINKING FOUNTAIN AND ASSOCIATE PIPING, SUMP, ETC AND 2). NEW STORM DRAINAGE PIPING AND STRUCTURES, INCLUDING NEW DRAIN BELOW STAIR LIFT. NO C$45,500
X01121593-S3-PL2026-05-22Plumbing2420 CROTONA AVENUEProvide cold water piping and double check valve assembly for drinking foundation outside of building.$20,000
S01093843-I1-PL2026-05-19Plumbing1951 ARTHUR KILL ROADProvide sump pumps and associated discharge piping and valves. Provide water service backflow preventer, hose bibbs and wall hydrants for washdown, service sink, roof drains.$379,592
S01093861-I1-PL2026-05-15Plumbing1951A ARTHUR KILL ROADProvide water service backflow preventer, hose bibbs and wall hydrants for washdown, water heater for potable water, toilet/lavatory fixtures, service sink, sanitary floor drains, $109,336
B01020411-S1-PL2026-04-24Plumbing500 MACON STREETRemove drinking fountain and install new drinking fountain. See comments for PAA description$116,000
B00795006-S1-PL2026-04-14Plumbing231 OSBORN STREETInstallation of area drains and connecting 19 LF of cast iron pipe to an existing stormwater pipe.$4,900
S01075004-S6-PL2026-04-09Plumbing25 GREENLEAF AVENUEP.S. 019-R: GENERAL PLUMBING WORK TYPE FOR A NEW 3 STORY SCHOOL BUILDING.$0
X00980512-S2-PL2026-03-30Plumbing2420 CROTONA AVENUEREMOVAL / DEMOLITION OF EXISTING STORM DRAINAGE (PIPING, STRUCTURES, ETC) AT EX PLAYYARD. PROVIDE NEW STORM DRAINAGE (PIPING, STRUCTURES, ETC) AT RENOVATED PLAYYARD.$163,590
S01075004-S9-EW-SD2026-03-26Fire protection25 GREENLEAF AVENUEP.S. 019R: SPRINKLER AND STANDPIPE WORK TYPES FOR A NEW 3 STORY SCHOOL BUILDING.$0
S01075004-S7-PL2026-03-26Plumbing25 GREENLEAF AVENUEP.S. 019-R: UNDERGROUND PLUMBING WORK TYPE FOR A NEW 3 STORY SCHOOL BUILDING.$0
S01075004-S9-EW-SP2026-03-26Fire protection25 GREENLEAF AVENUEP.S. 019R: SPRINKLER AND STANDPIPE WORK TYPES FOR A NEW 3 STORY SCHOOL BUILDING.$0
S01075004-S5-PL2026-03-26Plumbing25 GREENLEAF AVENUEP.S. 019-R: SUBSEQUENT FILING OF CIVIL-PLUMBING WORK TYPE.$0
B00779536-S3-PL2026-03-12Plumbing400 EMPIRE BOULEVARDRemoval of entire gas piping within the building. Provide electric heat pump system, replace roof drains, area drains, fixtures and associated piping.Partial removal and replacemen$368,997
M00691891-I1-GC2026-02-04General construction195 NAGLE AVENUENYCHA BOILER -Dyckman. Building3: Architectural work to include Sealant, firestopping, patching, wall repairs in rellation to Boiler replacement as per plans filed herewith.$100,000
M00688332-I1-GC2026-02-04General construction195 NAGLE AVENUENYCHA Boilers Dyckman: Building 3: Site/Civil work as per plans filed herewith. No change to use, egress or occupancy.$100,000
M00691955-I1-MS2026-02-04Mechanical / HVAC195 NAGLE AVENUENYCHA Boilers: Dyckman Building3: Mechanical work in association with Boiler Replacement as per plans filed herewith. No change to use, egress or occupancy.$100,000
M00691989-I1-MS2026-02-04Mechanical / HVAC3736 10 AVENUENYCHA Boilers: Dyckman: Building Building4: Mechanical work associated with boiler replacement as per plans filed herewith.$100,000
M00688335-I1-GC2026-02-04General construction3736 10 AVENUENYCHA BOILERS Dyckman Building 4: : Civil/Site work in relation to boiler replacement as per plans filed herewith.$100,000
M00691905-I1-GC2026-02-04General construction3736 10 AVENUENYCHA Boiler: Dyckman: Building 4: Architectural work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith$100,000
M00691981-I1-MS2026-02-03Mechanical / HVAC3716 10 AVENUENYCHA Boilers: Dyckman Building 2: Mechanical work in reference to boiler replacement as per plans filed herewith.$100,000
M00691900-I1-GC2026-02-03General construction3716 10 AVENUENYCHA Boiler- Dyckman: Building 2: General Construction work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith$100,000
M00688334-I1-GC2026-02-03General construction3716 10 AVENUENYCHA BOILERS Dyckman: Building 2: Site/Civil work in relation to boiler replacement as per plans filed herewith$100,000
M00636179-I1-PL2025-12-18Plumbing3798 10 AVENUENYCHA BOILER -Dyckman. Building 8: Plumbing work in relation to boiler replacement as per plans filed herewith.$100,000
M00691924-I1-GC2025-12-17General construction3798 10 AVENUENYCHA Boilers Dyckman: Building8; General Construction associated with boiler replacement as per plans filed herewith.$100,000
M00692472-I1-MS2025-12-17Mechanical / HVAC3798 10 AVENUENYCHA Boiler Dyckman: Building 8 Mechanical work in association with boiler replacement as per plans filed herewith.$100,000
M00688340-I1-GC2025-12-16General construction3798 10 AVENUENYCHA BOILERS Dyckman: Building8: Civil/Site work as per plans filed herewith. No change to use, egress or occupancy.$100,000
M00688327-I1-GC2025-12-11General construction177 NAGLE AVENUENYCHA BOILER -Dyckman: Building 1. Civil/Site work in relation to boiler replacement as per plans filed herewith$20,000
M00691814-I1-GC2025-12-11General construction177 NAGLE AVENUENYCHA BOILER -Dyckman. Building 1: General Construction associated with boiler replacement as per plans filed herewith.$100,000
M00691949-I1-MS2025-12-11Mechanical / HVAC177 NAGLE AVENUENYCHA Boilers: Dyckman: Building 1: Mechanical work in relation to boiler replacement as per plans filed herewith. Replacing exhaust fan and adding a steam unit heater$100,000
M00691911-I1-GC2025-12-10General construction3758 10 AVENUENYCHA Boilers: Dyckman: Building 6: General Construction in relation to boiler replacement as per plans filed herewith. No change to use, egress or occupancy.$100,000
Q01040916-S2-PL2025-11-12Plumbing46-02 47 AVENUEQ125- remove existing sump pump in ash hoist pit, pipe hatch drain to sump pump in Secure Storage room, and replace pump sp-1 in General Storage room$17,790
M00692461-I1-MS2025-09-11Mechanical / HVAC3758 10 AVENUENYCHA Boilers: Dyckman Building 6: Mechanical work in association with boiler replacement as per plans filed herewith.$100,000
M00688336-I1-GC2025-09-11General construction3758 10 AVENUENYCHA BOILERS Dyckman; Building 6: Site/Civil Work in relation to boiler replacement as per plans filed herewith.$100,000
M00691896-I1-GC2025-09-02General construction213 NAGLE AVENUENYCHA BOILER -Dyckman. Building 5: General construction in relation to boiler replacement as per plans filed herewith.$100,000
M00688333-I1-GC2025-08-22General construction213 NAGLE AVENUENYCHA BOILERS Dyckman: Building 5: Site/Civil work in relation to boiler replacement as per plans filed herewith$100,000
M00635122-I1-PL2025-08-21Plumbing213 NAGLE AVENUENYCHA BOILER -Dyckman. BUILDING 5: PLUMBING WORK IN RELATION TO BOILER REPLACEMENT AS PER PLANS FILED HEREWITH$40,000
M00691973-I1-MS2025-08-21Mechanical / HVAC213 NAGLE AVENUENYCHA Boilers: Dyckman Building 5: Mechanical work associated with Boiler replacement as per plans filed herewith.$100,000
M00636081-I1-PL2025-08-05Plumbing3758 10 AVENUENYCHA DYCKMAN BOILERS:Building 6: Plumbing work in relation to boiler replacement as per plans filed herewith.$100,000
M00625536-I1-PL2025-08-05Plumbing177 NAGLE AVENUENYCHA BOILER -Dyckman. Building 1: Plumbing work in relation to boiler replacement as per plans filed herewith,.$100,000
M00635133-I1-PL2025-08-05Plumbing3736 10 AVENUENYCHA BOILERS: Dyckman: Building 4. Plumbing work in relation to boiler replacement as per plans filed herewith.$100,000
M00635128-I1-PL2025-08-01Plumbing3716 10 AVENUENYCHA BOILERS: DYCKMAN. BUILDING 2: PLUMBING WORK IN RELATION TO BOILER REPLACEMENT AS PER PLANS FILED HEREWITH.$100,000
M00635119-I1-PL2025-08-01Plumbing195 NAGLE AVENUENYCHA BOILER -Dyckman. Building 3: Plumbing work in relation to boiler replacement as per plans filed herewith.$100,000
S01093787-I1-PL2025-07-29Plumbing345B MERSEREAU AVENUEProvide water service backflow preventer, hose bibbs and wall hydrants for washdown, water heater for potable water, toilet/lavatory fixtures, service sink, sanitary floor drains, $151,218
M00636163-I1-PL2025-07-25Plumbing3784 10 AVENUENYCHA BOILERS DYCKMAN; BUILDING 7: PLUMBING WORK IN RELATION TO BOILER REPLACEMENT AS PER PLANS FILED HERWITH.$100,000
B00699197-S4-EW-SP2025-07-10Fire protection3117 AVENUE WSPRINKLER-STANDPIPE WORK AT NEW STAIR AND ELEVATOR ADDITION.$15,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →