COMPANY RECORD · NEW YORK, NY

Phase 3 Interiors LLC — permit history in New York, NY

Phase 3 Interiors LLC appears on 299 New York permit records from 2019 through 2026, most often general construction (53.8% of the record).

Permit categories

CategoryPermitsShare
General construction16153.8%
Mechanical / HVAC13846.2%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20198
202011
202113
202253
202351
202439
202581
202643

Busiest year on record: 2025, with 81 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Grushinsky Pipng & Htg In162026-08-27
A&A Plumbing Corp152026-05-08
Stalwart Plumbing Corp62026-08-28
Superior Plumbing & Heati42025-12-29
A&H Express Plbg&Htg Corp32024-07-03
Agius Plumbing & Htg Inc32026-08-27
Pfl Mechanical Corp32025-10-01
Maccarone Plumbing Inc22023-10-05
Abco-Peerless Sprklr Corp12024-01-03
Metro Mechanical Group In12026-03-04
Orbit Plbg & Htg Inc12026-05-08
Orbit Sprinkler Corp12026-05-07

12 companies are named alongside Phase 3 Interiors LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
470 PARK AVENUE SOUTH2026-08-27
545 MADISON AVENUE2026-08-24
40 WEST 23 STREET2026-08-17
601 WEST 26 STREET2026-07-16
145 EAST 32 STREET2026-06-23
712 FIFTH AVENUE2026-06-11
304 EAST 45 STREET2026-06-05
555 WEST 59 STREET2026-05-29
1633 BROADWAY2026-05-29
10 EAST 40 STREET2026-05-13
28 WEST 23 STREET2026-05-07
57 WEST 57 STREET2026-05-07
291 GRAND STREET2026-04-27
155 EAST 44 STREET2026-04-13

78 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $5,691,284, median $100,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

299 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01444921-I1-GC2026-08-27General construction470 PARK AVENUE SOUTHGeneral construction as shown on plans filed herewith. No change in use, egress, or occupancy.$570,000
M01444921-S1-MS2026-08-27Mechanical / HVAC470 PARK AVENUE SOUTHMechanical work as shown on plans filed herewith.$0
M01435340-S1-MS2026-08-24Mechanical / HVAC545 MADISON AVENUEMechanical modifications to take place on the 9th floor as per plans filed herewith. No Change in use, egress, or occupancy.$184,400
M01384753-I1-GC2026-08-17General construction40 WEST 23 STREETGeneral construction for lobby renovations as shown on plans filed herewith. No change in use, egress, or occupancy.$550,000
M01435340-I1-GC2026-08-13General construction545 MADISON AVENUEGeneral Construction modifications to take place on the 9th floor per plans filed herewith. No change in use, egress, or occupancy.$310,950
M01394656-I1-GC2026-07-16General construction601 WEST 26 STREETInterior modifications to the existing office space including removal and installation on non-load bearing partitions and related finishes. No change in use, egress or occupancy.$159,984
M01416975-I1-GC2026-06-23General construction145 EAST 32 STREETrenovate 12th fl. New partitions and finishes. No change in use, egress or occupancy$207,500
M01411420-I1-GC2026-06-17General construction145 EAST 32 STREETREMOVAL OF INTERIOR NON LOAD-BEARING PARTITIONS FOR CELLAR AND GROUND FLOOR COMMERCIAL SPACES AS PER PLANS FILED HEREWITH.$17,000
M01399877-I1-MS2026-06-11Mechanical / HVAC712 FIFTH AVENUEModifications to the existing HVAC system on the 19th Floor (Marketing Floor 21) as per plans. No change to use, egress or occupancy..$133,000
M01398969-I1-GC2026-06-11General construction712 FIFTH AVENUEInstallation of new partitions, doors, ceilings and finishes on the 19th floor (Marketing Floor 21) as per plans. No change to use, egress or occupancy.$939,960
M01387452-I1-GC2026-06-05General construction304 EAST 45 STREETAlt-CO to convert 13th floor (marketing: 14th floor) to residential use.$1,496,280
M01378691-I1-MS2026-05-29Mechanical / HVAC555 WEST 59 STREETREPLACE (2) WATER SOURCE HEAT PUMP HVAC UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$35,000
M01387884-I1-GC2026-05-29General construction1633 BROADWAYInterior demolition of 28th floor as per plans filed herewith. No change in use, egress, or occupancy.$250,000
M01245562-I1-GC2026-05-28General construction40 WEST 23 STREETAlteration application consists of New Rooftop Terrace as an accessory space for commercial office and new egress bulkhead. Additional work as shown on plans filed herewith.$74,964
M01387907-I1-MS2026-05-27Mechanical / HVAC1633 BROADWAYDemolition and removal of ductwork as per plans filed herewith. No change in use, egress, occupancy.$18,000
M01378811-I1-MS2026-05-13Mechanical / HVAC10 EAST 40 STREETAlterations of mechanical system on 15th floor as per plans. No change to use, egress or occupancy.$95,000
M01356436-S1-MS2026-05-07Mechanical / HVAC28 WEST 23 STREETMechanical work as shown on plans filed herewith.$25,000
M01385186-I1-GC2026-05-07General construction57 WEST 57 STREETGeneral construction for lobby renovations as shown on plans filed herewith. No change in use, egress, or occupancy.$380,000
M01385186-S1-MS2026-05-07Mechanical / HVAC57 WEST 57 STREETMechanical work as shown on plans filed herewith.$0
M01239647-S2-MS2026-05-05Mechanical / HVAC40 WEST 23 STREETModifications to existing Mechanical Systems as per plans filed herewith. no change in use, egress or occupancy.$750,000
M01378802-I1-GC2026-04-28General construction10 EAST 40 STREETDemolition and general construction on 15th floor as per plans. No change to use, egress or occupancy.$330,000
M01382469-I1-GC2026-04-27General construction291 GRAND STREETAPPLICATION FILED FOR TEMPORARY INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, & FINISHES IN THE CELLAR AND 1ST FL TO RESOLVE ECB VIOLATIONS AS PER PLANS FILED HEREW$102,600
M01239647-I1-GC2026-04-17General construction40 WEST 23 STREETWork includes partial demolition of existing walls and finishes as shown on plans. New convenience stair (PDA00007812), restrooms, & finishes on 5-7TH for a single tenant. Glass en$2,399,138
M01356436-I1-GC2026-04-14General construction28 WEST 23 STREETGeneral construction including renovation of an existing accessory pantry located on accessory terrace. No change in use, egress, or occupancy.$110,000
M01353782-I1-MS2026-04-13Mechanical / HVAC155 EAST 44 STREETMechanical modifications to take place on the 20th floor as per plans filed herewith. No Change in use, egress, or occupancy.$178,600
M01378666-I1-GC2026-04-03General construction5 UNION SQUARE WESTRENOVATION WORK FOR 6TH FLOOR$17,000
M01372891-I1-GC2026-04-01General construction1633 BROADWAYInterior fit-out of the entire 5th floor including non-loadbearing partitions. The project includes offices, meeting rooms and support spaces. No change to use, egress or occupanc$600,000
M01372904-I1-MS2026-03-31Mechanical / HVAC1633 BROADWAYMechanical modifications as per plans filled herewith. No change in use, egress or occupancy.$1,200,000
M01353791-I1-GC2026-03-18General construction155 EAST 44 STREETGeneral construction modifications taking place on the 20th floor as per plans filed herewith. No change in use, egress nor occupancy.$347,700
M01353759-I1-MS2026-03-13Mechanical / HVAC545 MADISON AVENUEMechanical modifications to take place on the 9th construction floor as per plans filed herewith. No Change in use, egress, or occupancy.$3,900
M01323929-I1-GC2026-03-06General construction292 MADISON AVENUEAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (2C/3M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $261,000
M01353730-I1-GC2026-03-04General construction545 MADISON AVENUEGeneral Construction to take place on the 9th floor Construction floor as per plans filed herewith. No change in use, egress, or occupancy.$19,500
M01346296-S1-MS2026-03-04Mechanical / HVAC470 PARK AVENUE SOUTHMechanical work as shown on plans filed herewith.$480,000
M01346296-I1-GC2026-03-04General construction470 PARK AVENUE SOUTHGeneral construction for interior renovations of commercial office tenant spaces on floors 3, 9, and 14(C)/15(M), as shown on plans filed herewith. No change in use, egress or occu$1,200,000
M01237513-S1-MS2026-02-17Mechanical / HVAC28 WEST 23 STREETModifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.$175,000
M01338633-I1-GC2026-02-10General construction470 PARK AVENUE SOUTHGeneral construction as shown on plans filed herewith. No change in use, egress or occupancy.$150,000
M01336285-I1-GC2026-02-02General construction470 PARK AVENUE SOUTHApplication filed for minor interior work and to reflect a passive recreation terrace on the 13th Floor (14th Marketing Floor).$65,000
M01321100-I1-GC2026-01-28General construction245 FIFTH AVENUEGENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 2, 4, 5, 6 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,450,000
M01321111-I1-MS2026-01-27Mechanical / HVAC245 FIFTH AVENUEGENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 2, 4, 5, 6 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000,000
M01331594-I1-GC2026-01-22General construction1370 BROADWAYFILED HEREWITH FOR INTERIOR REMOVAL OF NON-LOAD BEARING WALLS ON THE 6TH FLOOR TO CREATE WHITE BOX AS PER PLAN, NO CHANGE TO USE EGRESS OR OCCUPANCY.$150,000
M01266825-I1-GC2026-01-21General construction16 WEST 22 STREETPARTIAL RENOVATION OF THE EXISTING SECOND FLOOR, INCLUDING INTERIOR FLOOR, CEILING, AND INSTALLATION OF NEW SHEETROCK.$70,800
M01329526-I1-MS2026-01-21Mechanical / HVAC10 EAST 40 STREETMechanical work on partial 22nd floor as per plans. No change to use, egress or occupancy.$10,000
M01329507-I1-GC2026-01-20General construction10 EAST 40 STREETDemolition and general construction work on partial 22nd floor as per plans. No change to use, egress or occupancy.$97,500
M01323347-S1-MS2025-12-30Mechanical / HVAC225 WEST 34 STREETAPPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 21ST FL (INFRASTRUCTURE ENGINEERING) AND ON THE 22ND FLOOR SETBACK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG$99,000
M01336751-I1-GC2025-12-30General construction683 BROADWAYAPPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON THE 1ST FLOOR (STORE) AS PER PLANS FILED HEREWITH. NO CHANGE, IN USE, EGRESS OR OCC$21,300
M01295015-I1-MS2025-12-23Mechanical / HVAC545 5 AVENUEAPPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 9TH FLOOR (SUITE 940 & 950) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,000
M01295010-I1-GC2025-12-23General construction545 5 AVENUEAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 9TH FLOOR (SUITE 940 & 950) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$143,000
M01323347-I1-GC2025-12-22General construction225 WEST 34 STREETAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 21ST FL (INFRASTRUCTURE ENGINEERING) AS PER PLANS FILED HEREWITH. NO CHANGE $407,550
M01315909-I1-MS2025-12-19Mechanical / HVAC155 EAST 44 STREETMechanical modifications taking place on the 11th floor as per plans filed herewith. No change in use, egress nor occupancy.$5,500
M01279429-I1-MS2025-12-17Mechanical / HVAC535 5 AVENUEAPPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 26TH FLOOR (WARD LAW) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$70,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →