COMPANY RECORD · NEW YORK, NY
Tmg Construction Corp — permit history in New York, NY
Tmg Construction Corp appears on 78 New York permit records from 2019 through 2026, most often general construction (64.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 51 | 64.6% |
| Mechanical / HVAC | 28 | 35.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 6 |
| 2022 | 11 |
| 2023 | 13 |
| 2024 | 18 |
| 2025 | 15 |
| 2026 | 13 |
Busiest year on record: 2024, with 18 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Alan J Brutosky Plbr Cont | 9 | 2026-06-23 |
| Allstate Sprinkler LLC | 3 | 2026-06-12 |
| Amn Plumbing Corp | 2 | 2026-07-23 |
| Allstate Sprinkler Corp | 1 | 2022-05-11 |
| Arco Plbg And Htg Inc | 1 | 2026-06-10 |
| Bedrock Plbg. & Htg., Inc | 1 | 2026-03-02 |
| Capitol Fire Sprinkler Co | 1 | 2025-05-05 |
| F.S. Site Corp | 1 | 2025-12-01 |
| Mcl Ny Industries Corp | 1 | 2024-07-17 |
9 companies are named alongside Tmg Construction Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 575 SIXTH AVENUE | 2026-08-25 |
| 655 SIXTH AVENUE | 2026-07-27 |
| 30 MAIN STREET | 2026-06-02 |
| 51 GREENE STREET | 2026-06-01 |
| 95 GREENE STREET | 2026-05-19 |
| 1003 MADISON AVENUE | 2026-04-02 |
| 189 COLUMBUS AVENUE | 2026-02-26 |
| 120 WEST 18 STREET | 2026-02-05 |
| 1070 PARK AVENUE | 2025-11-06 |
| 1268 MADISON AVENUE | 2025-11-05 |
| 462 BROOME STREET | 2025-08-06 |
| 21 ORCHARD STREET | 2025-07-02 |
| 154 NORTH 7 STREET | 2025-05-14 |
| 1121 MADISON AVENUE | 2025-04-08 |
45 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $9,979 to $1,250,008, median $75,200. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
78 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01420736-I1-MS | 2026-08-25 | Mechanical / HVAC | 575 SIXTH AVENUE | Mechanical changes to retail space on part of the cellar as indicated on drawings. | $42,867 |
| M01420509-I1-GC | 2026-08-13 | General construction | 575 SIXTH AVENUE | Architectural work to retail space on part of the cellar level as indicated on drawings. | $89,469 |
| M01406249-I1-GC | 2026-07-27 | General construction | 655 SIXTH AVENUE | New partitions and flooring. No work in existing bathroom. No change of use, egress, or occupancy. All work is in the commercial space only. The space is currently vacant. | $30,000 |
| B01268976-I1-GC | 2026-06-02 | General construction | 30 MAIN STREET | Modification of interior partitions and finishes to accommodate the apartment combination on partial 12th floor in the existing building. No change to zoning, use, egress or occup | $1,250,008 |
| B01268976-S1-MS | 2026-06-02 | Mechanical / HVAC | 30 MAIN STREET | HVAC modifications to ductwork, piping and equipment to accommodate the apartment combination on partial 12th floor in the existing building. No change to zoning, use, egress or o | $249,999 |
| M01345564-S1-MS | 2026-06-01 | Mechanical / HVAC | 51 GREENE STREET | HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS. | $30,000 |
| M01378836-I1-GC | 2026-05-19 | General construction | 95 GREENE STREET | INTERIOR RENOVATION OF EXISTING 3RD FL APARTMENT (UNIT 3D). NON-STRUCTURAL PARTITION WORK, KITCHEN & BATH RENOVATIONS, NEW LIGHTING, MISC. MILLWORK. NO CHANGE TO USE, EGRESS, OR OC | $192,500 |
| M01273686-I1-MS | 2026-04-02 | Mechanical / HVAC | 1003 MADISON AVENUE | Installation of mechanical HVAC system, ventilation duct work. Mechanical scope only. | $30,000 |
| M01345390-I1-GC | 2026-02-26 | General construction | 189 COLUMBUS AVENUE | General construction related to the renovation of an existing retail space (chocolate store) in the cellar and first floor. No change to use, egress, or occupancy. | $189,000 |
| M01345390-S2-MS | 2026-02-19 | Mechanical / HVAC | 189 COLUMBUS AVENUE | Mechanical work related to the renovation of an existing commercial space in the cellar and first floor. | $94,500 |
| M01345564-I1-GC | 2026-02-13 | General construction | 51 GREENE STREET | RENOVATION OF COMMERCIAL SPACE (FRAME.) INSTALLATION OF NEW INTERIOR PARTITIONS AND CEILINGS, NEW FIXTURES,FURNTURE AND DOORS. REMOVE BATHROOM ON 1ST FLOOR. NEW ACCESSIBLE TOILET | $100,000 |
