COMPANY RECORD · NEW YORK, NY
J. Lyons Contracting Inc — permit history in New York, NY
J. Lyons Contracting Inc appears on 47 New York permit records from 2022 through 2026, most often general construction (51.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 24 | 51.1% |
| Mechanical / HVAC | 23 | 48.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 17 |
| 2023 | 4 |
| 2024 | 7 |
| 2025 | 7 |
| 2026 | 12 |
Busiest year on record: 2022, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Dependable Mechanical Cor | 14 | 2026-08-28 |
| Plbg P & H Inc | 14 | 2026-07-16 |
| Dependable Mech Corp | 6 | 2026-06-05 |
| A + Sprinkler Corp | 5 | 2025-02-21 |
4 companies are named alongside J. Lyons Contracting Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 50 BROAD STREET | 2026-06-15 |
| 88 PINE STREET | 2026-06-10 |
| 125 EAST 23 STREET | 2024-01-30 |
| 620 9 AVENUE | 2022-08-11 |
4 distinct addresses on record. Declared value on record runs from $1,900 to $1,099,980, median $102,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
47 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01391620-S1-MS | 2026-06-15 | Mechanical / HVAC | 50 BROAD STREET | INSTALLATION OF DUCT WORK,DIFFUSERS, FANS, A/C UNITS ANDRELATED MECHANICAL PIPING ON PARTIAL 7TH FLOOR FOR TENANT FIT OUT IN THE EXISTING OFFICE BUILDING. PLEASE REFER TO PLANS. | $15,200 |
| M01391620-I1-GC | 2026-06-12 | General construction | 50 BROAD STREET | Remove existing and install new interior partitions and finishes on partial 7th floor in the existing offices as per plans filed herewith only. No change to zoning, egress, use, o | $189,000 |
| M01401004-S1-MS | 2026-06-10 | Mechanical / HVAC | 88 PINE STREET | Modify ductwork on partial 4th floor to accommodate office renovations as per plans filed herewith only. | $15,500 |
| M01400992-I1-GC | 2026-06-10 | General construction | 88 PINE STREET | Install new partitions and finishes on partial 4th floor to accommodate office alterations as per plans filed herewith only. | $76,000 |
| M01387259-I1-GC | 2026-04-29 | General construction | 88 PINE STREET | Install new partitions and finishes on partial 21st floor to accommodate office alterations as per plans filed herewith only. | $582,000 |
| M01362040-S1-MS | 2026-04-03 | Mechanical / HVAC | 88 PINE STREET | TBD | $56,500 |
| M01362040-I1-GC | 2026-04-02 | General construction | 88 PINE STREET | Install walls, doors, floor finishes and ceilings per plans | $135,000 |
| M01361990-S1-MS | 2026-03-11 | Mechanical / HVAC | 88 PINE STREET | Mechanical equipment installation to accommodate office alterations on partial 5th floor as per plans filed herewith only. | $82,700 |
| M01345329-I1-GC | 2026-03-09 | General construction | 88 PINE STREET | Remove existing partitions and install new partitions and finishes on partial 14th floor in the existing office suite as per plans filed herewith. | $163,000 |
| M01345329-S1-MS | 2026-03-06 | Mechanical / HVAC | 88 PINE STREET | Modification of HVAC duct work on 14th floor to accommodate renovations in the existing office building as per plans | $72,003 |
| M01361990-I1-GC | 2026-03-05 | General construction | 88 PINE STREET | Install walls, doors, floor finishes and ceilings per plans provided herewith | $258,000 |
| M01314868-I1-GC | 2026-01-06 | General construction | 88 PINE STREET | Alteration to partial 28th floor in the existing office building including Installation of walls, doors, floor finishes and ceilings per plans filed herewith only. | $226,000 |
| M01314868-S1-MS | 2025-12-03 | Mechanical / HVAC | 88 PINE STREET | HVAC modifications on partial 28th floor as required to acccommodate partitions revisions for new tenant. | $82,000 |
| M01277273-I1-GC | 2025-09-23 | General construction | 88 PINE STREET | Installation of walls, doors, floor finishes and ceilings for Suite 1720 per plans | $347,500 |
| M01277273-S1-MS | 2025-09-23 | Mechanical / HVAC | 88 PINE STREET | Ductwork modifications on partial 17th floor in the existing office building to accommodate tenant fit out; No change to zoning, use, egress, occupancy. | $239,000 |
| M01200255-I1-MS | 2025-04-28 | Mechanical / HVAC | 88 PINE STREET | Ductwork modification to partial 20th floor in the existing office building. No change to egress or occupancy . | $210,000 |
| M01200237-I1-GC | 2025-04-23 | General construction | 88 PINE STREET | Remove and install new walls, doors, floor, finishes, and ceilings on the partial 20th floor. No change to use in egress or occupancy. | $480,000 |
| M01178194-I1-GC | 2025-03-27 | General construction | 88 PINE STREET | Remove and install new partitions and finishes on the partial 16th floor. as per plans flied herewith No change to use in egress or occupancy | $102,000 |
| M01178194-S1-MS | 2025-03-27 | Mechanical / HVAC | 88 PINE STREET | Ductwork modification to partial 16th floor in the existing office building No change to to use in egress or occupancy. | $319,000 |
| M01107195-I1-GC | 2024-10-02 | General construction | 88 PINE STREET | Install new partitions and finishes on partial 28th floor in the existing offices as per plans filed herewith only. No change to zoning, use, egress, occupancy. | $98,000 |
| M01107195-S1-MS | 2024-10-02 | Mechanical / HVAC | 88 PINE STREET | Ductwork modifications on partial 28th floor in the existing office building to accommodate tenant fit out; No change to zoning, use, egress, occupancy. | $3,200 |
| M01036408-S2-MS | 2024-06-25 | Mechanical / HVAC | 88 PINE STREET | Install new Mechanical equipment and ductwork on the 29th floor in the existing office building to accommodate tenant fit out; No change to zoning, use, egress, occupancy. | $310,000 |
| M01036408-I1-GC | 2024-06-17 | General construction | 88 PINE STREET | Install new partitions and finishes on the 29th floor to accommodate office alterations in the existing building as per plans filed herewith only. No change to zoning, use, egre | $709,000 |
| M01025118-S3-GC | 2024-06-12 | General construction | 88 PINE STREET | Adjustment of existing ductwork and controls to accommodate new architectural layout. | $18,000 |
| M01025118-I1-GC | 2024-06-10 | General construction | 88 PINE STREET | remove and install new partitions and finishes on partial 16th floor to accommodate minor offfice alterations as per plans filed herewith only. No change to zoining, use, egress, | $15,500 |
| M00861688-I1-MS | 2024-01-30 | Mechanical / HVAC | 125 EAST 23 STREET | Replacement of existing rooftop cooling tower and associated piping. No change to egress use or occupancy. | $25,000 |
| M00907472-I1-MS | 2023-09-12 | Mechanical / HVAC | 88 PINE STREET | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, A/C UNITS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANCE TO USE, EGRESS OR OCCUPANCY. | $22,000 |
| M00907464-I1-GC | 2023-09-12 | General construction | 88 PINE STREET | INTERIOR RENOVATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $920,000 |
| M00857862-I1-GC | 2023-06-05 | General construction | 88 PINE STREET | INTERIOR RENOVATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $425,000 |
| M00857953-I1-MS | 2023-06-05 | Mechanical / HVAC | 88 PINE STREET | INSTALLATION OF A/C UNITS, DUCTWORK, DIFFUSERS AND MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $20,000 |
| M00795201-I1-MS | 2022-10-03 | Mechanical / HVAC | 88 PINE STREET | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $10,000 |
| M00795188-I1-GC | 2022-10-03 | General construction | 88 PINE STREET | INTERIOR RENOVATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $275,000 |
| M00795168-I1-GC | 2022-09-20 | General construction | 88 PINE STREET | INTERIOR RENOVATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $280,000 |
| M00795208-I1-MS | 2022-09-20 | Mechanical / HVAC | 88 PINE STREET | REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $18,000 |
| M00620183-I1-MS | 2022-08-11 | Mechanical / HVAC | 620 9 AVENUE | Replacement of existing roof mounted air conditioning units on existing steel dunnage. No change to use, egress or occupancy. | $60,000 |
| M00754572-I1-MS | 2022-08-11 | Mechanical / HVAC | 88 PINE STREET | MODIFICATION TO EXISTING DUCT WORK AND DIFFUSERS AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,900 |
| M00754522-I1-MS | 2022-08-01 | Mechanical / HVAC | 88 PINE STREET | REMOVAL AND INSTALLATION OF DUCT WORK AND CEILING DIFFUSERS AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $2,500 |
| M00754561-I1-GC | 2022-07-26 | General construction | 88 PINE STREET | INSTALL WALLS, DOORS, FLOOR FINISHES, AND CEILINGS AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $96,000 |
| M00739120-I1-MS | 2022-07-22 | Mechanical / HVAC | 88 PINE STREET | MODIFICATION TO EXISTING MECHANICAL SYSTEM. NEW SUPPLEMENTAL AC UNIT AND RELATED DUCT WORK AS SHOWN ON DRAWINGS. NO CHANG TO USE, EGRESS OR OCCUPANCY. | $110,000 |
| M00754500-I1-GC | 2022-07-22 | General construction | 88 PINE STREET | REMOVAL AND INSTALLATION OF WALLS, DOORS, AND CEILINGS AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $106,000 |
| M00729995-I1-GC | 2022-07-21 | General construction | 88 PINE STREET | REMOVAL AND INSTALLTION OF INTERIOR PARTITIONS, CEILING AND DOORS AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $230,000 |
| M00691431-I1-MS | 2022-04-12 | Mechanical / HVAC | 88 PINE STREET | REMOVAL AND INSTALLATION OF DUCT WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OCCUPANCY. | $85,000 |
| M00691252-I1-GC | 2022-04-04 | General construction | 88 PINE STREET | REMOVAL AND INSTALLTION OF INTERIOR PARTITIONS, CEILING AND DOORS AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,099,980 |
| M00661202-I1-MS | 2022-03-08 | Mechanical / HVAC | 88 PINE STREET | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED DUCT WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANYC. | $8,500 |
| M00660109-I1-GC | 2022-03-01 | General construction | 88 PINE STREET | INTERIOR RENOVATION OF PARTITIONS, CEILING AND DOORS AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $299,972 |
| M00614811-I1-MS | 2022-01-12 | Mechanical / HVAC | 88 PINE STREET | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED DUCT WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANYC. | $60,000 |
| M00614761-I1-GC | 2022-01-08 | General construction | 88 PINE STREET | INTERIOR RENOVATION OF PARTITIONS, CEILING AND DOORS AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $500,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
