COMPANY RECORD · NEW YORK, NY
Samuel & Sons P & H Inc — permit history in New York, NY
Samuel & Sons P & H Inc appears on 296 New York permit records from 2019 through 2026, most often plumbing (99.7% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 296 | 99.7% |
| Fire protection | 1 | 0.34% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 9 |
| 2020 | 34 |
| 2021 | 41 |
| 2022 | 58 |
| 2023 | 45 |
| 2024 | 48 |
| 2025 | 40 |
| 2026 | 22 |
Busiest year on record: 2022, with 58 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Suburbana Corp | 6 | 2026-06-15 |
| Dsc Construction Yme LLC | 4 | 2024-11-08 |
| Ragem Construction Corp | 4 | 2022-04-14 |
| Rnh Contracting Group LLC | 4 | 2025-04-24 |
| Underconstruction Aks Inc | 3 | 2025-12-08 |
| Midco Corp | 3 | 2025-02-19 |
| Kba Home Improvement Inc | 3 | 2026-03-16 |
| Mosso Construction Inc | 3 | 2025-12-29 |
| Lewis Construction Nyc In | 3 | 2026-03-27 |
| Tjs Ny Inc | 2 | 2024-05-01 |
| Mg Decorations Ltd | 2 | 2026-02-24 |
| Creative Hands Restorers | 2 | 2023-10-10 |
61 companies are named alongside Samuel & Sons P & H Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 419 WEST 150 STREET | 2026-07-22 |
| 262 15 STREET | 2026-07-07 |
| 28-45 47 STREET | 2026-07-01 |
| 2367 8 AVENUE | 2026-06-30 |
| 1545 DUNBAR STREET | 2026-06-25 |
| 2726B MERMAID AVENUE | 2026-06-18 |
| 2109 BROADWAY | 2026-06-15 |
| 162-20 NORTHERN BOULEVARD | 2026-06-05 |
| 608 MEAD STREET | 2026-04-23 |
| 291 UTICA AVENUE | 2026-04-07 |
| 20 EAST 74 STREET | 2026-03-27 |
| 14-35 161 STREET | 2026-03-16 |
| 188 MONTAGUE STREET | 2026-03-16 |
| 61 VICTORY BOULEVARD | 2026-03-12 |
281 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $277,000, median $15,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
296 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01026520-I1-PL | 2026-07-22 | Plumbing | 419 WEST 150 STREET | INSTALLATION OF GAS RANGE AND FRYER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $5,000 |
| B01359130-I1-PL | 2026-07-07 | Plumbing | 262 15 STREET | PLUMBING WORK IN EXISTING 2 STORY WITH ATTIC & BASEMENT, 1 FAMILY BUILDING, AS PER PLANS IN CONJUNCTION WITH ALT 2 APPLICATION # B01359109-I1, NO CHANGE IN USE, MEANS OF EGRESS OR | $22,500 |
| Q01342446-I1-PL | 2026-07-01 | Plumbing | 28-45 47 STREET | NO CHANGE IN USE EGRESS, OR OCCUPANCY.RELOCATE KITCHEN, AND NEW DISH WASHER @ FIRST FLOOR.INSTALL NEW 3-PIECE BATHROOM, AND WASHING MACHINE @CELLAR. | $6,000 |
| M01414297-S1-PL | 2026-06-30 | Plumbing | 2367 8 AVENUE | Cap+ remove existing plumbing fixtures cellar-001 per demo plan no change to use egress occupancy. GC, MH,PL,SP for design to be filed separately All in conjunction to Alt1 121204 | $20,000 |
| Q01235217-S2-PL | 2026-06-25 | Plumbing | 1545 DUNBAR STREET | INSTALLATION OF NEW FIXTURES AND REPLACEMENT OF EXISTING FIXTURES ON EXISTING ROUGHING ON FLOORS 001 AND 002 AND TO RESOLVE WORK WITHOUT A PERMIT OATH VIOLATION 39144309Y. | $40,000 |
| B01375809-S1-PL | 2026-06-18 | Plumbing | 2726B MERMAID AVENUE | NEW PLUMBING AND GAS FIXTURES | $10,000 |
| M01176507-S1-PL | 2026-06-15 | Plumbing | 2109 BROADWAY | RELOCATION OF PLUMBING FIXTURES IN BATHROOM AND KITCHEN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $17,500 |
| Q08045140-I1-PL | 2026-06-05 | Plumbing | 162-20 NORTHERN BOULEVARD | NEW TOILET AND LAVATORY AT 1st FLOOR, NEW AREA DRAIN AND DRYWELL IN OSP, AND NEW 3 ROOF DRAIN ON THE ROOF | $47,000 |
| X01308081-S1-PL | 2026-04-23 | Plumbing | 608 MEAD STREET | Cap & remove and legalize plumbing at cellar | $0 |
| B01220229-I1-PL | 2026-04-07 | Plumbing | 291 UTICA AVENUE | RENOVATION OF AN EXISTING RESTUARANT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $30,000 |
| M01360964-S1-PL | 2026-03-27 | Plumbing | 20 EAST 74 STREET | Plumbing work related to apartment renovation as per plans filed herewith. | $36,000 |
| Q01367854-S1-PL | 2026-03-16 | Plumbing | 14-35 161 STREET | Replace existing plumbing fixtures with new, same location and roughing. No change in use, egress or occupancy. | $33,000 |
| B01352624-S2-PL | 2026-03-16 | Plumbing | 188 MONTAGUE STREET | Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy. | $8,480 |
| S01345549-I1-PL | 2026-03-12 | Plumbing | 61 VICTORY BOULEVARD | Resolve ECB violation #39128315K: installation of new plumbing fixtures, new cooking equipment and new gas line for existing commercial space on first floor of premises. No change | $18,500 |
| B01267899-S1-PL | 2026-03-02 | Plumbing | 547 CHESTNUT STREET | APPLICATION FILING TO REMOVE & REPLACE 3 LAB, 3 W/C & 3 TUB AT CELL, 1ST AND 2ND FLOOR, REPLACE 1 SINK AT 1ST AND 2ND FLOOR PER PLAN IN CONNECTION WITH GC WORK. NO CHANGE OF USE, E | $11,000 |
| Q01286197-S1-PL | 2026-02-24 | Plumbing | 60-22 68 ROAD | Replacement of plumbing fixtures associated with interior renovation of 2nd floor apartment under main application #Q01286191-I1. | $20,500 |
| Q01293276-S1-PL | 2026-02-18 | Plumbing | 112-11 225 STREET | HEREBY FILING MINOR PLUMBING WORK AT CELLAR LEVEL AS PER PLANS | $17,500 |
| B01260742-I1-PL | 2026-02-03 | Plumbing | 868 CLARKSON AVENUE | PROPOSE TO INSTALL PLUMBING FIXTURES AS PER PLANS IN PROPOSED RESTAURANT SPACE AT FIRST FLOOR INSTALL WATER CLOSET JAVATORY AND SLOP SINK IN CELLAR | $84,000 |
| B01032639-S5-PL | 2026-01-27 | Plumbing | 328 DEGRAW STREET | FILING HEREWITH PLUMBING WORK FOR THE RENOVATION OF THE CELLAR, BASEMENT,1ST THRU 3RD FLOORS, AND ROOF | $99,000 |
| M01329562-S1-PL | 2026-01-22 | Plumbing | 137 EAST 36 STREET | Application being filed under TPPN #3/97 to combine apartments 4B and 4B on the 4th Floor. Work to include removal of kitchen and capped at 4B to have 1 open kitchen. No change in | $25,002 |
| X01281168-S1-PL | 2026-01-21 | Plumbing | 1419 TELLER AVENUE | HEREBY FILING PLUMBING WORK TO EXISTING 2 FAMILY RESIDENCE AT CELLAR, 1ST AND 2ND FLOOR DUE TO FIRE DAMAGE. | $45,000 |
| X01124313-I1-PL | 2026-01-12 | Plumbing | 2278 HAMPDEN PLACE | Plumbing work in conjunction with Alteration1 application #X01117091-I1 | $33,000 |
| B01243085-S3-PL | 2025-12-29 | Plumbing | 41 PUTNAM AVENUE | Proposed plumbing as per plans. Convert existing non compliance commercial space into residential | $38,475 |
| B01289010-S1-PL | 2025-12-24 | Plumbing | 797 EAST 56 STREET | AT THE CELLAR, CAP AND REMOVE ONE (1) KITCHEN SINK, ONE (1) GAS STOVE, AND ONE (1) BATHTUB. LEGALIZE ONE (1) LAVATORY AND ONE (1) WATER CLOSET AT SAME. REPLACE DEFECTIVE GAS PIPIN | $22,000 |
| B01326012-S1-PL | 2025-12-08 | Plumbing | 691 STERLING PLACE | REPLACEMENT, RELOCATION AND NEW INSTALLATION OF PLUMBING FIXTURES @ CELLAR, BASEMENT, 1ST & 2ND FLOORS. | $49,200 |
| X01092338-S1-PL | 2025-11-14 | Plumbing | 853 EAST 221 STREET | install fixtures for two bathrooms and kitchen on 2nd floor | $19,000 |
| Q01307938-I1-PL | 2025-11-14 | Plumbing | 57-47 64 STREET | PLUMBING WORK IN CELLAR ONLY OF EXISTING 2 STORY WITH CELLAR, 2 FAMILY BUILDING IN CONJUNCTION WITH NB APPLICATION # Q01304123-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN | $9,000 |
| Q01286110-I1-PL | 2025-11-10 | Plumbing | 50-69 44 STREET | Propose to provide plumbing plans for Cellar only of 2 family 2 story building | $16,000 |
| M01207962-S1-PL | 2025-10-31 | Plumbing | 305 EAST 40 STREET | Subsequent application for plumbing fixtures related to combination of apts 5D & 5E. Includes removal of 1 kitchen and replacement / relocation of 3-fixture bathroom fixtures per | $23,400 |
| B01238632-S2-PL | 2025-10-30 | Plumbing | 364 CLERMONT AVENUE | Renvation of existing 2-family dwelling. | $103,450 |
| M01068294-S1-PL | 2025-10-23 | Plumbing | 1579 SAINT NICHOLAS AVENUE | UPGRADE EXISTING GAS METER, INSTALL NEW GAS PIPING AND COMMERICAL COOKING APPLIANCES. FILING THIS APPLICATION IN CONJUCTION OF PLUMBING APPLICATION#: M01068294-I1. | $35,000 |
| B01233592-I1-PL | 2025-10-21 | Plumbing | 551 LEXINGTON AVENUE | PL APPLICATION IS TO REMOVE,CAP AND SEAL GAS BOILER IN THE CEL & INSTALL NEW GAS STOVE IN THE 1ST FLR OF EXISTING 1 FAM RES BUILDING IN CONJUNCTION WITH ALT-2 APPLICATION #B0123357 | $1,500 |
| B01250985-S1-PL | 2025-10-15 | Plumbing | 225 NICHOLS AVENUE | HEREWITH FILING FOR PLUMBING WORK, INSTALLATION OF NEW FIXTURES AT CELLAR:. 1- LAV, 1 TOILET , 1 SHOWER, 1- SLOP SINK & ELECTRIC WASHER & ELECTRIC DRYER, FILED IN CONJUNCTION WITH | $5,000 |
| B00831049-S1-PL | 2025-10-09 | Plumbing | 398 METROPOLITAN AVENUE | Install fixtures to accommodate kitchen and bath at lower level and bath at new extension at roof level | $24,000 |
| M01238992-S1-PL | 2025-09-25 | Plumbing | 150 EAST 69 STREET | FILING FOR THE PLUMBING WORK ASSOCIATED WITH THE RENOVATION OF THE APT. 12CD, AND TO LEGALIZE PREVIOUS PLUMBING WORK TO REMOVE KICTHEN IN 12D SIDE OF COMBINED APARTMENTS. NO CHANGE | $53,000 |
| B01237505-I1-PL | 2025-09-11 | Plumbing | 255 SOUTH 3 STREET | FILING APPLICATION TO DOCUMENT EXISTING SPRINKLER SYSTEM IN STAIRWELL FOR EXISTING RESIDENTIAL BUILDING. SYSTEM CONSISTS OF A TOTAL OF 4 SPRINKELR HEADS AND IS THEREFORE FILED UND | $7,200 |
| B01243155-S1-PL | 2025-09-03 | Plumbing | 1363 SUTTER AVENUE | RELOCATE ALL TOILET AND KITCHEN FIXTURES ACCORDING TO PROPOSED PLAN & ALL PLUMBING FIXTURES WILL BE REPLACED WITH NEW FIXTURES. THERE WILL BE NO CHANGE IN USAGE, EGRESS, OR OCCUPA | $35,000 |
| M01222265-S1-PL | 2025-08-29 | Plumbing | 542 LA GUARDIA PLACE | new lavatory sinks | $12,000 |
| M01235610-S1-PL | 2025-07-18 | Plumbing | 152 WEST 44 STREET | Plumbing work associated with commercial kitchen as shown on plans. | $46,000 |
| M01188043-S1-PL | 2025-07-03 | Plumbing | 30 EAST 37 STREET | Plumbing work during renovation of apartments. | $34,982 |
| M00908292-S1-PL | 2025-06-26 | Plumbing | 139 WEST 83 STREET | Plumbing for renovation of Apt 4E | $14,000 |
| X01059714-I1-PL | 2025-06-24 | Plumbing | 3805 DYRE AVENUE | FILING PLUMBING WORKTYPE FOR OIL TO GAS CONVERSION. REPLACEMENT OF OIL FIRED BOILER WITH GAS FIRED BOILER 722,000 BTU/H AT CELLAR FL. GAS PIPING LINE TO BE UPGRADED AND PROPOSE NEW | $37,200 |
| B00882611-S1-PL | 2025-05-06 | Plumbing | 402 CATON AVENUE | PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION RENOVATION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $17,500 |
| B01193246-S1-PL | 2025-04-28 | Plumbing | 173 AVENUE U | SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH APPROVED MS # B01193246-I1 | $10,000 |
| Q01196519-S1-PL | 2025-04-24 | Plumbing | 30-16 89 STREET | Replace existing plumbing fixture with new on existing roughing | $45,500 |
| B01181904-S2-PL | 2025-04-17 | Plumbing | 1878 BERGEN STREET | INSTALL NEW PLUMBING FIXTURES, ASSOCIATED COLD WATER, HOT WATER, SANITARY, AND VENT LINES. DEMOLISH AND REMOVE EXISTING GAS-FIRED BOILER ANS ASSOCIATED GAS PIPING AS PER PLANS. NO | $10,000 |
| B00949048-S1-PL | 2025-04-14 | Plumbing | 1102 SUTTER AVENUE | APPLICATION FILING TO REMOVE AND REPLACE ALL PLUMBING FIXTURES IN CONNECTION WITH B00949048-I1 AS PER PLAN AND EXISTING CO TO REMAIN. NO CHNAGE OF USE EGRESS AND OCCUPANCY UNDER TH | $16,000 |
| M01170513-S1-PL | 2025-04-07 | Plumbing | 413 EAST 79 STREET | Relocation of water and sewer lines for relocation of sinks, installation of a new sink. This application is subsequent of application M01170513-I1. There is no change in use, egre | $20,000 |
| M01174410-S1-PL | 2025-04-07 | Plumbing | 570 WEST 175 STREET | Relocation of existing lavatory and installation of new toilet and lavatory in nurse room. This is a subsequent application for M01174410-I1. There is no change in use, egress or o | $3,000 |
| Q01170687-I1-PL | 2025-03-12 | Plumbing | 28-23 STEINWAY STREET | SCOPE OF WORK TO INCLUDE REMOVAL OF EXISTING PLUMBING FIXTURES, NEW PLUMBING FIXTURE, NEW GAS EQUIPMENT. | $55,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
