COMPANY RECORD · NEW YORK, NY
Miller Plbg & Htg Inc — permit history in New York, NY
Miller Plbg & Htg Inc appears on 159 New York permit records from 2019 through 2026, most often plumbing (90.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 158 | 90.8% |
| Fire protection | 16 | 9.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 8 |
| 2020 | 10 |
| 2021 | 26 |
| 2022 | 23 |
| 2023 | 19 |
| 2024 | 43 |
| 2025 | 28 |
| 2026 | 17 |
Busiest year on record: 2024, with 43 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Procida Construction Corp | 9 | 2025-12-15 |
| Paul M Maintenance Inc | 6 | 2026-08-27 |
| Amaco Home Improvment.Inc | 1 | 2026-03-16 |
| Andr Services Group | 1 | 2024-10-28 |
| Bolivar Builders, LLC | 1 | 2026-01-30 |
| Inn Construction Design | 1 | 2026-03-19 |
| Jackovic Constr Co | 1 | 2025-09-15 |
| Navac Builders Inc | 1 | 2023-11-22 |
| Synergy Construction Inc | 1 | 2024-05-03 |
9 companies are named alongside Miller Plbg & Htg Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3131 KINGS HIGHWAY | 2026-08-27 |
| 206 EAST 95 STREET | 2026-08-25 |
| 885 THIRD AVENUE | 2026-08-17 |
| 276 GREENPOINT AVENUE | 2026-06-30 |
| 80 NEW LOTS AVENUE | 2026-06-10 |
| 5 PENN PLAZA | 2026-06-03 |
| 1230 GATES AVENUE | 2026-05-19 |
| 2330 ARTHUR AVENUE | 2026-03-19 |
| 611 WEST 111 STREET | 2026-03-16 |
| 179 LUDLOW STREET | 2026-03-16 |
| 535 EAST 70 STREET | 2026-03-04 |
| 1998 SECOND AVENUE | 2026-01-30 |
| 555 MADISON AVENUE | 2026-01-12 |
| 121 LENOX AVENUE | 2025-12-15 |
104 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $753,683, median $24,991. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
159 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B00940095-S2-PL | 2026-08-27 | Plumbing | 3131 KINGS HIGHWAY | Herewith filing Plumbing modifications for Mount Sinai Orthopedic Extension. No change in use, egress, or occupancy. | $75,000 |
| M01433470-S1-PL | 2026-08-25 | Plumbing | 206 EAST 95 STREET | FILING FOR THE REPLACEMENT OF GAS BOILERS. NO CHANGE TO USE, OCCUPANCY OR EGRESS | $20,000 |
| M01423753-S1-PL | 2026-08-17 | Plumbing | 885 THIRD AVENUE | Plumbing Fixture changes as indicated on plans. | $20,000 |
| B01338578-I1-PL | 2026-06-30 | Plumbing | 276 GREENPOINT AVENUE | Gas piping and installation of three pieces of gas fired equipment | $38,000 |
| B01395090-I1-PL | 2026-06-10 | Plumbing | 80 NEW LOTS AVENUE | Filing to add plumbing work type in conjunction with GC/MS DOB now job# B01331931, install (1) three compartment sink, and (2) hand-wash sinks, and (1) grease trap inside 1st comme | $6,000 |
| M01395240-I1-PL | 2026-06-03 | Fire protection | 5 PENN PLAZA | Modifications to existing Plumbing fixtures, standpipe, and sprinkler system as per plans filed herewith. No change in use, egress, or occupancy. | $41,864 |
| M01395240-I1-PL | 2026-06-03 | Plumbing | 5 PENN PLAZA | Modifications to existing Plumbing fixtures, standpipe, and sprinkler system as per plans filed herewith. No change in use, egress, or occupancy. | $41,864 |
| B00980266-I1-PL | 2026-05-19 | Plumbing | 1230 GATES AVENUE | PROPOSED UNDERGROUND UTILITIES TRENCH AND INSTALLATION FOR WATER, GAS AND ELECTRICAL SERVICE PIPING BETWEEN EXTERIOR ELEVATED UTILITY POD TO BUILDINGS, AND INTERCONNECTING BETWEEN | $15,508 |
| X01292781-S1-PL | 2026-03-19 | Plumbing | 2330 ARTHUR AVENUE | Plumbing work in conjunction of restaurant renovation X01292781-i1 as per plans | $15,000 |
| M01187977-S1-PL | 2026-03-16 | Plumbing | 611 WEST 111 STREET | RELOCATE ONE 3-PIECE BATHROOM AND KITCHEN. NO GAS WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. | $18,000 |
| M01199964-S3-PL | 2026-03-16 | Plumbing | 179 LUDLOW STREET | Plumbing work for the interior renovation of existing mixed used bldg on Ground floor. All work as per plan submitted. No Change in use, egress or occupancy. | $3,500 |
| M01289529-I1-PL | 2026-03-05 | Plumbing | 5 PENN PLAZA | Modifications to existing plumbing and sprinkler system. No change in use, egress, or occupancy. | $210,000 |
| M01289529-I1-PL | 2026-03-05 | Fire protection | 5 PENN PLAZA | Modifications to existing plumbing and sprinkler system. No change in use, egress, or occupancy. | $210,000 |
| M01356789-S2-PL | 2026-03-04 | Plumbing | 535 EAST 70 STREET | Plumbing and sprinkler modifications to accommodate new CT equipment on the 3rd floor including piping on 2nd floor in the existing hospital as per plans filed herewith only. | $44,900 |
| M01356789-S2-PL | 2026-03-04 | Fire protection | 535 EAST 70 STREET | Plumbing and sprinkler modifications to accommodate new CT equipment on the 3rd floor including piping on 2nd floor in the existing hospital as per plans filed herewith only. | $44,900 |
| M01283401-S1-PL | 2026-01-30 | Plumbing | 1998 SECOND AVENUE | Plumbing application for Tenant space as per plans filed | $1,000 |
| M01313663-S2-PL | 2026-01-12 | Plumbing | 555 MADISON AVENUE | NYULH - MEN'S HEALTH CENTER EXPANSION - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $49,000 |
| M01321545-S1-PL | 2025-12-15 | Plumbing | 121 LENOX AVENUE | SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. | $150,000 |
| M01293250-I1-PL | 2025-11-26 | Plumbing | 810 SEVENTH AVENUE | Installation of new plumbing fixtures and associated piping on the 22nd floor (Suite 2201) as per plans. No change to use, egress or occupancy. | $15,000 |
| M01240471-I1-PL | 2025-11-18 | Plumbing | 5 PENN PLAZA | Modifications to existing plumbing and sprinkler system as per plans filed herewith. No change in use, egress, or occupancy. | $82,497 |
| M01240471-I1-PL | 2025-11-18 | Fire protection | 5 PENN PLAZA | Modifications to existing plumbing and sprinkler system as per plans filed herewith. No change in use, egress, or occupancy. | $82,497 |
| M01177701-I1-PL | 2025-09-24 | Plumbing | 125 PARK AVENUE | Modifications to the existing plumbing system on the 16th floor (Suite 1610) as per plans. No change to use, egress or occupancy. | $15,000 |
| M01238997-I1-PL | 2025-09-19 | Plumbing | 111 BROADWAY | PLUMBING MODIFICATIONS TAKING PLACE ON 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $9,800 |
| B01256310-S2-PL | 2025-09-15 | Plumbing | 122 BEDFORD AVENUE | modifications to existing plumbing system for existing retail space for new tenant 'Insomnia cookies'. | $42,000 |
| M01243525-I1-PL | 2025-08-06 | Plumbing | 110 EAST 60 STREET | PLUMBING MODIFICATIONS TAKING PLACE ON THE 11TH, SUITE 1100 FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $8,500 |
| M01224881-I1-PL | 2025-07-18 | Plumbing | 115 BROADWAY | PLUMBING MODIFICATIONS TAKING PLACE ON 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $15,601 |
| B01202363-I1-PL | 2025-07-15 | Plumbing | 2927 AVENUE U | Modification to existing plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application | $238,997 |
| B00962685-S1-PL | 2025-07-07 | Plumbing | 1280 GREENE AVENUE | DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER PIPING FROM THE CELLAR | $149,846 |
| M01210406-I1-PL | 2025-06-13 | Fire protection | 5 PENN PLAZA | Modifications to existing plumbing and sprinkler system. No change in use, egress, or occupancy. | $75,884 |
| M01210406-I1-PL | 2025-06-13 | Plumbing | 5 PENN PLAZA | Modifications to existing plumbing and sprinkler system. No change in use, egress, or occupancy. | $75,884 |
| X01165180-S2-PL | 2025-06-13 | Plumbing | 480 EAST 176 STREET | PROPOSED (PL) FILING IN CONJUNCTION TO ALTERATION X01165180-I1 | $5,000 |
| B01215427-I1-PL | 2025-05-28 | Plumbing | 125 MONTAGUE STREET | GOOD VETS-- MEDICAL GAS PLUMBING INSTALLATIONS IN CONJUCTION WITH BUILD-OUT AS PER PLANS FILED. | $3,000 |
| B00962648-S2-PL | 2025-05-02 | Plumbing | 1240 GREENE AVENUE | DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM TH | $312,178 |
| B00961947-S1-PL | 2025-05-02 | Plumbing | 160 HIMROD STREET | DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM TH | $312,178 |
| M01196890-I1-PL | 2025-05-01 | Plumbing | 5 PENN PLAZA | Modifications to existing plumbing, sprinkler, and standpipe system. No change in use, egress, or occupancy. | $185,969 |
| M01196890-I1-PL | 2025-05-01 | Fire protection | 5 PENN PLAZA | Modifications to existing plumbing, sprinkler, and standpipe system. No change in use, egress, or occupancy. | $185,969 |
| M01185409-S1-PL | 2025-03-25 | Plumbing | 885 THIRD AVENUE | Plumbing Fixture changes as indicated on plans. | $12,000 |
| M01179811-I1-PL | 2025-03-13 | Plumbing | 810 SEVENTH AVENUE | Modifications to the existing plumbing system on the 17th floor (Suite 1700) as per plans. No change to use, egress or occupancy. | $9,000 |
| Q00368652-I1-PL | 2025-03-12 | Plumbing | 52-35 74 STREET | INSTALLATION OF NEW ON-SITE STORMWATER DETENTION SYSTEM INCLUDING NEW TRENCH DRAIN, UNDERGROUND PIPING, AND CONNECTION TO THE SEWER FOR THE PROPOSED 4-STORY SELF-STORAGE FACILITY. | $20,000 |
| Q00420835-I1-PL | 2025-03-12 | Plumbing | 52-35 74 STREET | PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING #420667460 AS PER THE PLANS FILED HEREWITH. | $1 |
| M01161933-I1-PL | 2025-02-04 | Plumbing | 5 PENN PLAZA | Adding new plumbing fixtures to the 15th floor (buildout for Railworks & Altus) as per plans. No change to egress use or occupacy | $35,000 |
| M01145202-I1-PL | 2025-01-30 | Plumbing | 5 PENN PLAZA | Remove 3 sinks, 1 watercloset, 1 lav, 1 dishwasher, 1 refrigerator, and 1 CM, cap all on the 15th floor as per plans. No changes to egress, use or occupancy | $2,900 |
| M01056417-I1-PL | 2025-01-21 | Fire protection | 78 WALKER STREET | MODIFICATION OF PLUMBING AND RENOVATION OF SPRINKLER AND STANDPIPE SYSTEM FOR COMMERCIAL BUILDING IN CONJUNCTION WITH GC APPLICATION #M00949843-I1 | $80,000 |
| M01056417-I1-PL | 2025-01-21 | Plumbing | 78 WALKER STREET | MODIFICATION OF PLUMBING AND RENOVATION OF SPRINKLER AND STANDPIPE SYSTEM FOR COMMERCIAL BUILDING IN CONJUNCTION WITH GC APPLICATION #M00949843-I1 | $80,000 |
| M01120780-I1-PL | 2025-01-10 | Plumbing | 115 BROADWAY | PLUMBING MODIFICATIONS TAKING PLACE ON 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $16,988 |
| M01040726-S2-PL | 2024-12-19 | Plumbing | 535 EAST 70 STREET | HSS BLOCK A & B: SPRINKLER AND PLUMBING MODIFICATIONS TO ACCOMMODATE ALTERATIONS AT PARTIAL 2ND FLOOR WITHI THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR | $120,000 |
| M01040726-S2-PL | 2024-12-19 | Fire protection | 535 EAST 70 STREET | HSS BLOCK A & B: SPRINKLER AND PLUMBING MODIFICATIONS TO ACCOMMODATE ALTERATIONS AT PARTIAL 2ND FLOOR WITHI THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR | $120,000 |
| B00963414-S3-PL | 2024-12-17 | Plumbing | 399 CENTRAL AVENUE | PROPOSED UNDERGROUND UTILITIES TRENCH AND INSTALLATION FOR WATER, GAS AND ELECTRICAL SERVICE PIPING BETWEEN EXTERIOR ELEVATED UTILITY POD TO BUILDINGS, AND INTERCONNECTING BETWEEN | $15,508 |
| B00963414-S1-PL | 2024-12-16 | Plumbing | 399 CENTRAL AVENUE | DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER PIPING FROM THE CELLAR | $149,846 |
| B00963108-S2-PL | 2024-12-16 | Plumbing | 180 PALMETTO STREET | DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER PIPING FROM THE CELLAR | $312,178 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
