COMPANY RECORD · RALEIGH, NC

Metrocon, Inc — permit history in Raleigh, NC

Metrocon, Inc appears on 42 Raleigh permit records from 2015 through 2026, all of them general construction.

Permit categories

CategoryPermitsShare
General construction42100%

Activity by year

YearPermits issued
20156
20169
20172
20183
201912
20202
20214
20231
20252
20261

Busiest year on record: 2019, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
4141 Parklake Ave STE 3502026-02-27
421 Fayetteville St 2032025-08-28
751 Corporate Center Dr STE 1502025-08-26
5808 Triangle Dr2023-04-05
407 W Lenoir St2021-11-29
215 S Wilmington St2021-11-09
4829 North Hills Dr2021-04-28
125 N Harrington St2021-04-06
615 Daniels St2020-09-23
414 1/2 St Marys St2020-01-24
8537 SIX FORKS RD 3002019-07-25
8521 Six Forks Rd UNIT 4102019-07-25
215 S WILMINGTON ST2019-06-26
8537 SIX FORKS RD 3502019-05-07

34 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $2,837,012, median $65,776. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

42 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
BLDNR-002775-20262026-02-27General construction4141 Parklake Ave STE 350BattenMcLambSmith Interior Alteration of existing suite$335,763
BLDNR-034705-20252025-08-28General construction421 Fayetteville St 203Interior alternation to existing suite 203 310 SF B OCC \BUILDING DESCRIPTOIN 17 STORY B OCC 1-A CO$383,564
BLDNR-028784-20252025-08-26General construction751 Corporate Center Dr STE 150Interior Alteration of an existing suite STE 150 B OCC 6708 SF BUILDING IS 2-B CONST B OCC 3 STORY$734,996
BLDNR-046355-20222023-04-05General construction5808 Triangle DrALTERATION - BARTLETT TREE EXPERTS - NEW INTERIOR WALLS LIGHTING, PME, NON-SPRINKLERED BLDG 6000 sf $274,417
BLDNR-021438-20202021-11-29General construction407 W Lenoir StConstruct Modular Block Retaining Wall$0
BLDNR-044246-20212021-11-09General construction215 S Wilmington StCHANGE OF USE RESTAURANT/ BAR TO OFFICE BUS - OCC, 3032sf TBR, III-B CONST, NEW OFFICE PARTITIONS, I$315,085
BLDNR-007238-20212021-04-28General construction4829 North Hills DrINTERIOR RENOVATION OF EXISTING CLUBHOUSE TO INCLUDE STRUCTURAL, PLUMBING, ELEC AND MECH$256,995
BLDNR-044734-20202021-04-06General construction125 N Harrington StREPLACEMENT OF EXISTING ALUMINUM AND FABRIC AWNING WITH NEW STEEL AND CONCETE OUTDOOR TERRACE FOR SE$98,510
BLDNR-028555-20202020-09-23General construction615 Daniels StNew Building 615 Daniels Street 20 unit Condo Building over partial parking level 3-story 31,049 sf $2,781,375
BLDR-002659-20202020-01-24General construction414 1/2 St Marys StCONVERTED: NEW TOWNHOMES..PLEASE REFERENCE TRANSACTION NUMBER 595108 FOR APPROVALS AND FEES. 5-BCON$344,734
1581252019-07-25General construction8537 SIX FORKS RD 300ARA INTERIOR RENOVATION SUITE 300 2-A CONST 7425 SQ FT B OCC SPRINKLERS AND STANDPIPE$574,695
BLDNR-003206-20192019-07-25General construction8521 Six Forks Rd UNIT 410Level 2 Alteration Suite 410 = 5640 sq. ft. CH ROBINSON $453,851
1562852019-06-26General construction215 S WILMINGTON STFORMER RALEIGH SANDWICH SHOP$301,985
1575002019-05-07General construction8537 SIX FORKS RD 350ALTERATION TO SHELL$557,882
1574972019-05-07General construction8537 SIX FORKS RD 300ARA$863,309
1574992019-05-07General construction8537 SIX FORKS RD 400ARA$258,918
1565242019-04-24General construction4211 ATLANTIC AVESUNBELT EXPANSION$924,501
1555542019-03-13General construction4800 SIX FORKS RDSIX FORKS III - LEVEL 2 ALTERATION$30,591
1554432019-02-15General construction3200 BLUE RIDGE RD 218PALMETTO INFUSION$201,697
1539032019-01-15General construction8601 SIX FORKS RD 260NEXT CENTURY SPIRITS - ALTERATION$200,602
1526772019-01-07General construction6647 FALLS OF NEUSE RDSOUTH STATE BANK$15,152
1526792019-01-07General construction6647 FALLS OF NEUSE RDSOUTH STATE BANK$244,081
1490602018-06-04General construction3515 GLENWOOD AVE 120TRIPLE CROWN$33,042
1460512018-03-23General construction7751 BRIER CREEK PKWY 300INFOSYS$2,837,012
1442272018-01-26General construction3516 WADE AVEALTERATION TO SHELL NO C.O.$727,667
1386692017-04-05General construction2304 HILLSBOROUGH STELEVATOR VESTIBULE ROOF FOR R-2$0
1357382017-01-18General construction4242 SIX FORKS RD 820THE NAUTICALGROUP$0
1322962016-09-14General construction1122 OBERLIN RD 300CRISP AGENCY$0
1328002016-08-22General construction6278 GLENWOOD AVEPLESANT VALLEY PROMENADE$0
1303992016-05-20General construction4201 LAKE BOONE TRL 200SOUTHERN DERMATOLOGY$0
1314262016-05-19General construction2304 HILLSBOROUGH STReplace Expired Permit:123447:2304 HILLSBOROUGH R-$0
1278892016-03-23General construction505 W JONES STTOBACCO ROAD LLC.$0
1290612016-03-23General construction505 W JONES STTOBACCO ROAD LLC.$0
1290692016-03-11General construction1730 VARSITY DR 205SPEC SUITE 205 ALTERATION TO SHELL$0
1275752016-02-05General construction4242 SIX FORKS RD 1500JOHNSON LAMBERT$0
1272942016-01-13General construction2304 HILLSBOROUGH STTEMP COVERED WALKWAY$0
1247472015-10-16General construction2304 HILLSBOROUGH ST2304 HILLSBOROUGH STREET 5TH FL NO HC$0
1247462015-10-16General construction2304 HILLSBOROUGH ST2304 HILLSBOROUGH STREET 4TH FL 1 HC$0
1250412015-09-03General construction801 N WEST STPHASE 1 PERMIT$0
1221732015-06-04General construction3200 SPRING FOREST RD 206SPEEDWAY$0
1223762015-06-04General construction3200 SPRING FOREST RD 210SPEEDWAY$0
1203632015-03-31General construction801 N WEST STMOREHEAD CAPITAL HQ CHANGE OF USE$0

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Raleigh permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →