COMPANY RECORD · NEW YORK, NY
Bhd Group LLC — permit history in New York, NY
Bhd Group LLC appears on 77 New York permit records from 2020 through 2026, most often general construction (58.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 50 | 58.8% |
| Mechanical / HVAC | 35 | 41.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 2 |
| 2021 | 7 |
| 2022 | 22 |
| 2023 | 17 |
| 2024 | 23 |
| 2025 | 7 |
| 2026 | 7 |
Busiest year on record: 2024, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Smart Plbg & Htg Corp | 6 | 2026-04-23 |
| Rite Plumbing & Heating I | 2 | 2024-07-03 |
| Rite Way Heating Corp | 2 | 2025-01-09 |
| Addison Plbg And Htg Corp | 1 | 2024-06-10 |
| Fernandez Htg & Mech Corp | 1 | 2024-07-08 |
| S & L Plumbing Inc | 1 | 2024-08-27 |
6 companies are named alongside Bhd Group LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 35 EAST 75 STREET | 2026-08-25 |
| 902 BROADWAY | 2026-05-15 |
| 211 CENTRAL PARK WEST | 2026-03-27 |
| 481 EVERGREEN AVENUE | 2025-10-29 |
| 1125 PARK AVENUE | 2025-09-25 |
| 151 WEST 26 STREET | 2025-06-02 |
| 166 EAST 73 STREET | 2025-05-20 |
| 125 EAST 72 STREET | 2025-01-09 |
| 120 EAST 87 STREET | 2024-08-30 |
| 605 PARK AVENUE | 2024-07-10 |
| 69 BANK STREET | 2024-07-03 |
| 733 PARK AVENUE | 2024-06-28 |
| 1915 WESTCHESTER AVENUE | 2024-03-14 |
| 380 EAST FORDHAM ROAD | 2024-01-31 |
41 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $723,820, median $123,600. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
77 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01331813-S1-MS | 2026-08-25 | Mechanical / HVAC | 35 EAST 75 STREET | APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 17TH FL & ROOF (SUITE PHE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $84,000 |
| M01342286-I1-GC | 2026-05-15 | General construction | 902 BROADWAY | Propose to perform interior renovations. No change in use, egress or occupancy. | $195,000 |
| M01238840-S1-MS | 2026-03-27 | Mechanical / HVAC | 211 CENTRAL PARK WEST | MECHANICAL FILING SUBSEQUENT TO GC FILING - DESIGN INCLUDES THE INSTALLATION OF AIR CONDITIONING SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING. | $40,500 |
| M01238840-I1-GC | 2026-03-26 | General construction | 211 CENTRAL PARK WEST | Interior renovation includes merging Apartment 3DA and 3DB. No change in use, egress and occupancy. | $122,960 |
| M01178112-I1-GC | 2026-03-19 | General construction | 902 BROADWAY | APPLICATION IS FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS AND FINISHES FOR NEW BATHROOMS, MECH./STORAGE ROOMS & CORRIDORS ON THE PARTIAL 2ND & 3RD FLOORS AS PER P | $434,600 |
| M01283361-I1-MS | 2026-02-19 | Mechanical / HVAC | 35 EAST 75 STREET | MECHANICAL WORK IN ASSOCIATION WITH APARTMENT RENOVATION ON THE 6TH FLOOR (APARTMENT 6A/B) OF THE BUILDING LOCATED AT 35 EAST 75TH STREET. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $90,000 |
| M01331813-I1-GC | 2026-02-18 | General construction | 35 EAST 75 STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 17TH FL (SUITE PHE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, O | $173,850 |
| M01283359-I1-GC | 2025-12-04 | General construction | 35 EAST 75 STREET | INTERIOR RENOVATION TO EXISTING APARTMENT 6A/B. REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER TH | $600,000 |
| B01204630-S1-MS | 2025-10-29 | Mechanical / HVAC | 481 EVERGREEN AVENUE | PROPOSED MECHANICAL WORK IN CONJUNCTION TO ARCH. DESIGNS, PROVIDED NEW AIR COOLED VRF SPLIT SYSTEM WITH INDOOR DUCTED FAN COIL UNITS, EXHAUST FAN, DUCTWORK, REGISTERS, DIFFUSERS, A | $60,000 |
| M01243294-I1-GC | 2025-09-25 | General construction | 1125 PARK AVENUE | Interior renovation of Apt. 4A, general construction to include minor partition layout changes and new finishes, plumbing to be filed as a subsequent application. No change to us | $74,750 |
| M01064505-S1-MS | 2025-06-02 | Mechanical / HVAC | 151 WEST 26 STREET | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $121,000 |
| M01215565-I1-GC | 2025-05-20 | General construction | 166 EAST 73 STREET | reno exist single family res 1st fl remove & install new partitions & millwork, 3rd fl new millwork & lighting in 2 rooms, 4th fl convert wet bar to bathroom, combine 2 rooms in t | $135,150 |
| M01100988-S1-MS | 2025-01-09 | Mechanical / HVAC | 125 EAST 72 STREET | New air conditioning and ventilation installation for apartment renovation in conjunction with GC #M01100988--I1. No change to use, egress, or occupancy. | $180,000 |
| M01100988-I1-GC | 2025-01-08 | General construction | 125 EAST 72 STREET | General Construction plans filed herewith to show interior renovations of apartment 3D. No change to use ,egress, or occupancy. | $682,000 |
| B01137968-I1-GC | 2024-12-19 | General construction | 481 EVERGREEN AVENUE | PROPOSED INTERIOR NON-BEARING REMOVAL WORKS OF THE EXISTING 2-FAMILY HOUSE. THE SITE MEASUREMENT AFTER THE INTERIOR REMOVAL WILL BE NEEDED FOR THE MAIN PROPOSED RENOVATION, WHICH W | $72,000 |
| M01035830-I1-GC | 2024-08-30 | General construction | 120 EAST 87 STREET | Legalization application being filed under TPPN #3/97 to establish the legal combination of Apt P12 EF. The units were combined years ago but never filed. No change in use, egress. | $0 |
| M01056104-I1-GC-CX | 2024-07-10 | General construction | 605 PARK AVENUE | GC-COMBINE APT 7G & 7F REMOVAL OF NON-BEARING PARTITIONS, DOORS 7 FRAMES, REFURBISH BATHROOM CONVERT 7G KITCHEN TO LAUNDRY/UTILITY ROOM NEW PARTITIONS, DOORS REPLACE WINDOW AT LAUN | $77,000 |
| M01056104-I1-GC-CX | 2024-07-10 | Mechanical / HVAC | 605 PARK AVENUE | GC-COMBINE APT 7G & 7F REMOVAL OF NON-BEARING PARTITIONS, DOORS 7 FRAMES, REFURBISH BATHROOM CONVERT 7G KITCHEN TO LAUNDRY/UTILITY ROOM NEW PARTITIONS, DOORS REPLACE WINDOW AT LAUN | $77,000 |
| M01027814-I1-GC | 2024-07-03 | Mechanical / HVAC | 69 BANK STREET | Replacing with new Heat Pump. Demolition and renovation on 2nd Floor of partitions. No change in use, egress or occupancy. | $190,000 |
| M01027814-I1-MS | 2024-07-03 | General construction | 69 BANK STREET | Replacing with new Heat Pump. Demolition and renovation on 2nd Floor of partitions. No change in use, egress or occupancy. | $190,000 |
| M01027814-I1-GC | 2024-07-03 | General construction | 69 BANK STREET | Replacing with new Heat Pump. Demolition and renovation on 2nd Floor of partitions. No change in use, egress or occupancy. | $190,000 |
