COMPANY RECORD · NEW YORK, NY
Production Contract. LLC — permit history in New York, NY
Production Contract. LLC appears on 57 New York permit records from 2019 through 2026, most often general construction (50% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 30 | 50% |
| Mechanical / HVAC | 30 | 50% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 3 |
| 2020 | 5 |
| 2021 | 12 |
| 2022 | 6 |
| 2023 | 15 |
| 2024 | 13 |
| 2025 | 4 |
| 2026 | 2 |
Busiest year on record: 2023, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Schumacher & Farley P&H C | 6 | 2025-02-21 |
| Capitol Fire Sprinkler Co | 1 | 2024-11-18 |
2 companies are named alongside Production Contract. LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1585 BROADWAY | 2026-06-22 |
| 48-20 57 AVENUE | 2025-05-14 |
| 2040 FOREST AVENUE | 2025-03-20 |
| 5202 THIRD AVENUE | 2025-02-10 |
| 90 PARK AVENUE | 2024-12-11 |
| 185 MADISON AVENUE | 2024-09-25 |
| 2101 CHURCH AVENUE | 2024-08-12 |
| 1500 BROADWAY | 2024-08-08 |
| 219-29 89 AVENUE | 2024-06-11 |
| 390 1 AVENUE | 2024-05-21 |
| 462 7 AVENUE | 2024-05-20 |
| 207 EAST 119 STREET | 2024-02-14 |
| 393 THIRD AVENUE | 2024-02-12 |
| 120 CHURCH STREET | 2023-12-11 |
40 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $797,176, median $98,750. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
57 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01390459-I1-GC | 2026-06-22 | General construction | 1585 BROADWAY | AN INTERIOR ALTERATION OF A COFFEE SHOP WHICH INCLUDES THE INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, CEILINGS, DOORS, AND THEIR RELATED FINISHES AS PER PLANS FILED HEREWITH. | $797,176 |
| M01390693-I1-MS | 2026-06-16 | Mechanical / HVAC | 1585 BROADWAY | Removal of existing HVAC,WSHP, & equipment and distribution and replacement with same as per plans filed herewith. No change in use, egress or occupancy. | $235,636 |
| Q01113858-S1-MS | 2025-05-14 | Mechanical / HVAC | 48-20 57 AVENUE | MECHANICAL MODIFICATIONS TO GROUND FLOOR WAREHOUSE SPACE WORK AS PER PLANS SUBMITTED. | $30,250 |
| S01116926-S2-MS | 2025-03-20 | Mechanical / HVAC | 2040 FOREST AVENUE | MODIFICATIONS AND UPGRADES TO BUILDING MECHANICAL/HVAC SYSTE TO SERVE STARBUCKS TENANT SPACE ON THE FIRST FLOOR. EXISTING HVAC EQUIPMENT TO REMAIN. | $20,000 |
| B01174316-I1-GC | 2025-02-10 | General construction | 5202 THIRD AVENUE | FILING HEREWITH FOR INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE PER PLANS ATTACHED. THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $74,876 |
| S01116926-I1-GC | 2025-02-10 | General construction | 2040 FOREST AVENUE | RENOVATION OF AN EXISTING STARBUCKS COFFEE SHOP - NO CHANGE TO OCCUPANCY USE OR EGRESS. | $260,500 |
| M00947839-I1-GC | 2024-12-11 | General construction | 90 PARK AVENUE | Proposing to renovation existing retail space - new soffit, new finishes, casework, equipment, minor mechanical work, wall treatments, furniture and graphics. All work as per plan | $138,490 |
| Q01113858-I1-GC | 2024-10-17 | General construction | 48-20 57 AVENUE | Filing herewith interior renovation of an existing warehouse space per plans attached. There is no change in use occupancy or egress. | $97,500 |
| M01104965-S1-MS | 2024-09-25 | Mechanical / HVAC | 185 MADISON AVENUE | MECHANICAL MODIFICATION TO GROUND FLOOR RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $39,000 |
| M01104965-I1-GC | 2024-09-11 | General construction | 185 MADISON AVENUE | FILING HEREWITH INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE PER PLANS ATTACHED. THERE IS NO CHANGE IN USE OCCUPANCY OR EGRESS, | $265,000 |
| B01050847-I1-MS | 2024-08-12 | Mechanical / HVAC | 2101 CHURCH AVENUE | Application filed for new duct work all as per plans. All other MS work filed under B01026403. No change to use egress or occupancy. | $236,600 |
| B00994364-I1-GC | 2024-08-12 | General construction | 2101 CHURCH AVENUE | Interior renovation minor load non bearing partitions, and removal of storefront. No change in use, egress, or occupancy | $295,750 |
| M01056367-I1-GC | 2024-08-08 | General construction | 1500 BROADWAY | Renovation of existing retail space - Remove and install interior partitions, floor & ceiling finishes, equipment, casework modify soffit, graphics and wall treatment. | $102,900 |
| Q01049322-I1-MS | 2024-06-11 | Mechanical / HVAC | 219-29 89 AVENUE | DIRECT REPLACEMENT OF TWO (2) 15-TON AC UNITS ON EXISTING STEEL DUNNAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $90,000 |
| M00937833-I1-GC | 2024-05-21 | General construction | 390 1 AVENUE | Filing herewith renovation of an existing Starbucks as per plans filed herewith. No change to use, egress or occupancy. AKA address: 400 East 23rd Street. | $282,000 |
| M01013540-I1-GC | 2024-05-20 | General construction | 462 7 AVENUE | APPLICATION FILED FOR AN ALTERATION OF AN EXISTING RETAIL SPACE INCLUDING NONLOAD BEARING PARTIIONS, FINISHES, LIGHTING AND ALL OTHER RELATED WORK AS PER PLANS. NO CHANGE IN USE, E | $313,775 |
| M00983683-I1-GC | 2024-02-14 | General construction | 207 EAST 119 STREET | REPLACE IN KIND EXISTING PAINTED SHEET METAL CORNICE ON EXISTING WOOD FRAMING. REPLACE DAMAGED WOOD MEMBER IN KIND AS NEEDED. | $50,000 |
| M00932565-I1-MS | 2024-02-12 | Mechanical / HVAC | 393 THIRD AVENUE | Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy. | $29,996 |
| M00932481-I1-GC | 2024-02-12 | General construction | 393 THIRD AVENUE | Filing herewith renovation to an existing Starbucks as per plans filed herewith. No change to use, egress or occupancy. | $181,438 |
| M00941454-I1-GC | 2023-12-11 | General construction | 120 CHURCH STREET | INTERIOR RENOVATION TO EXISTING STARBUCKS STORE. NEW FLOOR, WALL, AND CEILING FINISHES, NEW ARTWORK, CASEWORK, NEW CAFE FIXTURES, AND LIGHTING. ELECTRICAL WORK TO BE FILED SEPARATE | $90,000 |
| M00813368-I1-GC-CX | 2023-12-04 | General construction | 1328 YORK AVENUE | application is filed for alteration of existing retail space including non load bearing partitions , finishes , lighting and mechanical system. All other related work as per plans. | $593,125 |
| M00813368-I1-GC-CX | 2023-12-04 | Mechanical / HVAC | 1328 YORK AVENUE | application is filed for alteration of existing retail space including non load bearing partitions , finishes , lighting and mechanical system. All other related work as per plans. | $593,125 |
| M00885490-I1-GC-CX | 2023-11-21 | General construction | 372 GREENWICH STREET | application filed for an interior renovation of an exstng retail space,including new nonload bearing partitions,finishes,lighting and all other related work as per plans.no exterio | $327,125 |
| M00885490-I1-GC-CX | 2023-11-21 | Mechanical / HVAC | 372 GREENWICH STREET | application filed for an interior renovation of an exstng retail space,including new nonload bearing partitions,finishes,lighting and all other related work as per plans.no exterio | $327,125 |
| Q00930093-I1-GC-CX | 2023-11-03 | General construction | 48-20 57 AVENUE | ERECT ELEVATOR SHAFT FROM 1ST FLOOR TO 4TH FLOOR. INSTALL PARTITION ON 1ST FLOOR FOR ELEVATOR MACHINE ROOM. REMOVE EXISTING FLOOR SLAB FOR NEW ELEVATOR SHAFT. NO CHANGE IN USE, EGR | $114,670 |
| M00874175-I1-GC | 2023-06-28 | General construction | 585 2 AVENUE | Proposed renovation to existing Starbucks Coffee Shop. Plumbing and electrical work filed under separate application. | $148,000 |
| B00874212-I1-GC | 2023-06-14 | General construction | 67 FRONT STREET | Proposed renovation to existing Starbucks Coffee Shop. Plumbing, mechanical, sprinkler, and electrical filed under separate applications. | $95,400 |
| B00874243-I1-MS | 2023-06-14 | Mechanical / HVAC | 67 FRONT STREET | Modification to existing mechanical system ductwork. | $10,000 |
| X00854039-I1-GC | 2023-05-16 | General construction | 260 EAST 161 STREET | Filing herewith renovation to an existing Starbucks as per plans filed herewith. No change to use, egress or occupancy. | $250,000 |
| X00855557-I1-MS | 2023-05-16 | Mechanical / HVAC | 260 EAST 161 STREET | Filing herewith Mechanical work as per plans filed herewith. No change to use, egress or occupancy. | $6,192 |
| M00821153-I1-GC | 2023-02-16 | General construction | 14 WEST 23 STREET | Filing herewith interior renovation of an existing Starbucks as per plans filed herewith. No change to use, egress or occupancy. | $187,452 |
| M08013630-I1-ST | 2023-01-05 | General construction | 155 WATER STREET | Proposing for new tenant in retail space -1st floor removal and install interior partitions, flooring & ceiling finishes, casework, infill floor area in prior elevator lift area (E | $473,980 |
| M08013740-I1-MS | 2023-01-04 | Mechanical / HVAC | 155 WATER STREET | Proposing for new retail tenant Space - proposing to install the rooftop (3) HVAC units, work to include ductwork, air curtain and Energy Management system. All work as per plans | $138,272 |
| M08013630-I1-GC | 2023-01-04 | General construction | 155 WATER STREET | Proposing for new tenant in retail space -1st floor removal and install interior partitions, flooring & ceiling finishes, casework, infill floor area in prior elevator lift area (E | $473,980 |
| M08016854-I1-GC | 2022-11-03 | General construction | 400 EAST 90 STREET | Filing herewith interior renovation of existing 1st floor space. No change in use, egress or occupancy. | $250,011 |
| M00724269-I1-MS | 2022-08-01 | Mechanical / HVAC | 1004 2 AVENUE | FILING HEREWITH RELATED MECHANICAL WORK FOR THE INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE. NO CHANGE IS USE, OCCUPANCY OR EGGRESS. | $35,003 |
| M00723675-I1-GC | 2022-07-06 | General construction | 1004 2 AVENUE | FILING HEREWITH INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE. ADDITION OF AN ADA RAMP. THERE IS NO CHANGE IN USE, OCCUPANCY OR EGGRESS. | $25,033 |
| B00726241-I1-GC-CX | 2022-05-20 | Mechanical / HVAC | 521 EAST 80 STREET | Proposing for new tenant-work to include remove/install interior partitions, storefront areas, floor & ceiling finishes, rooftop units, concrete curbing,walkway,ramp, concrete pave | $533,200 |
| B00726241-I1-GC-CX | 2022-05-20 | General construction | 521 EAST 80 STREET | Proposing for new tenant-work to include remove/install interior partitions, storefront areas, floor & ceiling finishes, rooftop units, concrete curbing,walkway,ramp, concrete pave | $533,200 |
| Q00680142-I1-MS | 2022-05-13 | Mechanical / HVAC | 118-10 QUEENS BOULEVARD | DIRECT REPLACEMENT OF ONE EXISTING ROOTOP AC UNIT ON EXISTING ROOF CURB. RECONNECT TO EXISTING SUPPLY/RETURN DUCTWORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $15,000 |
| B00567170-I1-GC | 2021-10-25 | General construction | 180 MYRTLE AVENUE | Hereby Filing Built-up slab, ramp and stairs on structural foam, Steel lintel over new door, mechanical penetration in slab and steel framing for movable partition support | $27,250 |
| M00462576-I1-GC | 2021-10-25 | General construction | 135 PRINCE STREET | DEMO /CONSTRUCTION: FILING FOR RENOVATION TO AN EXISTING COMMERCIAL SPACE ON THE 1ST FLOOR. WORK INCLUDES REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS, DOORS, F | $17,000 |
| M00462587-I1-GC | 2021-09-08 | General construction | 133 PRINCE STREET | DEMO /CONSTRUCTION: FILING FOR RENOVATION TO AN EXISTING COMMERCIAL SPACE ON THE 1ST FLOOR. WORK INCLUDES REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS, DOORS, F | $1,800 |
| M00429848-I1-MS | 2021-08-20 | Mechanical / HVAC | 135 PRINCE STREET | Filing for mechanical work on the 1st floor. No change to use, egress, or occupancy. | $1,000 |
| M00544559-I1-MS | 2021-07-19 | Mechanical / HVAC | 1280 LEXINGTON AVENUE | Installation of mechanical systems and associated ductwork as per plans filed. No change to use, egress or occupancy proposed. | $29,500 |
| M00343035-I1-MS | 2021-07-19 | Mechanical / HVAC | 725 5 AVENUE | APPLICATION FILED FOR MECHANICAL WORK ON THE 14TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $20,000 |
| M00544537-I1-GC | 2021-07-16 | General construction | 1280 LEXINGTON AVENUE | Removal and installation of interior non-load bearing partitions and related finishes as per plans. There will be no change in use, egress, or occupancy. | $50,000 |
| B00347555-I1-MS | 2021-06-15 | Mechanical / HVAC | 180 MYRTLE AVENUE | HEREBY FILING NEW HVAC SYSTEM FOR THE BROOKLYN COMMUNITY SERVICE DAY CARE SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $223,440 |
| M00492032-I1-GC | 2021-06-13 | General construction | 435 WEST 31 STREET | Interior work related to retail space as shown on plans filed herewith. | $176,058 |
| M00492102-I1-MS | 2021-06-13 | Mechanical / HVAC | 435 WEST 31 STREET | Mechanical work related to interior renovation of retail space as shown on plans filed herewith. | $234,988 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
