COMPANY RECORD · NEW YORK, NY
Lnm Construction LLC — permit history in New York, NY
Lnm Construction LLC appears on 44 New York permit records from 2021 through 2026, most often general construction (89.4% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 42 | 89.4% |
| Mechanical / HVAC | 5 | 10.6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 6 |
| 2022 | 8 |
| 2023 | 4 |
| 2024 | 11 |
| 2025 | 14 |
| 2026 | 4 |
Busiest year on record: 2025, with 14 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| S & J Industrial Corp | 5 | 2026-04-24 |
1 companies are named alongside Lnm Construction LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 37-18 NORTHERN BOULEVARD | 2026-04-29 |
| 42-03 35 STREET | 2026-03-19 |
| 68 JAY STREET | 2026-03-04 |
| 501 WORTHEN STREET | 2025-10-01 |
| 79 FRANKLIN STREET | 2025-09-09 |
| 155 WATER STREET | 2025-07-08 |
| 616 SCHOLES STREET | 2025-06-30 |
| 92 3 STREET | 2025-06-13 |
| 21-07 41 AVENUE | 2025-06-12 |
| 73 JAY STREET | 2025-04-30 |
| 65 JAY STREET | 2025-04-30 |
| 47-16 AUSTELL PLACE | 2024-11-21 |
| 81 PROSPECT STREET | 2024-11-07 |
| 2301 SNYDER AVENUE | 2024-07-09 |
27 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $3,000 to $2,669,961, median $90,366. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
44 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01367509-I1-GC | 2026-04-29 | General construction | 37-18 NORTHERN BOULEVARD | FILING TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY TO SUPERSEDE AND REFILE APPLICATION # 420193070. NO CHANGE TO EXISTING BULK. | $1,390,500 |
| Q01356927-I1-GC-CX | 2026-03-19 | General construction | 42-03 35 STREET | INTERIOR RENOVATION OF EXISTING OFFICE SPACE AT 1ST FLOOR & EXTERIOR FACADE REPAIR AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,695,000 |
| Q01356927-I1-GC-CX | 2026-03-19 | Mechanical / HVAC | 42-03 35 STREET | INTERIOR RENOVATION OF EXISTING OFFICE SPACE AT 1ST FLOOR & EXTERIOR FACADE REPAIR AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,695,000 |
| B01259156-I1-GC | 2026-03-04 | General construction | 68 JAY STREET | Propose to dismantle (3) three water tower supports down to concrete base. The existing roof to remain untouched. No change to egress or occupancy. | $36,000 |
| Q01311979-I1-GC | 2025-11-06 | General construction | 37-18 NORTHERN BOULEVARD | Propose interior renovations at existing offices as per plan. No change in use, egress or occupancy. | $247,267 |
| X01252932-I1-GC | 2025-10-01 | General construction | 501 WORTHEN STREET | PROPOSE TO REPAIR EXISTING CONCRETE RAMP & SLAB AND REMOVE A PLATFORM AS PER PLAN. REMEDY ECB VIOLATION # 3528544P. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $213,665 |
| B00773488-I1-GC | 2025-09-09 | General construction | 79 FRANKLIN STREET | CONVERT EXISTING TRADE EXPOSITION TO HEALTH AND FITNESS ESTABLISHMENT UG 9. MINOR WORK TO INCLUDE ADDITIONAL MEZZANINE ALL AS INDICATED ON PLAN. NEW CERTIFICATE OF OCCUPANCY TO BE | $138,100 |
| B00781670-I1-GC | 2025-07-08 | General construction | 155 WATER STREET | PROPOSE TO REPLACE AND OR REPLACE LOOSE MASONRY AT EXISTING CHIMNEY AT ROOF TO CORRECT DOB VIOL NO 082404CO7RB02 ECB VIOL NO34450457J. | $7,500 |
| B01246351-I1-GC | 2025-06-30 | General construction | 616 SCHOLES STREET | Repair existing roofing that was damaged from severe weather as per plan. Remedy violation # CER02CW & CER02MP. No change in bulk, use, egress or occupancy. See attached enginee | $50,000 |
| B01209795-I1-GC-CX | 2025-06-13 | Mechanical / HVAC | 92 3 STREET | Interior Renovation for existing retail space @ 1st floor. No change in use, egress or occupancy. | $153,000 |
| B01209795-I1-GC-CX | 2025-06-13 | General construction | 92 3 STREET | Interior Renovation for existing retail space @ 1st floor. No change in use, egress or occupancy. | $153,000 |
| Q01231541-I1-GC | 2025-06-12 | General construction | 21-07 41 AVENUE | Propose interior renovations as per plan @ 2nd through 5th floor. Change of occupancy is filed under ALt 1 # 421775546. | $504,410 |
| B01182593-I1-GC | 2025-04-30 | General construction | 73 JAY STREET | Propose to remedy ECB violation # 39068124X and remove the canopy facing Front Street. No change in use, egress or occupancy. | $5,000 |
| B01182576-I1-GC | 2025-04-30 | General construction | 65 JAY STREET | Propose to remedy ECB violation # 35226210H and remove existing business sign at front door. No change in use, egress or occupancy. | $3,000 |
| B01192381-I1-MS | 2025-04-09 | Mechanical / HVAC | 92 3 STREET | Propose to remove existing HVAC system and install new mini split systems as per plan. No change in use, egress or occupancy. | $345,000 |
| B01172506-I1-GC | 2025-02-05 | General construction | 92 3 STREET | Interior Renovation for existing offices @ 3rd and 4th floor. No change in use, egress, or occupancy. | $107,200 |
| B01135542-I1-GC | 2025-01-30 | General construction | 92 3 STREET | Interior renovation for existing offices @ cellar, 1st and 2nd floor. Remove existing convenient stairs & provide new 3x12 wood joist at the stair opening as per plan. No change | $2,669,961 |
| B01148750-I1-GC | 2025-01-22 | General construction | 68 JAY STREET | Proposed to lower existing chimney (not in service) to 9th floor level as per plan. No change in bulk, use, egress or occupancy. | $10,000 |
| Q01114753-I1-GC | 2024-11-21 | General construction | 47-16 AUSTELL PLACE | Propose to remove non-load bearing interior partitions and propose new partitions 3rd fl as per plan. No change in use, egress, or occupancy. | $711,205 |
| B01144094-I1-GC | 2024-11-20 | General construction | 92 3 STREET | PROPOSE TO REMOVE NON-LOAD BEARING PARTITIONS AND DOORS AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $565,660 |
| B01059730-S1-GC | 2024-11-07 | General construction | 81 PROSPECT STREET | Propose new non-load bearing partitions and doors as per plan. New 1st FL ramp as per plan No change in use, egress, or occupancy. | $100,000 |
| B00716284-I1-GC | 2024-07-09 | General construction | 2301 SNYDER AVENUE | interior alterations and new bathrooms | $287,500 |
| B01064724-I1-MS | 2024-06-26 | Mechanical / HVAC | 81 PROSPECT STREET | Propose to remove existing HVAC system and insall new mini split system as per plan. No change in use, egress or occupancy. | $153,000 |
| B01059730-I1-GC | 2024-06-05 | General construction | 81 PROSPECT STREET | Propose to remove interior non-load bearing partitions as per plan. No change in Use, Egress, or Occupancy. | $80,000 |
| B00981203-I1-GC-CX | 2024-05-14 | General construction | 168 VAN DYKE STREET | PROPOSE TO CONVERT EXISTING WAREHOUSE TO RETAIL USE. NEW PARTITIONS AND MECHANICAL WORK AS PER PLAN. OBTAIN NEW CERTIFICATE OF OOCUPANCY. | $371,400 |
| B00981203-I1-GC-CX | 2024-05-14 | Mechanical / HVAC | 168 VAN DYKE STREET | PROPOSE TO CONVERT EXISTING WAREHOUSE TO RETAIL USE. NEW PARTITIONS AND MECHANICAL WORK AS PER PLAN. OBTAIN NEW CERTIFICATE OF OOCUPANCY. | $371,400 |
| B01015248-I1-GC | 2024-04-09 | General construction | 195 PLYMOUTH STREET | Propose interior partition work at 6th floor as per plan. No change in bulk, use, egress or occupancy. | $104,000 |
| B00961093-I1-GC | 2024-02-07 | General construction | 147 PRINCE STREET | PROPOSE TO REMOVE INTERIOR PARTITIONS AT 1ST FLOOR AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $20,000 |
| B00949335-I1-GC-CX | 2024-01-29 | General construction | 162 VAN DYKE STREET | PROPOSE TO CONVERT MANUFACTURE TO COMMERCIAL SPACE AND REPAIR PARTIAL ROOF JOIST & SHEATHING AS PER PLAN. REMEDY ECB VIOLATION # 39079749P. OBTAIN NEW CERTIFICATE OF OCCUPANCY. | $328,186 |
| B00870515-I1-GC-CX | 2023-06-22 | General construction | 168 VAN DYKE STREET | NEW WALL OPENING AT CELLAR, REPAIR PARTIAL ROOF JOISTS AND SHEATHING FACING VAN DYKE STREET. REMEDY ECB VIOLATION 039078756N. NO CHANGE IN BULK, USE, OCCUPANCY OR EGRESS. | $30,000 |
| B08041246-I1-GC | 2023-03-29 | General construction | 13 EVERIT STREET | PROPOSE TO REPLACE EXISTING ASPHALT WITH NEW ASPHALTIC CONCRETE OVER EXISTING GRAVEL. | $87,540 |
| B08048704-I1-GC | 2023-03-17 | General construction | 68 JAY STREET | PROPOSE TO DISMANTLE EXISTING INTERIOR PARTITIONS. | $15,000 |
| B00541313-I1-GC | 2023-01-11 | General construction | 68 JAY STREET | NEW STORFRONT AND RAMP AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS. | $30,000 |
| B00736398-I1-GC | 2022-11-29 | General construction | 155 WATER STREET | Replace brick corbelling at parapets, sound and replace loose and/or cracked parging, rebuild top 4 courses of the chimney, replace cracked brick, replace deteriorated windowsills. | $259,450 |
| X00785304-I1-GC | 2022-09-29 | General construction | 531 TIFFANY STREET | REPAIR AND REPLACE DAMAGED PARTIAL ROOF AS PER PLAN. REMEDY ECB VIOL. 39066154H. | $25,000 |
| B00696728-I1-GC | 2022-08-30 | General construction | 168 VAN DYKE STREET | PROPOSE NEW STORAGE ROOMS AT CELLAR AND FIRST FLOOR. WAREHOUSE USED FOR STORAGE OF GOODS SORTED AND STORED IN INDIVIDUALLY LOCKED STORAGE ROOMS. NO CHANGE IN USE, OCCUPANCY OR EGRE | $104,712 |
| B00648351-I1-GC | 2022-02-10 | General construction | 140 PLYMOUTH STREET | PROPOSE TO REMOVE ALL ERECTED STRUCTURES AT ROOF EXCEPT STAIR AND ELEVATOR BULKHEADS TO COMPLY WITH DOB VIOLATION 051117CMTFJR05, ECB 352257643P. NO CHANGE TO USE, OCCUPANCY OR EGR | $25,113 |
| B00570759-I1-GC | 2022-01-18 | General construction | 53 BRIDGE STREET | PROPOSE TO INFILL EXISTING SIDEWALK VAULT FACING WATER STREET. NO CHANGE IN USE OCCUPANCY OR EGRESS. | $64,850 |
| B00610461-I1-GC | 2022-01-12 | General construction | 168 VAN DYKE STREET | INSTALL NEW WINDOWS, REPAIR STUCCO, REPOINT AND REPLACE EXTERIOR BRICK ALL AS PER PLAN. NO CHANGE IN BULK, USE, EGRESS OR OCCUPANCY. | $75,321 |
| B00610484-I1-GC | 2022-01-06 | General construction | 169 COFFEY STREET | REMOVE EXISTING ROLLING GATES AND REPLACE WITH STOREFRONT WINDOW AS PER PLAN. NO CHANGE IN BULK, USE, EGRESS OR OCCUPANCY. | $41,168 |
| B00624167-I1-GC | 2022-01-03 | General construction | 29 MESEROLE AVENUE | MINOR NON-STRUCTURAL REMOVAL IN CONNECTION WITH STOREFRONT REPLACEMENT ALT TYPE II APPLICATION: INTERIOR NON-BEARING WALL DEMOLITION. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER TH | $90,366 |
| B00610560-I1-GC | 2021-12-09 | General construction | 162 VAN DYKE STREET | INSTALL NEW WINDOWS, REPAIR STUCCO, REPOINT AND REPLACE EXTERIOR BRICK AS PER PLAN. NO CHANGE IN BULK, USE, EGRESS OR OCCUPANCY. | $75,664 |
| B00568603-I1-GC | 2021-11-18 | General construction | 1317 36 STREET | MINOR INTERIOR NON-STRUCTURAL ALT TYPE II APPLICATION: NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. NO STRUCTURAL WORK WILL BE PERFORMED UNDER THIS APPLICATION. 4 | $34,152 |
| B00547463-I1-GC | 2021-07-13 | General construction | 43 CHURCH AVENUE | NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. NO STRUCTURAL WORK WILL BE PERFORMED UNDER THIS APPLICATION. 4 CONCRETE OVER-POUR (NON-STRUCTURAL) FOR EXISTING SLAB | $49,761 |
| B00449336-I1-GC | 2021-03-11 | General construction | 141 FLUSHING AVENUE | 12TH FLOOR. HEREWITH FILING FOR INSTALLATION OF NON LOAD BEARING PARTITIONS. NO CHANGE IN USE. EGRESS, OR OCCUPANCY | $33,000 |
| B00449318-I1-GC | 2021-03-11 | General construction | 141 FLUSHING AVENUE | 11TH FLOOR. HEREWITH FILING FOR INSTALLATION OF NON LOAD BEARING PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $33,000 |
| B00449286-I1-GC | 2021-03-11 | General construction | 141 FLUSHING AVENUE | 10TH FLOOR. HEREWITH FILING FOR INSTALLATION OF NON LOAD BEARING PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY | $33,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
