COMPANY RECORD · NEW YORK, NY
Synergy Construction Inc — permit history in New York, NY
Synergy Construction Inc appears on 234 New York permit records from 2020 through 2026, most often general construction (50.4% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 022981 | 234 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | SYNERGY CONSTRUCTION INC |
|---|---|
| Business address on file | 350 7TH AVENUE, SUITE 201 NEW YORK NY 10001 |
| Business phone on file | (212) 279-9510 |
| Licence number | 22981 |
| Licence type | GENERAL CONTRACTOR |
| Status in the register | ACTIVE |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Synergy Construction Inc by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 118 | 50.4% |
| Mechanical / HVAC | 116 | 49.6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 14 |
| 2021 | 42 |
| 2022 | 60 |
| 2023 | 37 |
| 2024 | 29 |
| 2025 | 33 |
| 2026 | 19 |
Busiest year on record: 2022, with 60 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Miller Plumbing & Htg Inc | 3 | 2024-05-03 |
| Peter Miceli Plumbing | 2 | 2023-08-23 |
| Dependable Mech Corp | 1 | 2026-09-18 |
| Complete Plbg Safety LLC | 1 | 2026-05-05 |
| Miller Plbg & Htg Inc | 1 | 2024-05-03 |
| Five Borough Nyc LLC | 1 | 2026-09-17 |
6 companies are named alongside Synergy Construction Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 110 EAST 60 STREET | 2026-09-14 |
| 133 EAST 58 STREET | 2026-09-14 |
| 885 THIRD AVENUE | 2026-07-31 |
| 115 BROADWAY | 2026-07-28 |
| 1173 LIBERTY AVENUE | 2026-06-08 |
| 291 BROADWAY | 2026-05-14 |
| 65 EAST 55 STREET | 2026-04-07 |
| 111 BROADWAY | 2026-02-26 |
| 810 SEVENTH AVENUE | 2025-10-20 |
| 215 PARK AVENUE SOUTH | 2025-09-26 |
| 10 EAST 53 STREET | 2025-09-26 |
| 312 EAST 30 STREET | 2025-08-14 |
| 420 LEXINGTON AVENUE | 2025-07-29 |
| 125 PARK AVENUE | 2025-07-23 |
40 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,500 to $1,449,964, median $73,498. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Miller Plbg & Htg Inc | 5 | 2021–2026 |
| Miller Plumbing & Htg Inc | 5 | 2021–2026 |
| Sirina Fire Prot Corp | 3 | 2020–2026 |
| Five Borough Nyc LLC | 2 | 2021–2026 |
| Dependable Mech Corp | 2 | 2021–2026 |
| William C. Gerakaris P&H | 2 | 2020–2026 |
| Cmp Piping Inc | 2 | 2021–2026 |
| Cm Plumbing Inc | 2 | 2021–2026 |
Companies that also appear in New York permit records at addresses where Synergy Construction Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
234 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01440597-S1-MS | 2026-09-14 | Mechanical / HVAC | 110 EAST 60 STREET | MECHANICAL MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $55,985 |
| M01425719-I1-GC | 2026-09-14 | General construction | 133 EAST 58 STREET | Interior fit-out of Doctors Office at the existing partial 3rd floor of 133 East 58th Street. No change in use, egress, or occupancy. | $550,000 |
| M01425747-I1-MS | 2026-09-14 | Mechanical / HVAC | 133 EAST 58 STREET | Insulation of AC units and ductwork as shown on plans. | $285,000 |
| M01440597-I1-GC | 2026-09-11 | General construction | 110 EAST 60 STREET | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $468,145 |
| M01423753-I1-MS | 2026-07-31 | Mechanical / HVAC | 885 THIRD AVENUE | Mechanical changes as indicated on plans. | $149,940 |
| M01423720-I1-GC | 2026-07-29 | General construction | 885 THIRD AVENUE | Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans. | $706,500 |
| M01420862-I1-GC | 2026-07-28 | General construction | 115 BROADWAY | GENERAL CONSTRUCTION TAKING PLACE ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $282,912 |
| B01308397-S2-MS | 2026-06-08 | Mechanical / HVAC | 1173 LIBERTY AVENUE | Installation of mechanical equipment and associated ductwork for medical office fit-out in first floor of existing commercial building. | $72,000 |
| M01352230-I1-GC | 2026-05-14 | General construction | 291 BROADWAY | Application filed to convert the 17th floor to residential use as shown on filed plans | $750,000 |
| B01308397-I1-GC | 2026-04-10 | General construction | 1173 LIBERTY AVENUE | RENOVATION WORK ON EXISTING COMMERCIAL OFFICE SPACE ON 1ST FL. NEW OPENING BETWEEN BUILDING.PARTITION WORK AS PER PLANS. | $309,200 |
| M01369199-I1-MS | 2026-04-07 | Mechanical / HVAC | 65 EAST 55 STREET | MECHANICAL WORK ON THE 21ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $50,000 |
| M01369194-I1-MS | 2026-03-31 | Mechanical / HVAC | 65 EAST 55 STREET | MECHANICAL WORK ON THE 15TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $100,000 |
| M01369186-I1-GC | 2026-03-31 | General construction | 65 EAST 55 STREET | PARTIAL 15TH FLOOR INTERIOR WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $75,000 |
| M01369150-I1-GC | 2026-03-31 | General construction | 65 EAST 55 STREET | PARTIAL 15TH FLOOR INTERIOR WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $50,000 |
| M01354867-I1-MS | 2026-02-27 | Mechanical / HVAC | 885 THIRD AVENUE | Mechanical changes as indicated on plans. | $75,000 |
| M01356203-I1-GC | 2026-02-26 | General construction | 111 BROADWAY | GENERAL CONSTRUCTION TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $130,000 |
| M01354846-I1-GC | 2026-02-26 | General construction | 885 THIRD AVENUE | Interior demo & reno of non-load bearing partitions, walls, doors, frames, ceiling &n finishes as indicated on plans. | $150,000 |
| M01323732-I1-GC | 2026-01-05 | General construction | 110 EAST 60 STREET | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $990,360 |
| M01323763-I1-MS | 2026-01-05 | Mechanical / HVAC | 110 EAST 60 STREET | MECHANICAL MODIFICATIONST TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $225,000 |
| M01299185-I1-MS | 2025-12-02 | Mechanical / HVAC | 111 BROADWAY | MECHANICAL MODIFICATIONS TAKING PLACE ON 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $87,991 |
| M01299170-I1-GC | 2025-12-02 | General construction | 111 BROADWAY | GENERAL CONSTRUCTION TAKING PLACE ON 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $265,280 |
| M01293246-I1-MS | 2025-10-20 | Mechanical / HVAC | 810 SEVENTH AVENUE | Modifications to the existing HVAC system on the 22nd floor (Suite 2201) as per plans. No change to use, egress or occupancy. | $74,995 |
| M01293228-I1-GC | 2025-10-16 | General construction | 810 SEVENTH AVENUE | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 22nd Floor (Suite 2201) as per plans. No change to use, egress or occupancy. | $199,969 |
| M01274745-I1-MS | 2025-09-26 | Mechanical / HVAC | 215 PARK AVENUE SOUTH | Modifications to the existing HVAC system on the 14th, 18th, 19th and 20th floors as per plans. No change to use, egress or occupancy. | $560,000 |
| M01271041-I1-MS | 2025-09-26 | Mechanical / HVAC | 10 EAST 53 STREET | Modifications to the existing mechanical system on the 18th floor (Derby Lane) as per plans. No change to use, egress or occupancy. | $40,000 |
| M01271012-I1-GC | 2025-09-26 | General construction | 10 EAST 53 STREET | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 18th floor (Derby Lane) as per plans. No change to use, egress or occupancy. | $120,000 |
| M01274715-I1-GC | 2025-09-15 | General construction | 215 PARK AVENUE SOUTH | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 14th, 18th, 19th and 20th floors as per plans. No change to use, egress or occupancy. | $550,000 |
| M01170199-I1-GC | 2025-08-18 | General construction | 111 BROADWAY | GENERAL CONSTRUCTION TAKING PLACE ON 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $215,280 |
| M01238996-I1-MS | 2025-08-18 | Mechanical / HVAC | 111 BROADWAY | MECHANICAL MODIFICATIONS TAKING PLACE ON 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $125,000 |
| M01236898-I1-GC | 2025-08-14 | General construction | 312 EAST 30 STREET | FILING TO INCLUDE THE REMOVAL OF NON-BEARING WALLS, FINISHES, DOORS, & LIGHTING FORVACATED COMMERCIAL SPACE LOCATED IN BUILDING BASEMENT | $100,000 |
| M01243521-I1-GC | 2025-08-06 | General construction | 110 EAST 60 STREET | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR, SUITE 1100 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $130,000 |
| M01243524-I1-MS | 2025-08-06 | Mechanical / HVAC | 110 EAST 60 STREET | MECHANICAL MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR, SUITE 1100 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $115,000 |
| M01254001-I1-MS | 2025-07-29 | Mechanical / HVAC | 420 LEXINGTON AVENUE | Mechanical changes as indicated on plans. | $152,670 |
| M01253972-I1-GC | 2025-07-29 | General construction | 420 LEXINGTON AVENUE | Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans. | $203,560 |
| M01177445-I1-GC | 2025-07-23 | General construction | 125 PARK AVENUE | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 16th Floor (Suite 1610) as per plans. No change to use, egress or occupancy. | $99,981 |
| M01177629-I1-MS | 2025-07-23 | Mechanical / HVAC | 125 PARK AVENUE | Modifications to the existing HVAC system on the 16th floor (Suite 1610) as per plans. No change to use, egress or occupancy. | $39,997 |
| M01224875-I1-MS | 2025-06-25 | Mechanical / HVAC | 115 BROADWAY | MECHANICAL MODIFICATIONS TAKING PLACE ON 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $130,008 |
| M01181059-I1-GC | 2025-06-24 | General construction | 115 BROADWAY | GENERAL CONSTRUCTION TAKING PLACE ON 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $308,822 |
| M01188299-I1-MS | 2025-04-16 | Mechanical / HVAC | 111 BROADWAY | MECHANICAL MODIFICATIONS TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $64,998 |
| M01170191-I1-GC | 2025-04-16 | General construction | 111 BROADWAY | GENERAL CONSTRUCTION TAKING PLACE ON 18TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $200,509 |
| M01188421-I1-MS | 2025-04-16 | Mechanical / HVAC | 111 BROADWAY | MECHANICAL MODIFICATIONS TAKING PLACE ON 18TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $88,011 |
| M01170202-I1-GC | 2025-04-16 | General construction | 111 BROADWAY | GENERAL CONSTRUCTION TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $100,009 |
| M01180813-I1-GC | 2025-04-07 | General construction | 420 LEXINGTON AVENUE | Interior demo & reno of non-load bearing partitions, walls, ceiling & finishes as indicated on plans. | $137,500 |
| M01162624-I1-MS | 2025-03-27 | Mechanical / HVAC | 215 PARK AVENUE SOUTH | Modifications to the existing HVAC system on the 20th floor (Suite 2001) as per plans. No change to use, egress or occupancy. | $59,984 |
| M01162529-I1-GC | 2025-03-27 | General construction | 215 PARK AVENUE SOUTH | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 20th floor (Suite 2001) as per plans. No change to use, egress or occupancy. | $84,985 |
| M01180830-I1-MS | 2025-03-24 | Mechanical / HVAC | 420 LEXINGTON AVENUE | Mechanical changes as indicated on plans. | $87,500 |
| M01185394-I1-GC | 2025-03-17 | General construction | 885 THIRD AVENUE | Interior reno & demo of non-load bearing partitions, walls, ceiling & finishes as indicated on plans. | $100,000 |
| M01185409-I1-MS | 2025-03-17 | Mechanical / HVAC | 885 THIRD AVENUE | Mechanical changes as indicated on plans. | $60,000 |
| M01180978-I1-MS | 2025-03-14 | Mechanical / HVAC | 10 EAST 53 STREET | Modifications to the existing HVAC system on the 28th floor (Portage) as per plans. No change to use, egress or occupancy. | $90,000 |
| M01180908-I1-GC | 2025-03-07 | General construction | 10 EAST 53 STREET | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 28th floor (Portage) as per plans. No change to use, egress or occupancy. | $369,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 234 permits above are a static record through 2026. Select a year above to open that year’s records, or search Synergy Construction Inc in New York, NY by address, trade or date range.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
