COMPANY RECORD · NEW YORK, NY
Nulite Fuel Oil Co., Ltd — permit history in New York, NY
Nulite Fuel Oil Co., Ltd appears on 150 New York permit records from 2019 through 2026, most often mechanical / hvac (54.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 88 | 54.3% |
| Plumbing | 61 | 37.7% |
| General construction | 13 | 8% |
3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 6 |
| 2020 | 45 |
| 2021 | 13 |
| 2022 | 32 |
| 2023 | 14 |
| 2024 | 19 |
| 2025 | 15 |
| 2026 | 18 |
Busiest year on record: 2020, with 45 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Nulite Fuel Oil Co., Ltd | 3 | 2026-07-28 |
1 companies are named alongside Nulite Fuel Oil Co., Ltd on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2314 BRUCKNER BOULEVARD | 2026-07-28 |
| 1880 BARTOW AVENUE | 2026-06-17 |
| 31-40 WHITESTONE EXPRESSWAY | 2026-04-15 |
| 108-44 176 STREET | 2026-03-05 |
| 452 WEST 49 STREET | 2026-02-27 |
| 156-01 LIBERTY AVENUE | 2026-02-11 |
| 33 GREAT JONES STREET | 2026-01-23 |
| 457 17 STREET | 2025-11-07 |
| 5740 BROADWAY | 2025-10-07 |
| 119 EAST 54 STREET | 2025-08-18 |
| 14 MESEROLE AVENUE | 2025-04-10 |
| 3131 RICHMOND TERRACE | 2025-03-03 |
| 223 STUYVESANT AVENUE | 2024-10-25 |
| 1316 DEAN STREET | 2024-08-20 |
100 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $345,000, median $18,750. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
150 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| X01431333-I1-MS | 2026-07-28 | General construction | 2314 BRUCKNER BOULEVARD | REPLACE PACKAGED GAS-FIRED ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $38,780 |
| X01431333-S1-PL | 2026-07-28 | Plumbing | 2314 BRUCKNER BOULEVARD | CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT ROOFTOP PACKAGED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $2,000 |
| X01431333-I1-MS | 2026-07-28 | Mechanical / HVAC | 2314 BRUCKNER BOULEVARD | REPLACE PACKAGED GAS-FIRED ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $38,780 |
| X01395750-S2-PL | 2026-06-17 | Plumbing | 1880 BARTOW AVENUE | RECONNECT GAS PIPING FOR DIRECT REPLACEMENT OF TWO (2) HVAC ROOFTOP UNITS. | $7,000 |
| X01395750-I1-MS | 2026-06-17 | Mechanical / HVAC | 1880 BARTOW AVENUE | DIRECT REPLACEMENT OF TWO (2) HVAC ROOFTOP UNITS. | $10,000 |
| Q01250495-S1-PL | 2026-04-15 | Plumbing | 31-40 WHITESTONE EXPRESSWAY | GAS RECONNECTIONS FOR SEVEN (7) REPLACEMENT SPLIT HVAC FURNACE UNITS. | $10,500 |
| Q01286355-I1-GC-CX | 2026-03-05 | Mechanical / HVAC | 108-44 176 STREET | REPLACE ONE (1) GAS-FIRED FURNACE, CONDENSER UNIT AND EVAPORATOR COIL TO SERVE THE 1ST FLOOR SYSTEM AS PER PLANS. INSTALL NEW FIRE-RATED SHEETROCK WALLS AND DOORS TO CREATE NEW MEC | $21,300 |
| Q01286355-I1-GC-CX | 2026-03-05 | General construction | 108-44 176 STREET | REPLACE ONE (1) GAS-FIRED FURNACE, CONDENSER UNIT AND EVAPORATOR COIL TO SERVE THE 1ST FLOOR SYSTEM AS PER PLANS. INSTALL NEW FIRE-RATED SHEETROCK WALLS AND DOORS TO CREATE NEW MEC | $21,300 |
| Q01286355-S1-PL | 2026-03-04 | Plumbing | 108-44 176 STREET | CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT GAS-FIRED FURNACE TO SERVE THE 1ST FLOOR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,000 |
| M01333242-I1-GC | 2026-02-27 | Mechanical / HVAC | 452 WEST 49 STREET | INSTALL NEW GAS-FIRED FURNACE AS PER PLANS. INSTALL NEW DEHUMIDIFIER AND FRESH AIR DUCTWORK TO MECHANICAL ROOM. REMOVE EXISTING GAS-FIRED BOILER. INSTALL NEW CHIMNEY LINER IN EXIST | $24,340 |
| M01333242-I1-GC | 2026-02-27 | General construction | 452 WEST 49 STREET | INSTALL NEW GAS-FIRED FURNACE AS PER PLANS. INSTALL NEW DEHUMIDIFIER AND FRESH AIR DUCTWORK TO MECHANICAL ROOM. REMOVE EXISTING GAS-FIRED BOILER. INSTALL NEW CHIMNEY LINER IN EXIST | $24,340 |
| M01333242-I1-MS | 2026-02-20 | General construction | 452 WEST 49 STREET | INSTALL NEW GAS-FIRED FURNACE AS PER PLANS. INSTALL NEW DEHUMIDIFIER AND FRESH AIR DUCTWORK TO MECHANICAL ROOM. REMOVE EXISTING GAS-FIRED BOILER. INSTALL NEW CHIMNEY LINER IN EXIST | $24,340 |
| M01333242-I1-MS | 2026-02-20 | Mechanical / HVAC | 452 WEST 49 STREET | INSTALL NEW GAS-FIRED FURNACE AS PER PLANS. INSTALL NEW DEHUMIDIFIER AND FRESH AIR DUCTWORK TO MECHANICAL ROOM. REMOVE EXISTING GAS-FIRED BOILER. INSTALL NEW CHIMNEY LINER IN EXIST | $24,340 |
| M01333242-S1-PL | 2026-02-20 | Plumbing | 452 WEST 49 STREET | CONNECT TO EXISTING GAS PIPING FOR NEW GAS-FIRED FURNACE AS PER PLANS. REMOVE EXISTING GAS-FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $1,000 |
| Q01343198-I1-MS | 2026-02-11 | Mechanical / HVAC | 156-01 LIBERTY AVENUE | DIRECT REPLACEMENT OF TWO (2) ROOFTOP PACKAGE UNITS AND THREE (3) SPLIT HVAC SYSTEMS. | $20,000 |
| Q01343198-S1-PL | 2026-02-11 | Plumbing | 156-01 LIBERTY AVENUE | RECONNECT GAS PIPING FOR DIRECT REPLACEMENT OF TWO (2) ROOF TOP PACKAGE UNITS AND THREE (3) SPLIT HVAC SYSTEMS. | $15,000 |
| M01344466-I1-GC-CX | 2026-01-23 | General construction | 33 GREAT JONES STREET | INSTALL REPLACEMENT DUCTED SPLIT AC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $30,200 |
| M01344466-I1-GC-CX | 2026-01-23 | Mechanical / HVAC | 33 GREAT JONES STREET | INSTALL REPLACEMENT DUCTED SPLIT AC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $30,200 |
| B01230539-I1-GC | 2025-11-07 | Mechanical / HVAC | 457 17 STREET | INSTALL SPLIT DUCTLESS AC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $35,000 |
| B01230539-I1-GC | 2025-11-07 | General construction | 457 17 STREET | INSTALL SPLIT DUCTLESS AC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $35,000 |
| Q01250495-I1-MS | 2025-10-22 | Mechanical / HVAC | 31-40 WHITESTONE EXPRESSWAY | REPLACE SEVEN (7) SPLIT HVAC SYSTEMS | $28,000 |
| X01221943-S1-PL | 2025-10-07 | Plumbing | 5740 BROADWAY | GAS CONNECTION TO EIGHT (8) ROOF TOP HVAC UNITS ON 1st FLOOR ROOF FOR VICTORIA'S NAIL BAR AND FLAME HIBACHI. | $20,000 |
| X01221943-I1-MS | 2025-10-07 | Mechanical / HVAC | 5740 BROADWAY | REGISTER ONE (1) REFRIGERATION CONDENSER UNIT ON 1st FLOOR ROOF FOR FLAME HIBACHI WALK-IN BOX. | $24,000 |
| B01265852-I1-GC | 2025-08-18 | General construction | 119 EAST 54 STREET | INSTALL TWO (2) SPLIT AC SYSTEMS TO SERVE 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $29,400 |
| B01265852-I1-GC | 2025-08-18 | Mechanical / HVAC | 119 EAST 54 STREET | INSTALL TWO (2) SPLIT AC SYSTEMS TO SERVE 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $29,400 |
| B01265852-I1-MS | 2025-08-15 | Mechanical / HVAC | 119 EAST 54 STREET | INSTALL TWO (2) SPLIT AC SYSTEMS TO SERVE 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $29,400 |
| B01265852-I1-MS | 2025-08-15 | General construction | 119 EAST 54 STREET | INSTALL TWO (2) SPLIT AC SYSTEMS TO SERVE 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $29,400 |
| B01230539-I1-MS | 2025-08-08 | General construction | 457 17 STREET | INSTALL SPLIT DUCTLESS AC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $35,000 |
| B01230539-I1-MS | 2025-08-08 | Mechanical / HVAC | 457 17 STREET | INSTALL SPLIT DUCTLESS AC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $35,000 |
| B01196705-S1-PL | 2025-04-10 | Plumbing | 14 MESEROLE AVENUE | CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT ROOFTOP PACKAGE HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,000 |
| B01196705-I1-MS | 2025-04-10 | Mechanical / HVAC | 14 MESEROLE AVENUE | REPLACE ROOFTOP PACKAGE HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $42,000 |
| S01164847-I1-MS | 2025-03-03 | Mechanical / HVAC | 3131 RICHMOND TERRACE | DIRECT REPLACEMENTOF THREE (3) HVAC ROOFTOP UNITS | $21,000 |
| S01164847-S1-PL | 2025-02-28 | Plumbing | 3131 RICHMOND TERRACE | GAS RECONNECTION FOR DIRECT REPLACEMENT OF THREE (3) HVAC ROOFTOP UNITS | $9,000 |
| B00852896-I1-MS | 2024-10-25 | Mechanical / HVAC | 223 STUYVESANT AVENUE | INSTALL SPLIT AC UNIT WITHIN EXISTING 2 FAMILY HOUSE. | $31,000 |
| B01083048-I1-GC-CX | 2024-08-20 | General construction | 1316 DEAN STREET | INSTALL FOUR (4) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $35,800 |
| B01083048-I1-GC-CX | 2024-08-20 | Mechanical / HVAC | 1316 DEAN STREET | INSTALL FOUR (4) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $35,800 |
| Q01071141-I1-MS | 2024-08-12 | Mechanical / HVAC | 97-09 101 AVENUE | INSTALL ONE (1) NEW ROOFTOP AC UNIT ON EXISTING DUNNAGE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $13,000 |
| Q01041006-I1-MS | 2024-05-23 | Mechanical / HVAC | 121-31 199 STREET | REPLACE TWO (2) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $15,000 |
| Q01015864-I1-MS | 2024-03-26 | Mechanical / HVAC | 79-24 JAMAICA AVENUE | REPLACE PACKAGED ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $22,000 |
| Q01015864-S1-PL | 2024-03-26 | Plumbing | 79-24 JAMAICA AVENUE | CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT PACKAGED ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $3,000 |
| Q01010921-I1-PL | 2024-03-06 | Plumbing | 84-37 88 STREET | GAS REPIPE TO DOMESTIC COOKING AND DRYERS. | $16,950 |
| B00991049-I1-MS | 2024-02-28 | Mechanical / HVAC | 2941 ATLANTIC AVENUE | DIRECT REPLACEMENT OF A SPLIT HVAC SYSTEM | $6,000 |
| B00991049-S2-PL | 2024-02-28 | Plumbing | 2941 ATLANTIC AVENUE | GAS RECONNECTION FOR DIRECT REPLACEMENT OF FURNACE IN A SPLIT HVAC SYSTEM. | $5,000 |
| B01002395-I1-PL | 2024-02-12 | Plumbing | 540 KINGSLAND AVENUE | CUT AND CAP OF DOMESTIC WATER AND GAS FIXTURES FOR PARTIAL DEMOLITION OF BUILDING. | $3,000 |
| B00976914-I1-MS | 2024-01-25 | Mechanical / HVAC | 900 ATLANTIC AVENUE | REGISTER SEVEN (7) A.C.CONDENSERS ON ROOF, MISFILED ON BIS APPLICATION 320208672. | $14,000 |
| Q00989859-I1-PL | 2024-01-19 | Plumbing | 59-13 56 STREET | GAS RE-PIPE TO RESTORE GAS IN CONJUCTION WITH LAA Q00952614, Q00960401 AND BIS JOB# 400929395. | $57,400 |
| Q00984269-S1-PL | 2024-01-17 | Plumbing | 119-24 JAMAICA AVENUE | GAS RECONNECTION FOR DIRECT REPLACEMENT OF SPLIT HVAC SYSTEM FOR OFFICE AREA FURNACE | $3,500 |
| Q00984269-I1-MS | 2024-01-17 | Mechanical / HVAC | 119-24 JAMAICA AVENUE | Direct replacement of Split HAVC System for office area | $4,000 |
| B00945207-I1-GC | 2024-01-16 | General construction | 560 ROCKAWAY AVENUE | INSTALL NINE (9) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $226,000 |
| B00945207-I1-GC | 2024-01-16 | Mechanical / HVAC | 560 ROCKAWAY AVENUE | INSTALL NINE (9) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $226,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
