COMPANY RECORD · NEW YORK, NY
The Franklin Comany Cont — permit history in New York, NY
The Franklin Comany Cont appears on 37 New York permit records from 2022 through 2026, most often general construction (91.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 34 | 91.9% |
| Mechanical / HVAC | 3 | 8.1% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 10 |
| 2023 | 9 |
| 2024 | 12 |
| 2025 | 5 |
| 2026 | 1 |
Busiest year on record: 2024, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 120-15 31 AVENUE | 2026-05-22 |
| 353 SPRING STREET | 2025-08-27 |
| 132-05 ATLANTIC AVENUE | 2025-07-21 |
| 1323 WEST SERVICE ROAD | 2025-05-19 |
| 53-15 58 STREET | 2025-01-30 |
| 151 WEST 100 STREET | 2025-01-07 |
| 73-33 SPRINGFIELD BOULEVARD | 2024-11-26 |
| 64-02 CATALPA AVENUE | 2024-11-26 |
| 94-20 GUY R BREWER BOULEVARD | 2024-11-04 |
| 75-05 DOUGLASTON PARKWAY | 2024-08-11 |
| 127 UTICA AVENUE | 2024-07-10 |
| 8 RANDALLS ISLAND | 2024-05-09 |
| 800 EAST 176 STREET | 2024-03-19 |
| 450 CROSS BRONX EXPRESSWAY | 2024-03-01 |
27 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $2,000,000, median $398,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
37 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01141040-I1-GC-CX | 2026-05-22 | General construction | 120-15 31 AVENUE | EMPTY, PURGE, CLEAN, REMOVE AND DISPOSE OF (1) 4,000-GALLON ETHANOL UST, FUEL ISLAND, ASSOCIATED PIPING AND LEAK DETECTION SYSTEM COMPONENTS. INSTALL (1) 4,000-GALLON RD95B5 UST, F | $1,100,000 |
| M01146658-I1-GC | 2025-08-27 | General construction | 353 SPRING STREET | FILING TO REPLACE EXG FILL PORT SPILL CONTAINER OF (3) 4,000-GAL AND (1)8,000-GAL RENEWABLE DIESEL, (1) 4,000-GAL AND (1) 2,500-GAL GASOLINE, (1) 2,500-GAL HYDRAULIC OIL, AND (1) 2 | $592,500 |
| Q01009468-I1-GC-CX | 2025-07-21 | General construction | 132-05 ATLANTIC AVENUE | EMPTY PURGE, CLEAN, & DISPOSE OF ONE (1) 1,0800-GALON UST & ASSOCIATED PIPING & LEAK DETECTION SYSTEM COMPONENTS. INSTALL ONE (1) 1,000-GALON B5/B20 BIOFUEL UST, & ALL ASSOCIATED | $2,000,000 |
| S01019078-I1-GC | 2025-05-19 | General construction | 1323 WEST SERVICE ROAD | FILING TO REMOVE EXISTING FILL PORT SPILL CONTAINER OF ONE(1)4,000-GAL RENEWABLE DIESEL & ONE(1) 4,000-GAL GASOLINE USTS. FURNISH & INSTALL DOUBLE WALL FILL PORT SPILL CONTAINERS W | $207,000 |
| Q00625391-I1-GC-CX | 2025-01-30 | General construction | 53-15 58 STREET | CLOSE IN-PLACE (1) 2,500-GAL & (1) 1,000-GAL MOTOR VEHICLE UST & REMOVE FUEL ISLAND, PIPING & LEAK DETECTION SYSTEM. INSTALL (2) 4,000-GAL MOTOR VEHICLE USTS, FUEL ISLAND USTS, FUE | $1,200,000 |
| M00913311-I1-GC-CX | 2025-01-07 | General construction | 151 WEST 100 STREET | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1) 4000-GAL GASOLINE UST, (1) FUEL DISPENSER, FIRE SUPPRESSION SYSTEM, CONCRETE FUEL DISPENSING ISLAND & VEEDER ROOT TLS-350R. INSTALL NEW | $1,200,000 |
| Q00733945-I1-ST | 2024-11-26 | General construction | 73-33 SPRINGFIELD BOULEVARD | EMPTY PURGE, CLEAN, & PROPERLY CLOSE IN-PLACE ONE (1) 1,080-GALON UST & ASSOCIATED PIPING & LEAK DETECTION SYSTEM COMPONENTS. INSTALL ONE (1) 1,000-GALON B5/B20 BIOFUEL UST, & AL | $250,000 |
| Q00583089-I1-ST | 2024-11-26 | General construction | 64-02 CATALPA AVENUE | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE (2) 1,000-GAL GASOLINE USTS, FUEL ISLAND, ASSOCIATED PIPING & LEAK DETECTION SYSTEM. INSTALL (2) 1,000-GAL GASOLINE USTS, FUEL ISLAND, ASSOCIA | $750,000 |
| Q00604716-I1-GC-CX | 2024-11-04 | General construction | 94-20 GUY R BREWER BOULEVARD | THIS JOB IS ASSOCIATED WITH JOB Q00400231, Q00400204, Q00400208. | $1,400,000 |
| Q00734423-I1-ST | 2024-08-11 | General construction | 75-05 DOUGLASTON PARKWAY | EMPTY PURGE, CLEAN, & DISPOSE OF ONE (1) 1,0800-GALON UST & ASSOCIATED PIPING & LEAK DETECTION SYSTEM COMPONENTS. INSTALL ONE (1) 1,000-GALON B5/B20 BIOFUEL UST, & ALL ASSOCIATED | $250,000 |
| B00903806-I1-GC-CX | 2024-07-10 | General construction | 127 UTICA AVENUE | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1)4000-GAL GASOLINE UST & CONCRETE FUEL DISPENSING ISLAND. INSTALL NEW (1)4000-GAL DOUBLE-WALL FIBERGLASS GASOLINE UST, (1) NEW FUEL DISP | $850,000 |
| Q01041524-I1-MS | 2024-05-28 | Mechanical / HVAC | 75-05 DOUGLASTON PARKWAY | INSTALLATION OF OIL-FIRED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $60,000 |
| M00810812-I1-GC | 2024-05-09 | General construction | 8 RANDALLS ISLAND | FILING TO REMOVE EXISTING FILL PORT SPILL CONTAINER OF ONE (1) 550-GALL TRANSMISSION FLUID, ONE (1) 550-GALL MOTOR OIL, & ONE (1)1,000-GALL MOTOR OIL UST. FURNISH & INSTALL DOUBLE | $316,750 |
| Q00583089-I1-GC | 2024-04-29 | General construction | 64-02 CATALPA AVENUE | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE (2) 1,000-GAL GASOLINE USTS, FUEL ISLAND, ASSOCIATED PIPING & LEAK DETECTION SYSTEM. INSTALL (2) 1,000-GAL GASOLINE USTS, FUEL ISLAND, ASSOCIA | $750,000 |
| X00584228-I1-ST | 2024-03-19 | General construction | 800 EAST 176 STREET | Demolish & excavate the concrete floor in wash area of Bay#5. Removal of existing 2500 Gal Ethanol UST & associated piping. Install a broom Truck wash & associated drainage piping | $398,000 |
| X00596064-I1-ST | 2024-03-01 | General construction | 450 CROSS BRONX EXPRESSWAY | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1) 4,000-GAL GASOLINE UST, FUEL DISPENSER. REMOVE CONCRETE SLAB, CONCRETE FUEL DISPENSING ISLAND. INSTALL (1) 4,000-GAL DOUBLE WALL FIBER | $1,094,000 |
| Q00400208-I1-MS | 2024-01-23 | Mechanical / HVAC | 94-20 GUY R BREWER BOULEVARD | INSTALLING ALL ASSOCIATED FUEL OIL PIPING, PUMP SETS ASSOCIATED WITH Q00400204. | $1,400,000 |
| X00641623-I1-GC-CX | 2024-01-09 | General construction | 1160 OGDEN AVENUE | EXCAVATE (1) 3,000-GALLON DIESEL UST, (1) FUEL DISPENSER, AND VR TLS-350R. INSTALL (1) 3,000-GALLON DWFRP B5/B20 BIODIESEL UST, (1) FUEL DISPENSER, PIPING, AND ONE (1) VR TLS-450P | $650,000 |
| B00584668-I1-ST | 2023-12-20 | General construction | 2820 SNYDER AVENUE | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1) 4000-GAL GASOLINE UST, CONCRETE DISPENSING ISLAND. REPLACE-IN-KIND NEW (1) 4000-GAL GASOLINE & (1) 4,000-GAL GASOLINE DOUBLE WALL FIBER | $812,000 |
| B00732328-I1-GC-CX | 2023-11-28 | General construction | 554 WINTHROP STREET | EMPTY PURGE, CLEAN REMOVE & DISPOSE OF ONE (1) 2,500-GALON UST & ASSOCIATED PIPING & COMPONENTS. INSTALL IN-KIND ONE (1) NEW 2,500-GALON BIODIESEL MOTOR FUEL UST, PIPING FILLBOXES, | $814,000 |
| X00641478-I1-GC-CX | 2023-10-03 | General construction | 2417 WEBSTER AVENUE | CLOSE IN-PLACE (1) 1K GAL DIESEL UST & REMOVE (1) PREVIOUSLY CIP 3K-GAL DIESEL UST, (1) FUEL DISP, AND TLS-350R. INSTALL (1) 1K-GAL DW FRP B5/B20 BIODIESEL UST, (1) FUEL DISP, 450P | $920,000 |
| X00584228-I1-GC | 2023-09-11 | General construction | 800 EAST 176 STREET | Demolish & excavate the concrete floor in wash area of Bay#5. Removal of existing 2500 Gal Ethanol UST & associated piping. Install a broom Truck wash & associated drainage piping | $398,000 |
| X00596064-I1-GC | 2023-07-19 | General construction | 450 CROSS BRONX EXPRESSWAY | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1) 4,000-GAL GASOLINE UST, FUEL DISPENSER. REMOVE CONCRETE SLAB, CONCRETE FUEL DISPENSING ISLAND. INSTALL (1) 4,000-GAL DOUBLE WALL FIBER | $1,094,000 |
| B00584668-I1-GC | 2023-04-17 | General construction | 2820 SNYDER AVENUE | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1) 4000-GAL GASOLINE UST, CONCRETE DISPENSING ISLAND. REPLACE-IN-KIND NEW (1) 4000-GAL GASOLINE & (1) 4,000-GAL GASOLINE DOUBLE WALL FIBER | $812,000 |
| S00700197-I1-GC | 2023-03-14 | General construction | 1100 ROSSVILLE AVENUE | REMOVAL OF EXISTING FILL PORT SPILL CONTAINER OF 5,000-GALL BIODIESEL UST. INSTALL DOUBLE WALL FILL PORT SPILL CONTAINER WITH INTERSTITIAL ELECTRONIC MONITORING SENSOR, HEAVY DUTY | $202,500 |
| Q00733945-I1-GC | 2023-03-13 | General construction | 73-33 SPRINGFIELD BOULEVARD | EMPTY PURGE, CLEAN, & PROPERLY CLOSE IN-PLACE ONE (1) 1,080-GALON UST & ASSOCIATED PIPING & LEAK DETECTION SYSTEM COMPONENTS. INSTALL ONE (1) 1,000-GALON B5/B20 BIOFUEL UST, & AL | $250,000 |
| M00777721-I1-GC | 2023-02-09 | General construction | 200 CENTRAL PARK WEST | REMOVAL OF TWO (2) EXISTING SUBMERSIBLE PUMPS & TWO (2) EXISTING TANK TOP SUMPS OF 6,000-GAL DIESEL UST. INSTALL TWO (2) DOUBLE WALL TANK TOP SUMPS WITH INTERSTITIAL ELECTRONIC MO | $169,000 |
| Q00734423-I1-GC | 2022-12-28 | General construction | 75-05 DOUGLASTON PARKWAY | EMPTY PURGE, CLEAN, & DISPOSE OF ONE (1) 1,0800-GALON UST & ASSOCIATED PIPING & LEAK DETECTION SYSTEM COMPONENTS. INSTALL ONE (1) 1,000-GALON B5/B20 BIOFUEL UST, & ALL ASSOCIATED | $250,000 |
| M00525332-I1-GC | 2022-12-06 | General construction | 60 CENTRAL PARK | REMOVE EXISTING FILL PORT SPILL CONTAINER OF 2,500-GALLON BIODIESEL UNDERGROUND STORAGE TANK. FURNISH AND INSTALL DOUBLE WALL SPILL CONTAINER WITH INTERSTITIAL ELECTRONIC MONITORIN | $169,000 |
| B00584634-I1-GC | 2022-12-02 | General construction | 491 ROGERS AVENUE | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1)550-GAL BIODIESEL AST, (1)FUEL DISPENSER & CONCRETE DISPENSING ISLAND. INSTALL IN-KIND NEW (1)550-GAL FIELD FABRICATED SINGLE-WALL STEEL | $340,000 |
| M00525358-I1-GC | 2022-12-02 | General construction | 190 86 STREET TRANSVERSE | REMOVE EXISTING FILL PORT SPILL CONTAINER OF 2,000-GALLON GASOLINE UNDERGROUND STORAGE TANK AND FURNISH AND INSTALL DOUBLE WALL SPILL CONTAINER WITH INTERSTITIAL ELECTRONIC MONITOR | $169,000 |
| Q00497450-I1-ST | 2022-09-28 | General construction | 196-10 UNION TURNPIKE | GENERAL CONSTRUCTION AND STRUCTURAL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF (1) BIODIESEL UST SYSTEM (EXCAVATION, BACKFILL, REINFORCED CONCRETE WORK, SITE RESTORATION, ETC. | $45,000 |
| Q00507062-I1-ST | 2022-09-28 | General construction | 80-30 PARK LANE | GENERAL CONSTRUCTION AND STRUCTURAL WORK ASSOCIATED WITH CLOSURE AND REPLACEMENT OF (1) BIODIESEL UST SYSTEM (EXCAVATION, BACKFILL, REINFORCED CONCRETE WORK, SITE RESTORATION, ETC. | $200,000 |
| Q00507062-I1-GC | 2022-09-20 | General construction | 80-30 PARK LANE | GENERAL CONSTRUCTION AND STRUCTURAL WORK ASSOCIATED WITH CLOSURE AND REPLACEMENT OF (1) BIODIESEL UST SYSTEM (EXCAVATION, BACKFILL, REINFORCED CONCRETE WORK, SITE RESTORATION, ETC. | $200,000 |
| Q00497450-I1-GC | 2022-09-20 | General construction | 196-10 UNION TURNPIKE | GENERAL CONSTRUCTION AND STRUCTURAL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF (1) BIODIESEL UST SYSTEM (EXCAVATION, BACKFILL, REINFORCED CONCRETE WORK, SITE RESTORATION, ETC. | $45,000 |
| S00399254-I1-MS | 2022-05-11 | Mechanical / HVAC | 717 RICHMOND ROAD | To legalize the installation of fuel oil burner/furnace. No change in use, egress or occupancy. | $0 |
| X00633967-I1-GC | 2022-01-14 | General construction | 1264 RANDALL AVENUE | REMOVE THREE (3) DIESEL DISPENSERS AND REPLACE WITH THREE (3) GILBARCO DIESEL EXHAUST FLUID (DEF)/DIESEL DISPENSERS. INSTALL 1,000-GALLON KLEERBLUE ULTRA 1000 DEF TANK AND 8 THICK | $100,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →