COMPANY RECORD · NEW YORK, NY
Glass Armor Of New York I — permit history in New York, NY
Glass Armor Of New York I appears on 27 New York permit records from 2020 through 2026, most often general construction (88.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 24 | 88.9% |
| Mechanical / HVAC | 3 | 11.1% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 1 |
| 2021 | 2 |
| 2022 | 4 |
| 2023 | 7 |
| 2024 | 6 |
| 2025 | 4 |
| 2026 | 3 |
Busiest year on record: 2023, with 7 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 48-01 58 ROAD | 2026-07-21 |
| 10502 AVENUE D | 2026-05-27 |
| 58-02 48 STREET | 2026-04-03 |
| 669 WEST 158 STREET | 2025-11-03 |
| 301 WEST 215 STREET | 2025-06-13 |
| 5 DUBOIS AVENUE | 2025-05-23 |
| 107-12 LEFFERTS BOULEVARD | 2025-02-11 |
| 347 BOND STREET | 2024-07-05 |
| 299 SOUTH STREET | 2024-06-21 |
| 150 55 STREET | 2024-06-13 |
| 788 UNION STREET | 2024-01-30 |
| 49 BEEKMAN STREET | 2024-01-17 |
| 198-15 GRAND CENTRAL PARKWAY | 2023-12-27 |
| 30 PIKE STREET | 2023-11-09 |
24 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $25,000 to $5,000,000, median $340,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
27 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01054353-I1-GC-CX | 2026-07-21 | General construction | 48-01 58 ROAD | Upgrade (2) 4,000 gal. RD95B5 UST's, (1) 1,000 gal. motor oil UST & (1) 1,000 gal. hoist oil UST with new DW spill containment fill boxes, sumps, overfill prevention & emergency sh | $1,500,000 |
| B01158273-I1-GC-CX | 2026-05-27 | General construction | 10502 AVENUE D | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1) 3,000-GAL MOTOR OIL & (1) 3,000-GAL HYDRAULIC OIL UST'S & ALL ASSOCIATED PIPING. INSTALL (1) 3,000-GAL MOTOR OIL & (1) 3,000-GAL HYDRAU | $1,750,000 |
| Q01054391-I1-GC-CX | 2026-04-03 | General construction | 58-02 48 STREET | Upgrade (2) 4,000 gal, & (1) 2,500 gal. motor vehicle USTs, (1) 1,000 gal. motor oil UST & (2) 1,000 gal. hoist oil USTs w/new DW spill containment fill boxes, sumps, overfill prev | $1,700,000 |
| M00875629-I1-GC | 2025-11-03 | General construction | 669 WEST 158 STREET | EMPLTY, PURGE, CLEAN, AND CLOSE-IN-PLACE (4) 600-GALLON USTS, REMOVE ABOVE-GROUND PIPING, LEAK DETECTION SYSTEM, EQUIPMENT, AND CLEAN AND CLOSE-IN-PLACE BELOW-GROUND PIPING. | $200,000 |
| M00875824-I1-GC | 2025-06-13 | General construction | 301 WEST 215 STREET | REMOVE EXISTING FILL PORT SPILL CONTAINER & TANK TOP SUMP OF (2) 4,000-GALL BIODIESEL,(1) 4,000-GALL GASOLINE USTS. FURNISH & INSTALL DOUBLE WALL FILL PORT SPILL CONTAINERS & DOUBL | $393,500 |
| S01015246-I1-GC | 2025-05-23 | General construction | 5 DUBOIS AVENUE | FILING TO REMOVE EXISTING FILL PORT SPILL CONTAINER OF ONE (1) 4,000-GAL DIESEL & ONE (1) 4,000-GAL GASOLINE USTS. FURNISH & INSTALL DOUBLE WALL FILL PORT SPILL CONTAINERS WITH IEM | $200,000 |
| Q08041154-I1-GC | 2025-02-11 | General construction | 107-12 LEFFERTS BOULEVARD | EMPTY, PURGE, CLEAN, REMOVE AND DISPOSE OF (1) 550-GALLON B5 BIODIESEL DIKED AST, FUEL ISLAND, ASSOCIATED PIPING, AND LEAK DETECTION SYSTEM. INSTALL (1) 550-GALLON B5 BIODIESEL D | $350,000 |
| B00723422-I1-GC-CX | 2024-07-05 | General construction | 347 BOND STREET | EMPTY PURGE, CLEAN REMOVE AND DISPOSE OF ONE(1) 2500-GAL DIESEL UST, ASSOCIATED PIPING & COMPONENTS. INSTALL IN-KIND ONE (1) 2500-GAL DIESEL MOTOR FUEL OIL UST, ONE(1) DIESEL DISPE | $925,000 |
| M00880268-I1-GC-CX | 2024-06-21 | General construction | 299 SOUTH STREET | EMPTY, PURGE & CLEAN (1) 4,000-GALLON & (3) 3,000 -GALLON BIODIESEL USTS. CLOSE IN-PLACE (2) USTS & UPGRADED (2) USTS. INVESTIGATE FIFTH UST. UPGRADE DISPENSING, PIPING, SUMPS & LE | $800,000 |
| B00895878-I1-MS | 2024-06-13 | Mechanical / HVAC | 150 55 STREET | INSTALL (1) NEW, CEILING MOUNTED EXHAUST FAN, DUCTWORK, DIFFUSERS, DAMPERS AND CONTROLS TO SERVE THE EXISTING FUEL OIL PUMP ROOM. (1) ELECTRIC UNIT HEATER SAHLL BE INSTALLED TO SUP | $25,000 |
| B00894996-I1-GC | 2024-06-05 | General construction | 150 55 STREET | 150 55th Street - Fuel Oil Tank Replacement - GENERAL CONSTRUCTION ASSOCIATED WITH FUEL OIL TANK REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $30,000 |
| B00534430-I1-GC | 2024-01-30 | General construction | 788 UNION STREET | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1) 550-GAL BIODIESEL MOTOR FUEL AST, (1) FUEL DISPENSER, VEEDER ROOT. INSTALL IN KIND (1) NEW 550 GAL FIELD FABRICATED SINGLE-WALL STEEL | $328,000 |
| M00499670-I1-GC | 2024-01-17 | General construction | 49 BEEKMAN STREET | Empty,purge,clean, remove & dispose of one (1) 550-Gallon Diesel Motor Fuel AST, (1) fuel dispenser, Conc Is & veeder root. Install 'IN -KIND' one (1) new 550- Gallon field Fabric | $340,000 |
| Q00478413-S1-GC-CX | 2023-12-27 | General construction | 198-15 GRAND CENTRAL PARKWAY | INSTALL NEW FUEL DISPENSING ISLAND CANOPY STRUCTURE AND FOUNDATIONS AS PER PLANS. | $140,000 |
| M00614584-I1-GC-CX | 2023-11-09 | General construction | 30 PIKE STREET | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1)4000-GAL GASOLINE & (1) 4000-GAL DIESEL UST, (2)FUEL DISPENSERS. INSTALL NEW (1)4000-GAL GASOLINE & (1)4,000-GAL BIODIESEL DOUBLE WALL F | $894,786 |
| B00534381-I1-GC | 2023-10-20 | General construction | 2165 GERRITSEN AVENUE | EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1) 550-GAL BIODIESEL MOTOR FUEL AST, (1) FUEL DISPENSER, VEEDER ROOT. INSTALL IN KIND (1) NEW 550 GAL FIELD FABRICATED SINGLE-WALL STEEL B | $337,000 |
| M00499600-I1-GC | 2023-08-18 | General construction | 14 EAST 18 STREET | mpty,purge,clean, remove & dispose of one (1) 550-Gallon Diesel Motor Fuel AST, (1) fuel dispenser, Conc Is & veederroot. Install 'IN -KIND' one (1) new 550- Gallon field Fabricate | $340,000 |
| M00732399-I1-GC | 2023-05-17 | General construction | 4035 9 AVENUE | EMPTY, PURGE, CLEAN, AND CLOSE IN-PLACE (1) 4,000-GALLON ETHANOL(E85) UST. REMOVE ABOVE GROUND PIPING AND EQUIPMENT AND CLEAN AND CLOSE IN-PLACE BELOW GROUND PIPING. | $100,000 |
| Q00478413-I1-GC-CX | 2023-05-12 | General construction | 198-15 GRAND CENTRAL PARKWAY | REMOVE/DISPOSE (3) 4,000-GAL. MOTOR VEHICKLE USTS, FUEL ISLAND, CANOPY, PIPING & LEAK DETECTION SYSTEM. INSTALL (1) 2,500-GAL. & (2) 5,000-GAL. GASOLINE USTS & (1) 4,000-GAL.S BIOD | $2,100,000 |
| B00467476-I1-GC | 2023-01-24 | General construction | 1336 60 STREET | EMPTY, PURGE, CLEAN AND DISPOSE OF ONE (1) 550-GALLON DIESEL MOTOR FUEL AST, FUEL DISPENSER, ALL ASSOCIATED PIPING, EQUIPMENT. INSTALL IN-KIND ONE (1) NEW 550-GALLON SINGLE-WALL ST | $318,006 |
| B00467432-I1-GC | 2022-11-07 | General construction | 9219 5 AVENUE | EMPTY, PURGE, CLEAN AND DISPOSE OF ONE (1) 550-GALLON DIESEL MOTOR FUEL AST, FUEL DISPENSER, ALL ASSOCIATED PIPING, EQUIPMENT. INSTALL IN-KIND ONE (1) NEW 550-GALLON SINGLE-WALL ST | $328,995 |
| Q07998921-I1-GC | 2022-11-03 | General construction | 269-10 GRAND CENTRAL PARKWAY | DIRECT REPLACEMENT OF BURIED WASTE LUBE OIL TANK. | $100,000 |
| Q07998953-I1-GC | 2022-11-03 | General construction | 269-10 GRAND CENTRAL PARKWAY | REMOVE BURIED FUEL OIL TANK AND REPLACE WITH LUBE OIL TANK. ABANDON TWO BURIED TANKS. | $400,000 |
| M00499504-I1-GC | 2022-10-22 | General construction | 340 EAST 14 STREET | Empty,purge,clean, remove & dispose of one (1) 550-Gallon Diesel Motor Fuel AST, (1) fuel dispenser, Conc Is & veeder root. Install 'IN -KIND' one (1) new 550- Gallon field Fabric | $340,000 |
| B00447585-I1-GC | 2021-01-25 | General construction | 231 90 STREET | Herewith filing application for new Greenhouse above an existing porch at rear of building as per plans submitted. No change in Use, Egress or Occupancy. | $53,880 |
| X00441315-I1-MS | 2021-01-20 | Mechanical / HVAC | 850 EDGEWATER ROAD | Install one, above ground, 2000 gallon capacity diesel motor fuel storage tank with one commercial dispenser on a concrete pad. No change in use or egress proposed. | $70,000 |
| M00280656-I1-MS | 2020-08-12 | Mechanical / HVAC | 160 CONVENT AVENUE | INSTALLATION OF TEMPORARY 5,000-GAL. AST OUTSIDE, 250-GAL. AST INSIDE GENERATOR ROOM, ANDFIVE (5) 35,000-GAL. USTs; DEMOLITION OF 275-GAL. DAY TANK IN GENERATOR ROOM, 10,000-GAL. A | $5,000,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →