COMPANY RECORD · NEW YORK, NY
C.A.C. Industries, Inc — permit history in New York, NY
C.A.C. Industries, Inc appears on 31 New York permit records from 2025 through 2026, most often general construction (96.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 30 | 96.8% |
| Mechanical / HVAC | 1 | 3.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2025 | 4 |
| 2026 | 27 |
Busiest year on record: 2026, with 27 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| I.M.P. Plbg. & Htg. Corp | 2 | 2026-02-24 |
1 companies are named alongside C.A.C. Industries, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 2141 SECOND AVENUE | 2026-08-27 |
| 828 FIFTH AVENUE | 2026-08-25 |
| 2121 SECOND AVENUE | 2026-08-19 |
| 2154 SECOND AVENUE | 2026-08-14 |
| 2130 SECOND AVENUE | 2026-08-12 |
| 2151 SECOND AVENUE | 2026-08-05 |
| 2148 2 AVENUE | 2026-08-04 |
| 2146 SECOND AVENUE | 2026-07-29 |
| 2037 SECOND AVENUE | 2026-07-21 |
| 2112 SECOND AVENUE | 2026-07-10 |
| 2108 2 AVENUE | 2026-07-07 |
| 2035 SECOND AVENUE | 2026-07-01 |
| 2127 SECOND AVENUE | 2026-06-29 |
| 2118 SECOND AVENUE | 2026-06-23 |
26 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $2,000,000, median $38,558. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
31 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01301964-I1-GC-CX | 2026-08-27 | General construction | 2141 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/facade repair as per plans herewith. | $6,983 |
| M01245572-I1-GC-CX | 2026-08-25 | General construction | 828 FIFTH AVENUE | Sidewalk Vault Repair | $1,359,465 |
| M01144022-S1-GC-CX | 2026-08-19 | General construction | 2121 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch. | $30,897 |
| M01302231-I1-GC-CX | 2026-08-14 | General construction | 2154 SECOND AVENUE | Second Avenue Subway Program - Building to undergo shoring with posts in basement, rubble wall repair, and repairs of brick facade. | $25,702 |
| M01054819-I1-GC-CX | 2026-08-12 | General construction | 2130 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch | $30,539 |
| M01301982-I1-GC-CX | 2026-08-05 | General construction | 2151 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening by installing new steel post between cellar and first floor. Facade to be repaired as per plans here | $7,908 |
| M01140471-I1-GC-CX | 2026-08-04 | General construction | 2148 2 AVENUE | SECOND ave SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault rem, rep. of existing entrance with new reinforced concrete walls, & slab for new cellar hatch | $43,082 |
| M01302224-I1-GC-CX | 2026-07-29 | General construction | 2146 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening. Brick repair as per plans herewith. | $35,381 |
| M01301918-I1-GC-CX | 2026-07-21 | General construction | 2037 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening. Install new sister wood joist spanning from foundation wall to intermediate beam as shown on plans | $7,707 |
| M01143966-S1-GC-CX | 2026-07-10 | General construction | 2112 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration, vault removal & building strengthening/protection. | $191,592 |
| M01140811-S1-GC-CX | 2026-07-07 | General construction | 2108 2 AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch | $318,861 |
| M01301912-I1-GC-CX | 2026-07-01 | General construction | 2035 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening including new reinforced steel posts between cellar slab and first floor wood joists. Replacement of | $8,035 |
| M01120778-S1-GC-CX | 2026-06-29 | General construction | 2127 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for n | $38,558 |
| M00919687-I1-GC-CX | 2026-06-23 | General construction | 2118 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection work on property. Including but not limited to repair/repointing of facade brick piers. | $28,972 |
| M01120847-S1-GC-CX | 2026-06-18 | General construction | 2100 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration, vault removal & building strengthening/protection. Replacement of existing entrance with new reinfo | $519,858 |
| M00942962-S1-GC-CX | 2026-05-27 | General construction | 2137 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & building strengthening/protection. Replacement of existing entrance with new reinforced concrete w | $176,163 |
| M00908750-S1-GC-CX | 2026-05-13 | General construction | 2133 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & building strengthening/protection. Replacement of existing entrance with new reinforced concrete w | $172,906 |
| M00947932-I1-GC-CX | 2026-05-07 | General construction | 2124 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch | $61,078 |
| M00908759-S1-GC-CX | 2026-05-07 | General construction | 2131 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for n | $42,247 |
| B01204199-S3-MS | 2026-03-06 | Mechanical / HVAC | 38 VARICK STREET | Propose to modify mechanical system as per plans filed herewith. No change in use egress or occupancy is proposed under this application. | $25,000 |
| M00925933-S2-FO | 2026-02-23 | General construction | 2125 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for n | $37,372 |
| M00943882-S1-GC-CX | 2026-02-11 | General construction | 2123 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch | $30,897 |
| M00943321-S1-GC-CX | 2026-02-11 | General construction | 2135 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch | $61,793 |
| M00870296-I1-GC-CX | 2026-02-11 | General construction | 2129 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration, vault removal & building strengthening/protection. Replacement of existing entrance with new reinfo | $136,116 |
| Q01328383-I1-GC | 2026-01-28 | General construction | 24-09 38 AVENUE | Partial modification of the part of the non-bearing partitions and refurbish interior finishes at the 3rd-floor office. No change in use, egress, or occupancy. | $208,000 |
| M00925933-S2-GC | 2026-01-20 | General construction | 2125 SECOND AVENUE | SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for n | $37,372 |
| B01204199-I1-GC | 2026-01-15 | General construction | 38 VARICK STREET | Propose to install new floor for equipment above existing 1st floor, stair and non bearing partitions as per plans filed herewith. No change in use egress or occupancy is proposed | $50,000 |
| B00967968-I1-ST | 2025-10-01 | General construction | 38 VARICK STREET | PROPOSE TO ERECT A NEW TWO STORY METAL FRAME BUILDING CONSTRUCTION CLASS IIB TO HOUSE A WATER TREATMENT FACILITY AND ACCESSORY OFFICE ALL AS PER PLANS FILED HEREWITH. | $0 |
| B00967968-I1-GC | 2025-07-18 | General construction | 38 VARICK STREET | PROPOSE TO ERECT A NEW TWO STORY METAL FRAME BUILDING CONSTRUCTION CLASS IIB TO HOUSE A WATER TREATMENT FACILITY AND ACCESSORY OFFICE ALL AS PER PLANS FILED HEREWITH. | $0 |
| B00996809-I1-GC | 2025-07-14 | General construction | 38 VARICK STREET | Propose to perform site improvement per plans filed herewith and in conjuction with NB B00967968-I1. No change in use egress or occupancy is proposed under this application. | $200,000 |
| Q01229020-I1-GC | 2025-06-16 | General construction | 107-10 180 STREET | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE PROGRAM. NO CHANGE TO USE, EGRESS, OR | $2,000,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
