COMPANY RECORD · NEW YORK, NY
Concept Construction Serv — permit history in New York, NY
Concept Construction Serv appears on 176 New York permit records from 2019 through 2026, most often general construction (54% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 95 | 54% |
| Mechanical / HVAC | 81 | 46% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 16 |
| 2022 | 41 |
| 2023 | 34 |
| 2024 | 27 |
| 2025 | 32 |
| 2026 | 23 |
Busiest year on record: 2022, with 41 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Bedrock Mechanical Inc | 6 | 2026-06-25 |
| Bedrock Plbg. & Htg., Inc | 5 | 2025-09-29 |
| Bedrock Plumbing & Heating Inc | 2 | 2026-06-30 |
| Full Capacity Fire Corp | 2 | 2026-06-08 |
| A&A Plumbing Corp | 1 | 2026-06-04 |
| Aqua Plumbing & Htng Corp | 1 | 2025-08-06 |
| Denko Mechanical Inc | 1 | 2026-06-23 |
| Dependable Mechanical Cor | 1 | 2025-01-03 |
| Sean Coakley P & H Inc | 1 | 2025-11-13 |
9 companies are named alongside Concept Construction Serv on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1133 6 AVENUE | 2026-08-03 |
| 110 GREENE STREET | 2026-07-08 |
| 810 7 AVENUE | 2026-06-29 |
| 360 PARK AVENUE SOUTH | 2026-06-24 |
| 48 WEST 25 STREET | 2026-05-28 |
| 100 PARK AVENUE | 2026-05-20 |
| 461 5 AVENUE | 2026-04-24 |
| 800 THIRD AVENUE | 2026-04-20 |
| 28 LIBERTY STREET | 2026-03-26 |
| 1185 AVENUE OF THE AMERICAS | 2026-03-13 |
| 200 FIFTH AVENUE | 2026-03-12 |
| 711 THIRD AVENUE | 2026-02-13 |
| 510 MADISON AVENUE | 2025-11-13 |
| 500 PARK AVENUE | 2025-11-13 |
48 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $3,500 to $3,413,845, median $139,986. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
176 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01425700-I1-GC | 2026-08-03 | General construction | 1133 6 AVENUE | HEREWITH FILING FOR INTERIOR RENOVATIONS ON THE 29TH FLOOR AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $150,750 |
| M01425711-I1-MS | 2026-08-03 | Mechanical / HVAC | 1133 6 AVENUE | HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON THE 29TH FLOOR AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS. | $15,000 |
| M01413711-I1-MS | 2026-07-08 | Mechanical / HVAC | 110 GREENE STREET | Modifications to the existing HVAC system on the 8th Floor (Avoro Capital) as per plans. No change to use, egress or occupancy. | $139,978 |
| M01413066-I1-GC | 2026-07-07 | General construction | 110 GREENE STREET | Interior renovation with installation of new partitions, doors, ceilings and finishes on the 8th floor (Avoro Capital) as per plans. No change to use, egress or occupancy. | $499,970 |
| M01403481-I1-GC | 2026-06-29 | General construction | 810 7 AVENUE | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 2nd floor (Paradigm) as per plans. No change to use, egress or occupancy. | $74,910 |
| M01403490-I1-MS | 2026-06-26 | Mechanical / HVAC | 810 7 AVENUE | Modifications to the existing HVAC system on the 2nd floor (Paradigm) as per plans. No change to use, egress or occupancy. | $39,930 |
| M01404632-S1-MS | 2026-06-24 | Mechanical / HVAC | 360 PARK AVENUE SOUTH | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. | $375,000 |
| M01404632-I1-GC | 2026-06-05 | General construction | 360 PARK AVENUE SOUTH | Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. | $800,000 |
| M01387830-S1-MS | 2026-06-02 | Mechanical / HVAC | 360 PARK AVENUE SOUTH | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. | $400,000 |
| M01377442-S1-MS | 2026-05-28 | Mechanical / HVAC | 48 WEST 25 STREET | Herewith filing for modifications (removals/new installations) to existing mechanical systems on the 1st floor and roof as indicated on plans. No change in use, occupancy, or egres | $560,000 |
| M01377442-I1-GC | 2026-05-27 | General construction | 48 WEST 25 STREET | Herewith filing for interior renovations on the 1st floor as indicated on plans. No change in use, occupancy, or egress. | $1,750,000 |
| M01393165-I1-MS | 2026-05-20 | Mechanical / HVAC | 100 PARK AVENUE | Mechanical changes as indicated on plans. | $150,000 |
| M01393781-I1-GC | 2026-05-20 | General construction | 100 PARK AVENUE | Interior demo & reno of non load bearing partitions, walls, doors, ceiling and finishes as indicated on plans. | $225,000 |
| M01387830-I1-GC | 2026-05-11 | General construction | 360 PARK AVENUE SOUTH | Construction of interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy. | $1,000,000 |
| M01381525-I1-MS | 2026-04-24 | Mechanical / HVAC | 461 5 AVENUE | Mechanical changes as indicated on plans. | $270,000 |
| M01384400-I1-MS | 2026-04-20 | Mechanical / HVAC | 800 THIRD AVENUE | Mechanical changes as indicated on plans. | $80,000 |
| M01384397-I1-GC | 2026-04-10 | General construction | 800 THIRD AVENUE | Corridor and bathroom modifications | $120,000 |
| M01361108-I1-GC | 2026-03-26 | General construction | 28 LIBERTY STREET | OPTIONS IT RECEPTION-- REMOVING GLASS WALL AND DOOR FOR RECEPTION AREA REMODEL; PATCH/REPAIR, PAINT, AND CARPET TILE REPLACEMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $29,756 |
| M01354450-I1-GC | 2026-03-13 | General construction | 1185 AVENUE OF THE AMERICAS | Minor interior demolition of existing office space including interior partitions, doors, suspended ceilings on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or occu | $799,896 |
| M01354480-I1-MS | 2026-03-13 | Mechanical / HVAC | 1185 AVENUE OF THE AMERICAS | Modifications and minor interior demolition of the existing HVAC system, including removals of ducts and piping on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or | $99,748 |
| M01183721-I1-GC | 2026-03-12 | General construction | 200 FIFTH AVENUE | GENERAL CONSTRUCTION ON THE 15TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $219,993 |
| M01350566-I1-GC | 2026-02-13 | General construction | 711 THIRD AVENUE | INSTALLATION OF NON-LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $4,000 |
| M01327267-I1-GC | 2026-01-29 | General construction | 461 5 AVENUE | Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans, | $540,000 |
| M01320778-I1-MS | 2025-12-29 | Mechanical / HVAC | 461 5 AVENUE | Mechanical changes as indicated on plans. | $165,000 |
| M01320698-I1-GC | 2025-12-22 | General construction | 461 5 AVENUE | Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans. | $330,000 |
| M01314913-I1-GC | 2025-11-13 | General construction | 510 MADISON AVENUE | Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. | $765,934 |
| M01293986-I1-MS | 2025-11-13 | Mechanical / HVAC | 500 PARK AVENUE | Modifications to the existing HVAC system on the 9th Floor, as per plans. No change to use, egress, or occupancy. | $250,000 |
| M01293967-I1-GC | 2025-11-13 | General construction | 500 PARK AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings, and finishes on the 9th Floor as per plans. No change to use, egress or occupancy. | $1,250,000 |
| M01314913-S1-MS | 2025-11-13 | Mechanical / HVAC | 510 MADISON AVENUE | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. | $54,000 |
| M01282982-I1-MS | 2025-10-02 | Mechanical / HVAC | 810 SEVENTH AVENUE | Modifications to the existing HVAC system on the 29th floor (Suite 2910) as per plans. No change to use, egress or occupancy. | $149,940 |
| M01278311-S1-MS | 2025-09-25 | Mechanical / HVAC | 7 TIMES SQUARE | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. | $35,000 |
| M01282967-I1-GC | 2025-09-23 | General construction | 810 SEVENTH AVENUE | Installation of new partitions, doors, ceilings and finishes on the 29th floor (Suite 2910) as per plans. No change to use, egress or occupancy. | $199,920 |
| M01278311-I1-GC | 2025-09-09 | General construction | 7 TIMES SQUARE | Remove and construct interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. | $200,000 |
| M01252480-S1-MS | 2025-08-01 | Mechanical / HVAC | 7 TIMES SQUARE | Modification to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy. | $35,000 |
| M01252480-I1-GC | 2025-08-01 | General construction | 7 TIMES SQUARE | Removal of existing interior build out as shown on drawings. No change in use, egress or occupancy. | $230,000 |
| B01156932-S1-MS | 2025-07-29 | Mechanical / HVAC | 502 86 STREET | Herewith filing mechanical modifications for New York Presbyterian - BAY RIDGE PHYSICIANS PRACTICE interior buildout. No change in use, egress, or occupancy | $683,000 |
| M01237193-I1-GC | 2025-06-25 | General construction | 810 SEVENTH AVENUE | Installation of new partitions, doors, ceilings and finishes on the 18th floor (Phillips Lytle) as per plans. No change to use, egress or occupancy | $200,000 |
| M01237335-I1-MS | 2025-06-23 | Mechanical / HVAC | 810 SEVENTH AVENUE | Modifications to the existing HVAC system on the 18th floor (Phillips Lytle) as per plans. No change to use, egress or occupancy. | $150,000 |
| B01156932-I1-GC | 2025-06-20 | General construction | 502 86 STREET | Herewith filing general construction modifications for New York Presbyterian - BAY RIDGE PHYSICIANS PRACTICE interior buildout. No change in use, egress, or occupancy | $3,413,845 |
| M01214316-I1-MS | 2025-06-20 | Mechanical / HVAC | 810 SEVENTH AVENUE | Modifications to the existing HVAC system on the 17th floor (Suite 1701) as per plans. No change to use, egress or occupancy. | $69,940 |
| M01214270-I1-GC | 2025-05-29 | General construction | 810 SEVENTH AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor (Suite 1701) as per plans. No change to use, egress or occupancy. | $179,985 |
| M01156630-I1-MS | 2025-05-05 | Mechanical / HVAC | 711 THIRD AVENUE | Mechanical demolition and renovations / modifications to existing ductwork as per plans filed herewith. No change to use, egress, or occupancy. | $150,000 |
| M01201677-I1-GC | 2025-04-30 | General construction | 485 LEXINGTON AVENUE | Minor demolition with installation of new partitions, doors, ceilings, and finishes on the 8th (Restrooms) and 9th (Whitebox) as per plans. No change to use, egress, or occupancy. | $250,000 |
| M01201716-I1-MS | 2025-04-29 | Mechanical / HVAC | 485 LEXINGTON AVENUE | Modifications to the existing HVAC system on the 8th (Restrooms) and 9th Floors (Whitebox) as per plans. No change to use, egress, or occupancy. | $70,000 |
| M01184376-I1-MS | 2025-03-14 | Mechanical / HVAC | 485 LEXINGTON AVENUE | Modifications to the existing HVAC system on the 7th and 30th floors (Restrooms) as per plans. No change to use, egress or occupancy. | $30,000 |
| M01184364-I1-GC | 2025-03-13 | General construction | 485 LEXINGTON AVENUE | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 7th and 30th floors (Restrooms) as per plans. No change to use, egress or occupancy. | $120,000 |
| Q01127316-I1-GC | 2025-03-07 | General construction | 66-60 FRESH POND ROAD | GENERAL CONSTRUCTION WORK ASSOCIATED WITH NEW ROOF INSTALLATION OVER EX DECK AT THE MAIN BUILDING ROOF & STAIR BULKHEAD. ADDITIONALLY, WORK INCLUDES PARAPET REPLACEMENT & NEW PARAP | $196,000 |
| M01160103-I1-MS | 2025-03-03 | Mechanical / HVAC | 810 SEVENTH AVENUE | Modifications to the existing HVAC system on the 33rd floor (Suite 3300) as per plans. No change to use, egress or occupancy. | $139,995 |
| M01160101-I1-GC | 2025-02-19 | General construction | 810 SEVENTH AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 33rd floor (Suite 3300) as per plans. No change to use, egress or occupancy. | $684,900 |
| M01151033-I1-GC | 2025-02-06 | General construction | 711 THIRD AVENUE | Demolition and interior renovations / modifications as per plans filed herewith. No change to use, egress or occupancy. | $950,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