| M01027814-I1-MS | 2024-07-03 | Mechanical / HVAC | 69 BANK STREET | Replacing with new Heat Pump. Demolition and renovation on 2nd Floor of partitions. No change in use, egress or occupancy. | $190,000 |
| M00989102-I1-GC | 2024-06-28 | General construction | 733 PARK AVENUE | INTERIOR RENOVATION IN RESIDENTIAL APARTMENT WITH MINOR INTERIOR PARTITION WORK WITH NO STRUCTURAL INTERVENTION. NO CHANGE IN LOCATION OF WET SPACES. THIS BUILDING IS NOT SPRINKLER | $96,000 |
| M00989104-I1-MS | 2024-06-28 | Mechanical / HVAC | 733 PARK AVENUE | REPLACE EXISTING 2 PIPE CHILLED WATER COOLED FAN COIL UNITS WITH NEW. PROVIDE NEW DUCTWORK FOR AIR DISTRIBUTION. REPLACE AIR COOLED EXISTING 2 PIPE (HOT WATER) PTAC UNITS WITH NEW. | $44,500 |
| M01064505-I1-GC | 2024-06-28 | General construction | 151 WEST 26 STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $561,375 |
| M01044798-I1-GC | 2024-06-12 | General construction | 151 WEST 26 STREET | APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 11TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $99,800 |
| M01006857-I1-GC-CX | 2024-04-23 | General construction | 35 EAST 75 STREET | INTERIOR RENOVATION AND REPLACEMENT OF THRU WALL MECHANICAL UNITS FOR APARTMENT 10E ON THE 10TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $199,000 |
| M01006857-I1-GC-CX | 2024-04-23 | Mechanical / HVAC | 35 EAST 75 STREET | INTERIOR RENOVATION AND REPLACEMENT OF THRU WALL MECHANICAL UNITS FOR APARTMENT 10E ON THE 10TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $199,000 |
| X01013555-I1-MS | 2024-03-14 | Mechanical / HVAC | 1915 WESTCHESTER AVENUE | Mechanical work related to commercial space renovation 2 new heat pump split systems with ductwork, new outside air ductwork, new toilet exhaust fans | $38,000 |
| X01001209-I1-GC | 2024-02-16 | General construction | 1915 WESTCHESTER AVENUE | RENO EXISTING 1ST FL COM SPACE TO NEW PROFESSIONAL (MEDICAL) OFFICE - NO AMENDED CO AS PER BUILDINGS BULLETIN 2009-25. NEW NON-LOAD BEARING PARTITIONS, LIGHTING, CEILINGS, INTERIO | $162,000 |
| X00998001-I1-GC | 2024-02-07 | General construction | 1915 WESTCHESTER AVENUE | interior demolition of commercial space - removal of non load bearing walls, dropped ceilings | $10,800 |
| X00990368-I1-MS | 2024-01-31 | Mechanical / HVAC | 380 EAST FORDHAM ROAD | new ductwork @ 1st fl connected to existing AC unit @ 1st fl - 1 new toilet exhaust fan & 1 exiting toilet exhaust fan | $10,000 |
| M00860625-I1-GC | 2024-01-30 | General construction | 930 5 AVENUE | interior renovations on the apartment 9GH/10 H (combination of apartments done under application # M00692225)- all new finishes as per plans shown. Plumbing and Mechanical work fil | $455,000 |
| M00860751-I1-MS | 2024-01-30 | Mechanical / HVAC | 930 5 AVENUE | mechanical work on the apartment 9GH/10 H in conjunction with ot#M00860625-I1. | $83,930 |
| M00975411-I1-MS | 2024-01-23 | Mechanical / HVAC | 215 EAST 72 STREET | INSTALLATION OF NEW HEATING AND COOLING SYSTEM WITHIN APARTMENT 7E ON 7TH FLOOR. NEW THROUGH-WALL CONDENSERS AND AIR HANDLING UNITS WITHIN APARTMENT, WITH ACCOMPANYING NEW DUCTWOR | $130,000 |
| M00973785-I1-GC | 2024-01-19 | General construction | 215 EAST 72 STREET | INTERIOR RENOVATION OF APT 7E ON 7TH FLOOR. REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS, NEW FINISHES AND MILLWORK PER PLANS. NEW PENETRATIONS OF BUILDING ENVELOPE .ALL | $442,000 |
| X00951942-I1-MS | 2024-01-04 | Mechanical / HVAC | 5221 BROADWAY | Modification of existing HVAC system - reuse existing split system HVAC units new ductwork & new fresh air ductwork, new bathroom exhaust fans & ductwork | $22,000 |
| X00970551-I1-GC | 2023-12-29 | General construction | 380 EAST FORDHAM ROAD | RENO EXISTI1ST FL COM SPACE TO NEW PROFESSIONAL (MEDICAL) OFFICE - NO AMENDED CO AS PER BUILDINGS BULLETIN 2009-25. NEW NON-LOAD BEARING PARTITIONS, LIGHTING, CEILINGS, INTERIOR D | $166,000 |
| M00755597-I1-MS | 2023-10-19 | Mechanical / HVAC | 17 WEST 71 STREET | Partial Minor Interior Alteration to Unit 9B with new HVAC, Kitchen Exhaust, and Toilet Exhaust. | $65,000 |
| X00944147-I1-GC | 2023-10-18 | General construction | 5221 BROADWAY | RENO EXIST 1ST FL COMMERCIAL S- PROFESSIONAL (MEDICAL) OFFICE - NO AMENDED CO AS PER BUILDINGS BULLETIN 2009-25. NEW NON-LOAD BEARING PARTITIONS, LIGHTING, CEILINGS, INTERIOR DOOR | $152,875 |
| X00935266-I1-GC | 2023-09-27 | General construction | 5221 BROADWAY | interior demolition of commercial space - removal of non load bearing walls, dropped ceilings | $19,310 |
| M07999327-I1-MS | 2023-08-17 | Mechanical / HVAC | 55 LIBERTY STREET | INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $45,000 |
| X00853617-I1-MS | 2023-07-12 | Mechanical / HVAC | 1590 WESTCHESTER AVENUE | Mechanical Ductwork for existing HVAC units & 2 new bathroom exhausts | $22,000 |
| M00854356-I1-GC | 2023-05-04 | General construction | 35 EAST 75 STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FL (COMBINE APT 3D & 3E) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, | $279,370 |
| M08043376-I1-GC | 2023-04-14 | Mechanical / HVAC | 151 CENTRAL PARK WEST | Interior renovation of apartment 2N icluding mechanical work. | $37,500 |
| M08043376-I1-MS | 2023-04-14 | General construction | 151 CENTRAL PARK WEST | Interior renovation of apartment 2N icluding mechanical work. | $37,500 |
| M08043376-I1-MS | 2023-04-14 | Mechanical / HVAC | 151 CENTRAL PARK WEST | Interior renovation of apartment 2N icluding mechanical work. | $37,500 |
| M08043376-I1-GC | 2023-04-14 | General construction | 151 CENTRAL PARK WEST | Interior renovation of apartment 2N icluding mechanical work. | $37,500 |
| M00818172-I1-GC | 2023-04-08 | General construction | 176 EAST 71 STREET | HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 14F LOCATED ON THE 14TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $723,820 |
| X00832919-I1-GC | 2023-03-29 | General construction | 1590 WESTCHESTER AVENUE | RENO EXISTING 1ST FL COMMERCIAL SPACE (PROFESSIONAL OFFICE) - NO AMENDED CO AS PER BUILDING BULLETIN 2009-25 NEW NON-LOAD BEARING PARTITIONS, NEW LIGHTING, NEW CEILINGS, NEW INTERI | $161,625 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
