COMPANY RECORD · NEW YORK, NY
Talisen Construction Corp — permit history in New York, NY
Talisen Construction Corp appears on 140 New York permit records from 2019 through 2026, most often mechanical / hvac (53.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 75 | 53.6% |
| General construction | 65 | 46.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 11 |
| 2020 | 6 |
| 2021 | 19 |
| 2022 | 31 |
| 2023 | 35 |
| 2024 | 20 |
| 2025 | 11 |
| 2026 | 7 |
Busiest year on record: 2023, with 35 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Nyc Fire Sprinkler Corp | 4 | 2026-08-03 |
| Maccarone Plumbing Inc | 3 | 2024-12-23 |
| Shamrock Mechanical Inc | 3 | 2025-04-08 |
| Tristate Plbg Svcs Corp | 2 | 2025-03-19 |
| Universal Plumbing Inc | 2 | 2023-07-21 |
| American Standard Plumbin | 1 | 2025-01-30 |
| Aws Mechanical II LLC | 1 | 2025-03-27 |
| Bedrock Mechanical Inc | 1 | 2025-03-04 |
| Bedrock Plbg. & Htg., Inc | 1 | 2025-02-28 |
| George Breslaw Plbng LLC | 1 | 2026-04-29 |
| Par Plumbing Co., Inc | 1 | 2024-07-30 |
11 companies are named alongside Talisen Construction Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 150 RIVERSIDE DRIVE | 2026-08-17 |
| 882 3 AVENUE | 2026-07-30 |
| 56-45 MAIN STREET | 2026-06-17 |
| 536 MYRTLE AVENUE | 2025-07-15 |
| 740 AMSTERDAM AVENUE | 2025-03-10 |
| 750 AMSTERDAM AVENUE | 2025-03-10 |
| 710 WEST 168 STREET | 2025-02-26 |
| 4781 BROADWAY | 2025-02-05 |
| 1180 FIFTH AVENUE | 2024-12-23 |
| 160 EAST 34 STREET | 2024-07-30 |
| 1425 MADISON AVENUE | 2024-07-17 |
| 300 CADMAN PLAZA WEST | 2024-07-12 |
| 525 EAST 68 STREET | 2024-06-14 |
| 440 NINTH AVENUE | 2024-05-28 |
60 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $6,998,400, median $200,036. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
140 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01340993-I1-GC | 2026-08-17 | General construction | 150 RIVERSIDE DRIVE | Filing for the interior renovation of an existing electrical room, the construction of a new indoor fire rated generator room related to the new fuel oil standby generator installa | $227,612 |
| B01414517-S1-MS | 2026-07-30 | Mechanical / HVAC | 882 3 AVENUE | 2ND FLOOR - OFFICES INTERIOR RENOVATION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $50,646 |
| B01414517-I1-GC | 2026-07-30 | General construction | 882 3 AVENUE | 2ND FLOOR OFFICES INTERIOR RENOVATION - GENERAL CONSTRUCTION MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $245,000 |
| Q01325588-S3-MS | 2026-06-17 | Mechanical / HVAC | 56-45 MAIN STREET | NYPQ - N. IT - MECHANICAL MODIFICATIONS ACOORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $500,000 |
| Q01325588-I1-GC | 2026-06-17 | General construction | 56-45 MAIN STREET | NYPQ - IT CLOSET - MODIFICATION OF PARTITIONS, CEILING, DOORS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $250,000 |
| B01316693-S2-MS | 2026-04-10 | Mechanical / HVAC | 882 3 AVENUE | HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $525,000 |
| B01316693-I1-GC | 2026-04-10 | General construction | 882 3 AVENUE | HEREWITH FILING ARCHITECTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $1,100,000 |
| B01086483-I1-GC | 2025-07-15 | General construction | 536 MYRTLE AVENUE | Interior renovation of plan east of 3rd floor. New interior partitions and finishes. Minimal addition of plumbing fixtures and minimal structural work for operable partitions. maxi | $934,366 |
| B01158620-S2-MS | 2025-03-17 | Mechanical / HVAC | 536 MYRTLE AVENUE | Modification to HVAC system as per plans filed herewith. | $179,250 |
| M00850203-I1-GC | 2025-03-10 | General construction | 740 AMSTERDAM AVENUE | HEREWITH FILING INTERIOR FIT OUT OF EXISTING CELLAR, EXTERIOR REPAIR WORK AT REAR FACADES AND NORTH ROOF, ALT-CO CHANGE OF USE AND OCCUPANCY AT BASEMENT LEVEL. | $2,607,000 |
| M01186714-I1-GC | 2025-03-10 | General construction | 740 AMSTERDAM AVENUE | HEREWITH FILING ARCHITECTURAL WORK, DEMO OF RAMP AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCPANCY | $25,000 |
| M00850203-S1-MS | 2025-03-10 | Mechanical / HVAC | 740 AMSTERDAM AVENUE | HEREWITH FILING MECHANICAL WORK, INSTALLATION OF COMMERCIAL COOKING AND HOOD/DUCT SYSTEM AS PER PLANS IN CONJUNCTION WITH ALT-CO. | $1,500,000 |
| M01186716-I1-GC | 2025-03-10 | General construction | 750 AMSTERDAM AVENUE | HEREWITH FILING ARCHITECTURAL WORK, DEMO OF RAMP AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCPANCY | $25,000 |
| M00279337-I1-MS | 2025-02-26 | Mechanical / HVAC | 710 WEST 168 STREET | MECHANICAL MODIFICATIONS AS PER PLANS | $1,592,000 |
| B01158620-I1-GC | 2025-02-19 | General construction | 536 MYRTLE AVENUE | INTERIOR RENOVATION OF PLAN EAST OF THE 3RD FLOOR. NEW INTERIOR PARTITIONSAND FINISHES. MINIMAL ADDITION OF PLUMBING FIXTURES AND MINIMAL STRUCTURALWORK FOR OPERABLE PARTITION. MAX | $400,000 |
| M01103217-S1-MS | 2025-02-05 | Mechanical / HVAC | 4781 BROADWAY | Modification of HVAC equipment and ductwork to accommodate alterations as per plans.no change to use, egress or occupancy. | $217,000 |
| M01103217-I1-GC | 2025-02-05 | General construction | 4781 BROADWAY | MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS TO THE EXISTING MEDICAL OFFICE BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. ALL TO COMP | $400,000 |
| B01146454-S1-MS | 2025-01-21 | Mechanical / HVAC | 536 MYRTLE AVENUE | Modification to HVAC system as per plans filed herewith. | $100,000 |
| M01021697-S1-MS | 2024-12-23 | Mechanical / HVAC | 1180 FIFTH AVENUE | Mount Sinai - Annenberg BSL3 Lab Renovation Project - Demolition of existing, abandoned, small branch steam and condensate piping no longer in use as per plans filed herewith. No c | $250,000 |
| M01021697-I1-GC | 2024-12-23 | General construction | 1180 FIFTH AVENUE | Mount Sinai - Annenberg BSL3 Lab Renovation - Int. reno. including related construction to the replacement of BioSafety cabinets and Decontamination System as per plans filed he | $375,000 |
| B01146454-I1-GC | 2024-12-20 | General construction | 536 MYRTLE AVENUE | Removal and installation of interior non-bearing partitions and related finishes as per plans. No change in use, egress or occupancy under this application (Pratt) | $1,500,000 |
| Q01047019-S1-MS | 2024-10-22 | Mechanical / HVAC | 56-45 MAIN STREET | NYPQ - SERVERY RENOVATION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $59,947 |
| M01040135-I1-GC | 2024-07-30 | General construction | 160 EAST 34 STREET | NYU LANGONE - PHYSICIAN FIT OUT - GENERAL CONSTRUCTION INCLUDING FLOOR, CEILING, PARTITION AND DOOR MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $325,000 |
| M01040139-I1-MS | 2024-07-30 | Mechanical / HVAC | 160 EAST 34 STREET | NYU LANGONE - PHYSICIAN FIT OUT - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY. | $1,200 |
| M01024283-S1-MS | 2024-07-17 | Mechanical / HVAC | 1425 MADISON AVENUE | Mount Sinai - IMI ABSL3 Lab Renovation - Mechanical modifications including the replacement of existing exhaust fan only. as per plans filed herewith. No change in use, egress, o | $1,450,000 |
| M01024283-I1-GC | 2024-07-17 | General construction | 1425 MADISON AVENUE | Mount Sinai - Annenberg BSL3 Lab Renovation - Interior renovations including replacement of biosafety cabinets, autoclave, and related construction as per plans filed herewith. No | $375,000 |
| B01040683-I1-GC | 2024-07-12 | General construction | 300 CADMAN PLAZA WEST | Modification of partitions on 1st floor lobby for tenant Mt. Sinai on incidental ceiling modification to accommodate partition work as per plans. No change in use, egress or occupa | $550,000 |
| B01040712-I1-MS | 2024-07-12 | Mechanical / HVAC | 300 CADMAN PLAZA WEST | Mechanical work associated with renovation on 1st floor lobby for tenant Mt. Sinai as per plans. No change in use, egress or occupancy. | $60,000 |
| Q01047019-I1-GC | 2024-07-10 | General construction | 56-45 MAIN STREET | NYPQ - SERVERY RENOVATION - GENERAL CONSTRUCTION INCLUDING MODIFICATIONS TO FLOORS, CEILINGS. PARTITIONS, AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPA | $500,000 |
| M00989180-I1-GC | 2024-06-14 | General construction | 525 EAST 68 STREET | J0 waiting reception: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OCCUPANCY. | $604,000 |
| M00989193-I1-MS | 2024-06-14 | Mechanical / HVAC | 525 EAST 68 STREET | J0 Waiting and reception: remove and install new mechanical ductwork and equipment on cellar level J Wing in the existing hospital as per plans filed herewith. NO CHANGE TO ZONING, | $71,993 |
| M01036700-I1-MS | 2024-05-28 | Mechanical / HVAC | 440 NINTH AVENUE | Modification to existing HVAC system as per plans filed herewith. No change in use, egress, or occupancy under this application. | $1,000 |
| B00966424-I1-MS | 2024-04-01 | Mechanical / HVAC | 272 MACON STREET | mechanical modification to include HVAC replacement and replacement of associated ductwork. No change of use occupancy or egress under the application | $35,000 |
| M00834341-I1-GC | 2024-03-28 | General construction | 466 GRAND STREET | Herewith filing alteration to an existing outdoor amphitheater. Enlargement proposed, and interior general construction, as per plans submitted. Amended Certificate of Occupancy | $805,000 |
| M00825160-I1-MS | 2024-03-15 | Mechanical / HVAC | 466 GRAND STREET | Herewith filing for the removal of existing ducts, and installation of new ducts, exhaust and ventilation as per plans submitted. | $100,700 |
| M00872913-I1-MS | 2024-03-15 | Mechanical / HVAC | 466 GRAND STREET | Herewith filing for the installation of mechanical units and related ducts, as per plans submitted. | $100,000 |
| M00961497-I1-MS | 2024-03-06 | Mechanical / HVAC | 619 WEST 54 STREET | Modification to existing HVAC system as per plans filed herewith. | $1,291,500 |
| M00961494-I1-GC | 2024-03-06 | General construction | 619 WEST 54 STREET | INTERIOR FIT-OUT OF NONPRODUCTION LABORATORY/OFFICE TENANT SPACES ON LEVEL 10. NO CHANGE TO OCCUPANCY, EGRESS OR USE. NO CHANGE ON BUILDING ENVELOPE, ELEVATORS OR STAIRS. | $3,675,000 |
| B00966042-I1-GC | 2023-12-21 | General construction | 272 MACON STREET | SCOPE OF WORK INCLUDES MINOR RENOVATIONS TO MEZZANINE INCLUDING NEW PARTITION ON TOP OFEXISTING MEZZANINE PARAPET, NEW SLIDING GLASS DOOR SYSTEM, NEW EXIT DOOR, LANDING AND STEPSAT | $35,000 |
| M08028287-I1-GC | 2023-12-06 | General construction | 466 GRAND STREET | Herewith filing alterations at the ground and 1st floor levels, general construction work as per plans submitted. There is no change to use, egress or occupancy under this applica | $114,000 |
| M00930034-I1-GC | 2023-10-12 | General construction | 1375 BROADWAY | MINOR PARTITION REMOVAL, INSTALLATION AND FINISHES AT THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $150,000 |
| B00862949-S1-MS | 2023-08-25 | Mechanical / HVAC | 390 BERRY STREET | Filing herewith for the modifications to existing mechanical system as per plans. | $86,930 |
| B00862949-I1-GC | 2023-07-14 | General construction | 390 BERRY STREET | Filing herewith for the interior renovation of exiting 2nd ad 3rd floors. There is no change to use , egress or occupancy. | $542,000 |
| B08030867-I1-GC | 2023-07-13 | General construction | 186 JORALEMON STREET | INTERIOR RENOVATION OF SPACE ON 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $1,115,000 |
| B08030917-I1-MS | 2023-07-13 | Mechanical / HVAC | 186 JORALEMON STREET | INSTALLATION OF MECHANICAL UNITS AND ASSOSIATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $441,000 |
| M00816696-I1-MS | 2023-05-26 | Mechanical / HVAC | 715 COLUMBUS AVENUE | Minor demolition & new mechanical fit-out work at localized area of cellar and 1st floor in part with MCC new tenant fit out, see comments for more. | $156,690 |
| M00816694-I1-GC | 2023-05-25 | General construction | 715 COLUMBUS AVENUE | LOCALIZED INTERIOR & EXTERIOR WORK OF MINOR DEMOLITION @ CELLAR & 1ST FLOOR OF AN EXISTING FIRE PROTECTED MIXED-USE BUILDING, WORK INCLUDES NEW 2-STOP L.U.L.A. ELEVATOR, NEW METAL | $600,076 |
| M00816688-I1-GC | 2023-05-25 | General construction | 70 WEST 95 STREET | CONVERT LOCALIZED AREAS OF CELLAR FROM COMMERICAL STORAGE ROOMS TO CLASSROOMS AND OFFICES AND FIRST FLOOR STORES AND STORAGE TO CLASSROOMS & OFFICES. SEE COMMENTS FOR MORE | $80,000 |
| M00816697-I1-GC-CX | 2023-05-23 | General construction | 715 COLUMBUS AVENUE | LOCALIZED CELLAR FOUNDATION FOR NEW 2-STOP L.U.L.A. ELEVATOR, NEW ADA PLATFORM LIFT AND NEW CONVENIENCE STAIRS AND RELATED STRUCTURAL @ CELLAR AND 1ST FLOOR IN PART WITH MCC NEW TE | $129,260 |
| Q00862117-I1-GC | 2023-05-12 | General construction | 268-05 76 AVENUE | THE ARHITECTURAL SCOPE IS TO PROVIDE ALL REQUIRED GENERAL CONSTRUCTION WORK AND MODIFICATIONS IN SUPPORT OF THE NEW SEWAGE PUMP TO BE INSTALLED WITHING THE EXISTING CELLAR MEN'S BA | $100,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