| M01327913-I1-GC | 2026-02-05 | General construction | 120 WEST 18 STREET | General construction of tenant retail space including installation of non-load bearing partitions and related finishes. No change in use, egress or occupancy. | $109,998 |
| M01327913-S1-MS | 2026-02-05 | Mechanical / HVAC | 120 WEST 18 STREET | Modifications to the existing mechanical system per plans filed herewith. No change in use, egress or occupancy. | $35,996 |
| M01327901-I1-GC | 2025-12-18 | General construction | 120 WEST 18 STREET | General construction work as shown on plans. | $27,994 |
| M01189090-I1-GC | 2025-11-06 | General construction | 1070 PARK AVENUE | INTERIOR WORK IN APARTMENT/PENTHOUSE E, PARTITIONS Modification, patch floor/ceilings. NO CHANGE TO USE, OCCUPANCY OR EGRESS is proposed under this application. Subsequent plumbin | $197,000 |
| M01282042-S2-MS | 2025-11-05 | Mechanical / HVAC | 1268 MADISON AVENUE | Mechanical work related to the renovation of an existing commercial space on the first floor. | $32,997 |
| M01282042-I1-GC | 2025-10-15 | General construction | 1268 MADISON AVENUE | General construction related to the renovation of an existing commercial space on the first floor. | $61,500 |
| M01273271-I1-GC | 2025-08-27 | General construction | 1003 MADISON AVENUE | Interior work on existing commercial space. Architectural/ construction work only. | $98,175 |
| M01244934-S1-MS | 2025-08-06 | Mechanical / HVAC | 462 BROOME STREET | INSTALLATION OF NEW SPLIT HEAT PUMP SYSTEM AND ASSOCIATED PIPING AND DUCTWORK AS PER THE DRAIWNGS FILED HEREIN. | $30,000 |
| M01244934-I1-GC | 2025-08-06 | General construction | 462 BROOME STREET | INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS AND FLOOR AND WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. N | $400,000 |
| M01123105-I1-GC | 2025-07-02 | General construction | 21 ORCHARD STREET | GENERAL CONSTRUCTION FOR TENANT-FIT-OUT RENOVATIONS OF 1ST FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $175,000 |
| B01201973-I1-GC | 2025-05-14 | General construction | 154 NORTH 7 STREET | MODIFICAITON OF INTERIOR PARTITION AND FINISHES ALONG WITH A CHANGE OF USE AT THE 1ST FLOOR TO ACCOMMODATE NEW RETAIL USE AS PER PLANS. | $200,000 |
| M01175777-I1-GC | 2025-04-08 | General construction | 1121 MADISON AVENUE | HEREWITH FILING FOR RETAIL RENOVATIONS AT THE CELLAR AND 1ST FLR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $500,000 |
| M01175777-S1-MS | 2025-03-27 | Mechanical / HVAC | 1121 MADISON AVENUE | HEREWITH FILING MECHANICAL MODIFICATIONS IN CONJUNCTION WITH INTERIOR RETAIL RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $70,194 |
| M01130543-I1-GC | 2025-03-10 | General construction | 168 MERCER STREET | General renovation including storefront and facade work for 1st floor retail space in an existing 5-story building with basement and storage room. No change to bulk, occupancy, use | $54,026 |
| M01145731-S1-MS | 2025-01-10 | Mechanical / HVAC | 1121 MADISON AVENUE | HEREWITH FILING MECHANICAL REMOVALS ON THE 1ST FLR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $15,000 |
| M01145731-I1-GC | 2025-01-08 | General construction | 1121 MADISON AVENUE | HEREWITH FILING FOR SOFT INTERIOR DEMOLITION ON THE CELLAR AND 1ST FLR RETAIL SPACE PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $25,000 |
| B01141806-I1-GC | 2025-01-06 | General construction | 232 COURT STREET | GENERAL CONSTRUCTION FOR LIMITED INTERIOR TENANT-FIT-OUT RENOVATIONS OF EXISTING 1ST FLOOR RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $140,000 |
| M01104638-I1-GC | 2024-12-20 | General construction | 29 EAST 64 STREET | Filing to renovate existing bathroom at Apt 5D as per plans submitted herewith. No change in use, egress, or occupancy under this application. | $35,000 |
| M01109567-I1-GC | 2024-12-18 | General construction | 168 MERCER STREET | General Interior renovation at partial basement & ground floor (retail space) in an existing 5 story w/ basement & cellar building. No change to bulk, occupancy, use, or egress | $685,635 |
| M01122831-I1-GC | 2024-11-08 | General construction | 21 ORCHARD STREET | GENERAL CONSTRUCTION FOR MINOR INTERIOR DEMO WORK AT 1ST FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $15,000 |
| M01120684-I1-MS | 2024-10-10 | Mechanical / HVAC | 168 MERCER STREET | New ductwork distribution. (Existing terminal equipment, toilet exhaust, and outdoor air systems are to remain.) | $247,585 |
| M01106192-I1-GC | 2024-10-08 | General construction | 1005 MADISON AVENUE | Interior renovations of existing Use Group 6 space for VINCE. No change of use, egress or occupancy under this application. | $400,000 |
| M01109829-I1-GC | 2024-10-08 | General construction | 1005 MADISON AVENUE | 8848 - Ductwork and Lighting modifications for VINCE space. No change of use, egress or occupancy under this application. | $150,000 |
| M01032952-I1-GC | 2024-09-30 | General construction | 205 COLUMBUS AVENUE | GENERAL CONSTRUCTION FOR EXTERIOR STOREFRONT RENOVATIONS OF COMMERCIAL SPACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $10,000 |
| M01062722-I1-GC | 2024-08-27 | General construction | 979 3 AVENUE | FILING INTERIOR IMPROVEMENTS FOR A NEW RETAIL STORE. THE PROJECT INCLUDES WORK ON THE GROUND FLOOR OF AN EXISTING BUILDING. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS. | $180,000 |
| M01062791-I1-MS | 2024-08-27 | Mechanical / HVAC | 979 3 AVENUE | FILING FOR REMOVAL OF EXISTING DUCTWORK, EQUIPMENT, ASSOCIATED PIPING,AIRSIDE DISTRIBUTION FROM TWO (2)NEW VRF EVAPORATOR UNITS AND CONDENSERS WITH ELECTRICAL RESISTIVE HEATING SYS | $40,000 |
| M01059233-S1-MS | 2024-06-24 | Mechanical / HVAC | 138 WOOSTER STREET | Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. | $9,979 |
| M01059233-I1-GC | 2024-06-20 | General construction | 138 WOOSTER STREET | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. | $174,996 |
| M01046986-I1-GC | 2024-06-17 | General construction | 130 CEDAR STREET | APPLICATION FILED FOR INTERIOR BUILD OUT OF RESTAURANT AS PER PLANS ATTACHED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY AS A PART OF THIS APPLICATION. FILED IN ACCORDANCEWITH | $396,900 |
| M01032886-I1-GC | 2024-04-30 | General construction | 205 COLUMBUS AVENUE | GENERAL CONSTRUCTION FOR INTERIOR TENANT FIT-OUT RENOVATIONS OF COMMERCIAL SPACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $195,000 |
| M01018354-I1-GC | 2024-03-15 | General construction | 25 WEST 31 STREET | Interior partitions in existing office space. No change of use, egress or occupancy. | $18,000 |
| M01002206-I1-MS | 2024-03-13 | Mechanical / HVAC | 25 WEST 31 STREET | PROVIDE PROVIDE NEW VRF HEAT PUMP SPLIT-SYSTEM UNITS TO SERVE HEATING AND COOLING LOAD AT 10TH FLOOR COMMERCIAL SPACE. PROVIDE BATHROOM, KITCHEN, DRYER EXHAUST AS REQUIRED. | $12,000 |
| M01002278-I1-GC | 2024-02-29 | General construction | 799 MADISON AVENUE | HEREBY FILING FOR THE RENOVATION OF COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $100,000 |
| M00985038-I1-MS | 2024-01-23 | Mechanical / HVAC | 1045 MADISON AVENUE | MECHANICAL WORK LIMITED TO TENANT INTERIOR RENOVATIONS OF EXISTING 1ST FLOOR RETAIL SPACE C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $11,200 |
| M00984968-I1-GC | 2024-01-23 | General construction | 1045 MADISON AVENUE | GENERAL CONSTRUCTION WORK LIMITED TO TENANT INTERIOR RENOVATIONS OF EXISTING 1ST FLOOR RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $209,200 |
| M00840211-I1-GC | 2023-12-20 | General construction | 74 WOOSTER STREET | Installation of a new mezzanine on floor 001 of existing commercial space. Architectural work. There is to be no change of use or occupancy. | $30,000 |
| M00901685-I1-GC | 2023-08-03 | General construction | 74 WOOSTER STREET | Renovation of existing first floor commercial tenant space as per plans. There is no increase in size or change in use, occupancy or egress under this application. | $70,000 |
| M00885199-I1-MS | 2023-07-19 | Mechanical / HVAC | 723 MADISON AVENUE | PROPOSED ALTERATIONS TO MEZZANINE FLOOR. PROVIDE NEW AIR-COOLED SELF-CONTAINED UNIT AND DUCTWORK TO SERVE COOLING AND HEATING. | $25,000 |
| M00894853-I1-MS | 2023-07-14 | Mechanical / HVAC | 980 MADISON AVENUE | HEREBY FILING INSTALLATION OF MECHANICAL EQUIPMENT IN EXISTING COMMERICIAL SPACE. NO CHANGE TO USE OCCUPANCY OR EGRESS. | $30,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
