COMPANY RECORD · NEW YORK, NY
Home Evolutions Corp — permit history in New York, NY
Home Evolutions Corp appears on 28 New York permit records from 2021 through 2026, most often general construction (76.7% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 23 | 76.7% |
| Mechanical / HVAC | 7 | 23.3% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 3 |
| 2022 | 9 |
| 2023 | 1 |
| 2024 | 9 |
| 2025 | 5 |
| 2026 | 3 |
Busiest year on record: 2022, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Rite Plumbing & Heating I | 4 | 2025-07-03 |
| Rolando Mechanical Of Ny | 3 | 2024-07-25 |
| Bypass Mechanical Corp | 1 | 2021-07-29 |
| Five Borough Nyc LLC | 1 | 2024-07-10 |
| Stanley Ruth Co LLC | 1 | 2025-08-21 |
5 companies are named alongside Home Evolutions Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 188 OCEAN PARKWAY | 2026-08-18 |
| 650 WEST END AVENUE | 2026-01-28 |
| 11 FILLMORE PLACE | 2026-01-16 |
| 2 SUTTON PLACE SOUTH | 2025-06-20 |
| 264 22 STREET | 2025-02-14 |
| 340 RIVERSIDE DRIVE | 2024-11-12 |
| 168 EAST 71 STREET | 2024-06-07 |
| 325 NORTH END AVENUE | 2024-02-01 |
| 25 WEST 54 STREET | 2022-06-14 |
| 81 WILLOUGHBY STREET | 2022-06-08 |
| 401 EAST 89 STREET | 2022-05-28 |
| 4 LEXINGTON AVENUE | 2022-03-24 |
| 129 DEVOE STREET | 2021-12-09 |
| 1049 FIFTH AVENUE | 2021-07-27 |
15 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $12,725 to $911,040, median $199,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
28 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01436050-I1-GC | 2026-08-18 | General construction | 188 OCEAN PARKWAY | Emergency work to remove fire-damaged debris and associated work to construct a temporary wood-framed roof structure | $75,000 |
| M01187741-S1-MS | 2026-01-28 | Mechanical / HVAC | 650 WEST END AVENUE | Filing subsequent application for installation of mechanical unit and associated equipment, as per plans submitted. | $64,286 |
| B01147941-I1-GC-CX | 2026-01-16 | General construction | 11 FILLMORE PLACE | REMOVAL OF PARAPET WALLS AND CHIMNEYS. REPAIR TO EXISTING BRICK MASONRY WALLS AND FACADE. REBUILD OF MASONRY PARAPETS AND CHIMNEYS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS. | $458,000 |
| M01187741-I1-GC | 2025-11-19 | General construction | 650 WEST END AVENUE | Filing application for interior renovations to apt. 10B. Work includes installation of interior non-load bearing partitions and finishes. No change to use, egress, or occupancy. Me | $77,800 |
| M01217108-I1-GC | 2025-06-20 | General construction | 2 SUTTON PLACE SOUTH | Partial renovation of apartment 2C on 002 Floor. Work includes removal of non structural interior partitions, cabinetry, and finishes. Replacement of two (2) windows. No change o | $198,000 |
| M08011780-S1-MS | 2025-03-12 | Mechanical / HVAC | 2 SUTTON PLACE SOUTH | Install mechanical systems per the plans filed herewith. | $15,000 |
| B00719996-S1-GC | 2025-02-14 | General construction | 264 22 STREET | Structure for partial demolition of partitions, roof and floors in a 3 story with cellar building. | $50,900 |
| M01138950-I1-GC | 2025-02-13 | General construction | 2 SUTTON PLACE SOUTH | Application for the interior renovation of Apt 9F on the 9th Floor. Work to include removal of non-load bearing partitions, toilet, kitchen and upgrades to closets and lighting. Dr | $276,540 |
| M01098540-I1-GC | 2024-11-12 | General construction | 340 RIVERSIDE DRIVE | Partial interior renovation of apartment 2C on 002 floor. Work is limited to kitchen and bathroom renovations, along with the installation of new non-structural partitions. No ch | $140,000 |
| M01031615-I1-GC | 2024-07-15 | General construction | 2 SUTTON PLACE SOUTH | Interior renovation and combination of coop apts. 18F and 18EG. Work to include non-structural demolition, general construction and related finishes. Apartments combined in complia | $462,000 |
| B08028124-I1-GC-CX | 2024-07-10 | General construction | 11 FILLMORE PLACE | Installation of a new air conditioning, VRF system, with new toilet exhaust system. | $50,000 |
| B08028124-I1-GC-CX | 2024-07-10 | Mechanical / HVAC | 11 FILLMORE PLACE | Installation of a new air conditioning, VRF system, with new toilet exhaust system. | $50,000 |
| B00519574-I1-GC | 2024-07-10 | General construction | 11 FILLMORE PLACE | Pointing & Repair of Front, Side, and Rear Facades. Removal and Replacement of Front Cornice. Removal and Replacement of Existing Roof. No change in use, Egress or Occupancy | $240,000 |
| M00995632-S3-MS | 2024-06-07 | Mechanical / HVAC | 168 EAST 71 STREET | SUBSEQUENT FILING FOR MECHANICAL WORK TYPE | $145,400 |
| M00995632-I1-GC | 2024-06-05 | General construction | 168 EAST 71 STREET | PROPOSE TO CONVERT EXISTING TWO FAMILY TO SINGLE FAMILY HOUSE WITH GENERAL CONSTRUCTION WORKS AS SHOWN ON PLANS. OBTAIN A NEW C OF O. | $911,040 |
| M00938898-I1-GC | 2024-02-01 | General construction | 325 NORTH END AVENUE | COMBINATION OF APARTMENTS 12O AND 12P ON 012 FLOOR. SCOPE OF WORK INCLUDES MINOR NON-STRUCTURAL PARTITION WORK AND FINISHES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. | $270,000 |
| M00963228-I1-GC | 2024-01-27 | General construction | 168 EAST 71 STREET | PROPOSE INTERIOR RENOVATION, WORKS INCLUDES MINOR PARTITIONS, INTERIOR NON-STRUCTURAL DEMOLITION, AND FINISH WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY. | $570,000 |
| M08011780-I1-GC | 2023-07-14 | General construction | 2 SUTTON PLACE SOUTH | PARTIAL INTERIOR RENOVATION OF EXISTING APARTMENT 15C | $499,995 |
| B00541011-I1-GC | 2022-07-06 | General construction | 264 22 STREET | Filing for a change of use from a 3 family residence to a 2 family residence with an enlargement. Work includes partitions work, stairs, doors, floors, finish work on floors Cellar | $614,987 |
| B00547604-I1-MS | 2022-07-01 | Mechanical / HVAC | 264 22 STREET | Filing for mechanical work associated with Alt 1 #B00541011. No change to use, egress, or occupancy. | $370,024 |
| M00744871-I1-GC | 2022-06-14 | General construction | 25 WEST 54 STREET | INTERIOR RENOVATION OF EXISTING APARTMENT 10C ON 010 FLOOR. MINOR NON-STRUCTURAL PARTITION WORK AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $200,000 |
| B00646809-S1-MS | 2022-06-08 | Mechanical / HVAC | 81 WILLOUGHBY STREET | Replacement of two existing indoor HVAC units and install of new outdoor roof condensing unit. New ductwork to new offices and existing ductwork to remain must be cleaned and re-in | $157,000 |
| M00493696-I1-GC | 2022-05-28 | General construction | 401 EAST 89 STREET | Relocate existing accessory tenant exercise room & convert orig. into a multipurpose room, provide ADA access to multipurpose equipment room, new package area, cap fix., accessory | $100,000 |
| B00719996-I1-GC | 2022-05-19 | General construction | 264 22 STREET | Partial demolition of partitions, roof and floors in a 3 story with cellar building. | $12,725 |
| M00629846-I1-GC-CX | 2022-03-24 | Mechanical / HVAC | 4 LEXINGTON AVENUE | COMBINATION OF APARTMENTS 4LM AND 4NP. RELOCATION OF INTERIOR NON-STRUCTURAL PARTITIONS. INSTALLATION OF AC SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $525,200 |
| M00629846-I1-GC-CX | 2022-03-24 | General construction | 4 LEXINGTON AVENUE | COMBINATION OF APARTMENTS 4LM AND 4NP. RELOCATION OF INTERIOR NON-STRUCTURAL PARTITIONS. INSTALLATION OF AC SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $525,200 |
| B00646809-I1-GC | 2022-02-16 | General construction | 81 WILLOUGHBY STREET | 8TH FLOOR INTERIOR BUILD-OUT FOR HEALTHCARE FACILITY OF NON-PROFIT MENTAL HEALTHCLINIC INCLUDING OFFICES & TREATMENT ROOMS,A CONFERENCE ROOM. SCOPE OF WORK INCLUDES NEW PARTITIONS, | $748,125 |
| B00634931-I1-GC | 2021-12-09 | General construction | 129 DEVOE STREET | Removal and disposal of interior partitions finished flooring, mill work interior doors and finishes at basement 1st,2nd & third flrs. indicated on drawings filed herewith. No cha | $29,500 |
| M00523176-I1-GC | 2021-07-27 | General construction | 1049 FIFTH AVENUE | INTERIOR RENOVATIONS TO EXISTING APARTMENT#3B. WORK TO INCLUDE NON-STRUCTURAL DEMOLITION, GENERAL CONSTRUCTION, MILLWORK AND RELATED FINISHES, AS PER PLANS FILED HEREWITH. NO CHANG | $206,005 |
| B00451446-I1-GC | 2021-01-28 | General construction | 887 B EAST NEW YORK AVENUE | INTERIOR OFFICE BUILD-OUT FOR A NYC SUMMER YOUTH PROGRAM CENTER & AFTER SCHOOL SPECIALISTS. SCOPE OF WORK INCLUDES NEW PARTITIONS, NEW DROP CEILINGS.NO PLUMBING THIS APPLICATION. S | $181,704 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
