COMPANY RECORD · NEW YORK, NY
Gilbane Building Company — permit history in New York, NY
Gilbane Building Company appears on 267 New York permit records from 2019 through 2026, most often general construction (52.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 143 | 52.8% |
| Mechanical / HVAC | 128 | 47.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 6 |
| 2020 | 8 |
| 2021 | 47 |
| 2022 | 40 |
| 2023 | 60 |
| 2024 | 46 |
| 2025 | 42 |
| 2026 | 22 |
Busiest year on record: 2023, with 60 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Tristate Plbg Svcs Corp | 10 | 2026-04-24 |
| A & F Fire Protection Co | 7 | 2026-06-12 |
| Rael Automatic Spr.Co Inc | 7 | 2026-06-24 |
| Abco-Peerless Sprklr Corp | 6 | 2025-07-30 |
| Aspro Plumbing Inc | 5 | 2026-05-06 |
| A&M Warshaw Services LLC | 5 | 2025-10-02 |
| Alliance Plumbing Corp | 5 | 2025-09-05 |
| Par Plumbing Co., Inc | 4 | 2023-05-18 |
| Pace Plumbing Corp | 3 | 2024-09-10 |
| Tt Mechanical Corp | 2 | 2026-03-24 |
| Preferred Spklr And Mech | 2 | 2023-05-18 |
| Manengeering Bureau Inc | 2 | 2023-11-14 |
30 companies are named alongside Gilbane Building Company on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3 METROTECH CENTER | 2026-08-17 |
| 1 43 STREET | 2026-08-12 |
| 1450 MADISON AVENUE | 2026-08-12 |
| 111 LONGSHORE | 2026-07-31 |
| 269-11 76 AVENUE | 2026-06-23 |
| 264-25 76 AVENUE | 2026-06-11 |
| 6 METROTECH | 2026-06-04 |
| 1920 TURNBULL AVENUE | 2026-05-21 |
| 1095 SOUTHERN BOULEVARD | 2026-05-20 |
| 506 6 STREET | 2026-05-07 |
| 329 JAY STREET | 2026-03-09 |
| 726 BROADWAY | 2026-02-27 |
| 860 CONCOURSE VILLAGE EAST | 2026-01-12 |
| 6 METROTECH CENTER | 2025-09-24 |
89 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $39,900,000, median $595,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
267 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01405582-I1-GC | 2026-08-17 | General construction | 3 METROTECH CENTER | FILING HEREWITH INTERIOR REMOVALS TO EXISTING SPACES ON FLOORS SUBCELLAR, CELLAR, 1, MEZZANINE, 2, 3, 4, 5, 6, 7, AND 8 AS PER PLANS IN PREPARATION FOR THE FUTURE TENANT FIT OUT. | $3,219,570 |
| B01380136-I1-GC | 2026-08-12 | General construction | 1 43 STREET | Interior removals of partitions, ceilings, light fixtures, interior mechanical equipment and ductwork, plumbing fixtures (LAA). | $1,000,000 |
| M01321165-I1-GC | 2026-08-12 | General construction | 1450 MADISON AVENUE | HEREWITH FILING FOR DEMOLITION OF NON LOAD BEARING WALLS AND CEILINGS INCLUDING THE REMOVAL EXISTING EXTERIOR CLADDING ONLY AS PER PLANS. | $1,820,000 |
| B01200420-S2-MS | 2026-07-31 | Mechanical / HVAC | 111 LONGSHORE | MECHANICAL WORK IN CONJUNCTION WITH PROVISION OF ASSEMBLY OCCUPANCIES ON 1ST FLOOR. | $1,685,000 |
| Q01248672-S2-MS | 2026-06-23 | Mechanical / HVAC | 269-11 76 AVENUE | Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: modify Mechanical systems to conform with new layouts for new hospital program, as per plans filed herewith. | $1,529,983 |
| M01321165-S1-MS | 2026-06-23 | Mechanical / HVAC | 1450 MADISON AVENUE | HEREWITH FILING FOR DEMOLITION OF MECHANICAL DUCTWORK AND RELATED MECHANICAL EQUIPMENT AS PER PLANS. | $586,500 |
| Q01248672-S1-GC | 2026-06-23 | General construction | 269-11 76 AVENUE | Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: install interior, non-bearing partitions, hung ceiling, wall and floor finishes as per plans filed herewith. No | $3,200,000 |
| Q01080296-Z3-MS | 2026-06-11 | Mechanical / HVAC | 264-25 76 AVENUE | Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed here | $0 |
| B01315781-S1-MS | 2026-06-04 | Mechanical / HVAC | 6 METROTECH | partial removal/modifications of Mechanical equipment on 8th floor as shown on plans filed herewith. Filed in conjunction with subsequent GC, PL, and SP/SD applications. No chang | $3,268,073 |
| B01193952-I1-GC | 2026-06-01 | General construction | 111 LONGSHORE | Application to obtain Certificate of Occupancy for existing manufacturing building, previously renovated under job 340703288, to establish new Places of Assembly on ground floor | $9,000,000 |
| X01265022-S5-MS | 2026-05-21 | Mechanical / HVAC | 1920 TURNBULL AVENUE | Mechanical work as per plans filed. | $0 |
| X01265022-I1-GC | 2026-05-21 | General construction | 1920 TURNBULL AVENUE | PROPOSED 21 STORY MIXED USE RESIDENTIAL AND COMMUNITY FACILITY NEW BUILDING | $0 |
| X00585279-I1-EA | 2026-05-20 | General construction | 1095 SOUTHERN BOULEVARD | Structural work for New Building | $5,150,000 |
| X00585279-I1-ST | 2026-05-20 | General construction | 1095 SOUTHERN BOULEVARD | Structural work for New Building | $5,150,000 |
| B01296351-S2-GC | 2026-05-07 | General construction | 506 6 STREET | BMH SP Carrington Pav.: Modification of partitions, ceiling and finishes as per plans. | $1,500,000 |
| B01296351-S1-MS | 2026-05-07 | Mechanical / HVAC | 506 6 STREET | BMH SP Carrington Pav.: Modification of HVAC equipment and ductwork as per plans. | $55,000 |
| Q01248672-I1-GC | 2026-04-27 | General construction | 269-11 76 AVENUE | Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: Make Ready interior demolition of non-bearing partitions & interior environment of out-patient medical offices | $118,995 |
| B01291740-I1-GC | 2026-03-09 | General construction | 329 JAY STREET | EXISTING STEEL REINFORCEMENT FOR EXTERIOR PANEL INSTALLATION FROM THE 3 RD FLOOR LEVEL TO THE ROOF AS INDICATED ON PLANS SUBMITTED HEREWITH. | $1,000,000 |
| M01271148-I1-GC | 2026-02-27 | General construction | 726 BROADWAY | Filing herewith general construction to include windows replacement on the 5th floor as per plans | $1,000,000 |
| B01315781-I1-GC | 2026-01-30 | General construction | 6 METROTECH | Partial Demolition/ Renovation of 8th floor and additional enabling work on Cellar, 1st, 3rd, 4th, 5th, 7th and roof as shown on plans filed herewith. Filed in conjunction with su | $11,017,266 |
| X00851840-I1-GC | 2026-01-12 | General construction | 860 CONCOURSE VILLAGE EAST | This NB application filed for 19 story R2, Supportive Housing. Project name - West Tower. Fee deferral letter is under Supporting Documents. | $0 |
| B01291740-I1-ST | 2026-01-09 | General construction | 329 JAY STREET | EXISTING STEEL REINFORCEMENT FOR EXTERIOR PANEL INSTALLATION FROM THE 3 RD FLOOR LEVEL TO THE ROOF AS INDICATED ON PLANS SUBMITTED HEREWITH. | $1,000,000 |
| X00851840-S6-MS | 2025-12-10 | Mechanical / HVAC | 860 CONCOURSE VILLAGE EAST | MS WORK IN CONJUNCTION WITH THE NB APPLICATION FILED FOR 19 STORY R2 SUPPORTIVE HOUSING. PROJECT NAME - WEST TOWER. FEE DEFERRAL LETTER IS UNDER SUPPORTING DOCUMENTS. | $0 |
| B01261648-S1-MS | 2025-10-14 | Mechanical / HVAC | 6 METROTECH | Removal of ducts and CHWS&R/HWS&R piping on the 5th floor, removal of AHU and associated ducts and piping on the Roof to accommodate new mechanical equipment on Roof and related du | $7,300,000 |
| B01261648-I1-GC | 2025-10-10 | General construction | 6 METROTECH | Removal of partitions, ceiling and finishes to accommodate the reconstruction of the 5th floor, including roof dunnage and access platform for mechanical equipment and window glazi | $10,400,000 |
| B01063146-I1-GC | 2025-09-24 | General construction | 6 METROTECH CENTER | CONSTRUCTION OF AREA OF NEW EXTERIOR CLADDING AT THE BLDG NORTH FACADE WHERE NOW EXPOSED BY DEMO OF ADJACENT BUILDING AND CONSTRUCTION OF A NEW ROOF OVER EXISTING LOADING DOCK, INC | $2,497,253 |
| Q01215133-S1-MS | 2025-09-17 | Mechanical / HVAC | 1720 VILLAGE LANE | MODIFICATIONS OF HVAC EQUIPMENT AND DUCTWORKTO ACCOMMODATE ALTERATIONS FOR NEW MEDICAL OFFICES AT THE 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $4,199,360 |
| M01251596-I1-GC | 2025-08-22 | General construction | 510 WEST 46 STREET | Remove and replace interior non-bearing partitions and finishes to the medical offices and pharmacy on partial 1st floor at the existing premises. No change to zoning, use, egres | $207,000 |
| Q01215133-I1-GC | 2025-08-14 | General construction | 1720 VILLAGE LANE | MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS FOR NEW MEDICAL OFFICES AT THE 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $5,399,995 |
| M01251659-S1-MS | 2025-08-14 | Mechanical / HVAC | 110 WEST 97 STREET | MECHANICAL MODIFICATIONS TO INCLUDE REPLACEMENT OF DUCTWORK AND AIR OUTLETS. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $61,000 |
| M01251596-S1-MS | 2025-08-07 | Mechanical / HVAC | 510 WEST 46 STREET | MECHANICAL MODIFICATIONS TO INCLUDE REPLACEMENT OF DUCTWORK AND AIR OUTLETS. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $64,000 |
| M01251659-I1-GC | 2025-08-07 | General construction | 110 WEST 97 STREET | Remove and replace interior non-bearing partitions and finishes to accommodate pharmacy alteration in the existing medical facility on partial basement as per plans filed herewith. | $145,100 |
| M01251585-S1-MS | 2025-07-30 | Mechanical / HVAC | 279 EAST 3 STREET | Mechanical modifications to the existing medical offices on partial 1st floor including relocation of air outlets and associated ductwork. No change to zoning, use, egress, occupan | $48,000 |
| M01251585-I1-GC | 2025-07-30 | General construction | 279 EAST 3 STREET | Remove and replace interior non-bearing partitions and finishes to the medical offices and pharmacy on partial 1st floor at the existing premises. No change to zoning, use, egres | $138,400 |
| B01007946-I1-GC | 2025-07-30 | General construction | 366 ROCKAWAY AVENUE | Construction of a new, nine (9) story mixed-use building. | $0 |
| M01230815-I1-MS | 2025-07-08 | Mechanical / HVAC | 485 LEXINGTON AVENUE | Modifications to the existing HVAC system on the 7th and 8th floors as per plans. No change to use, egress or occupancy. | $1,489,576 |
| M01230806-I1-GC | 2025-07-08 | General construction | 485 LEXINGTON AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 7th and 8th floors as per plans. No change to use, egress or occupancy. | $820,437 |
| M01227356-I1-GC | 2025-07-07 | General construction | 485 LEXINGTON AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 9th floor as per plans. No change to use, egress or occupancy. | $1,495,696 |
| M01227374-I1-MS | 2025-07-07 | Mechanical / HVAC | 485 LEXINGTON AVENUE | Modifications to the existing HVAC system on the 9th floor as per plans. No change to use, egress or occupancy. | $1,436,416 |
| B01007946-S4-MS | 2025-06-26 | Mechanical / HVAC | 366 ROCKAWAY AVENUE | Install new mechanical equipment and associated piping in conjunction with NB #B01007946-I1. | $0 |
| M01223718-I1-GC | 2025-06-23 | General construction | 40 WEST 4 STREET | GENERAL CONSTRUCTION ASSOCIATED WITH INTERIOR MODIFICATIONS AS INDICATED ON PLANS SUBMITTED HEREWITH. | $125,000 |
| M01223718-S1-MS | 2025-06-23 | Mechanical / HVAC | 40 WEST 4 STREET | HVAC SYSTEM DUCTWORK MODIFICATIONS TO ACCOMMODATE INTERIOR ALTERATIONS AS INDICATED ON PLANS SUBMITTED HEREWITH. | $90,000 |
| M01225178-I1-GC | 2025-06-23 | General construction | 40 WEST 4 STREET | GENERAL CONSTRUCTION TO ACCOMMODATE PLAZA RECONSTRUCTION WORK INCLUDING REMOVAL/INSTALLATION OF FINISH PAVERS/SUPPORTS, INSTALL GUARD BOOTH, INSTALLATION OF LANDSCAPED/SEATING AREA | $3,000,000 |
| M01123542-S1-MS | 2025-06-18 | Mechanical / HVAC | 726 BROADWAY | Mechanical modifications as per plans | $9,100,000 |
| M01225178-S2-MS | 2025-06-13 | Mechanical / HVAC | 40 WEST 4 STREET | SPLIT HVAC UNIT FOR GUARD BOOTH. | $40,000 |
| B01086494-I1-GC | 2025-06-06 | General construction | 2 EASTERN PARKWAY | proposed general construction on 1st, 2nd, 3rd floors, as per plan. no changes to egress, occupancy or use. | $35,742,135 |
| B01086494-S3-MS | 2025-06-06 | Mechanical / HVAC | 2 EASTERN PARKWAY | Removal and installation of HVAC units with associated piping and ducts. No change of use or occupancy or egress. | $9,460,000 |
| B01194812-I1-GC | 2025-06-06 | General construction | 2 EASTERN PARKWAY | proposed exterior restoration as per plan. No change to use, occupancy or egress. | $4,737,850 |
| Q01208405-I1-GC | 2025-06-03 | General construction | 102-01 66 ROAD | Northwell Health Forest Hill Hospital: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indicated, as per plans filed herewith. No cha | $65,000 |
| Q01202391-I1-GC | 2025-06-03 | General construction | 102-01 66 ROAD | Northwell Health Forest Hill Hospital: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indicated, as per plans filed herewith. No cha | $100,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
