COMPANY RECORD · RALEIGH, NC
Core Building Company, Inc — permit history in Raleigh, NC
Core Building Company, Inc appears on 145 Raleigh permit records from 2015 through 2025, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 145 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2015 | 16 |
| 2016 | 17 |
| 2017 | 22 |
| 2018 | 14 |
| 2019 | 19 |
| 2020 | 15 |
| 2021 | 13 |
| 2022 | 12 |
| 2023 | 10 |
| 2024 | 3 |
| 2025 | 4 |
Busiest year on record: 2017, with 22 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 8045 Arco Corporate Dr STE 230 | 2025-10-31 |
| 4141 Parklake Ave STE 600 | 2025-10-24 |
| 8045 Arco Corporate Dr STE 220 | 2025-09-17 |
| 150 Fayetteville St STE 1120 | 2025-04-03 |
| 8020 Arco Corporate Dr STE 450 | 2024-08-07 |
| 6339 Glenwood Ave | 2024-04-01 |
| 3100 Smoketree Ct STE 1005 | 2024-02-01 |
| 8081 Arco Corporate Dr STE 400 | 2023-12-19 |
| 3401 Atlantic Ave | 2023-11-21 |
| 8010 Arco Corporate Dr STE 190 | 2023-09-26 |
| 10411 Moncreiffe Rd STE 106 | 2023-09-25 |
| 8010 Arco Corporate Dr STE 185 | 2023-09-06 |
| 8010 Arco Corporate Dr STE 230 | 2023-07-18 |
| 421 Fayetteville St STE 1400 | 2023-07-14 |
109 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $4,541,598, median $172,142. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
145 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| BLDNR-044679-2025 | 2025-10-31 | General construction | 8045 Arco Corporate Dr STE 230 | Mussett Nicholas & Associates Interior alteration of an existing 2nd floor suite (Suite 230). Demoli | $706,753 |
| BLDNR-038070-2025 | 2025-10-24 | General construction | 4141 Parklake Ave STE 600 | PBV Alterations 6th Floor Renovation of an existing office suite that involves new interior finishes | $2,746,216 |
| BLDNR-037732-2025 | 2025-09-17 | General construction | 8045 Arco Corporate Dr STE 220 | ATCS - Rework of existing tenant suite for new tenant ATCS. Expansion of 2 existing offices, additio | $288,353 |
| BLDNR-000242-2025 | 2025-04-03 | General construction | 150 Fayetteville St STE 1120 | EXP - ALT - GRSM - Expansion of Suite 1120 into former suites 1150 and 1110 | $214,582 |
| BLDNR-035376-2024 | 2024-08-07 | General construction | 8020 Arco Corporate Dr STE 450 | BUILDING DEMISING WALL TO SEPARATED EXISTING SUITE 450 INTO TWO SUITES. SUITE 450 WILL HAVE CONFEREN | $1,116,518 |
| BLDNR-005762-2024 | 2024-04-01 | General construction | 6339 Glenwood Ave | Providence Baptist Church - Amphitheater Renovation, ASSEMBLY- Occ, IB Const 8,484sf | $0 |
| BLDNR-061051-2023 | 2024-02-01 | General construction | 3100 Smoketree Ct STE 1005 | **PONY** EXPANSION AND RENOVATION OF A 10TH FLOOR SUITE IN A 11 STORY OFFICE BLDG. 3,986 SF TOTAL AR | $438,061 |
| BLDNR-051361-2023 | 2023-12-19 | General construction | 8081 Arco Corporate Dr STE 400 | **PONY EXPRESS**PROJECT CONSISTS OF ALTERATIONS WITHIN AN EXISTING B-OCCUPANCY OFFICE SPACE. ADDITIO | $21,168 |
| BLDNR-050390-2023 | 2023-11-21 | General construction | 3401 Atlantic Ave | Alter space into 3 separate suites | $859,214 |
| BLDNR-044662-2023 | 2023-09-26 | General construction | 8010 Arco Corporate Dr STE 190 | Demo of existing file room & rework ceiling grid. Add demising wall to create stand alone suite 190 | $270,861 |
| BLDNR-034435-2023 | 2023-09-25 | General construction | 10411 Moncreiffe Rd STE 106 | Addition of restroom & enlarged storage area Suite 106 B occ 5-B 15 const 1541 sf | $119,905 |
| BLDNR-036240-2023 | 2023-09-06 | General construction | 8010 Arco Corporate Dr STE 185 | SUITE 185 1280 SF B OCC 2-B CONST PONY- Addition of walls to enclose break room, elec & lighting add | $129,754 |
| BLDNR-029583-2023 | 2023-07-18 | General construction | 8010 Arco Corporate Dr STE 230 | Brier Creek 1 Spec Suite 230 BUS- OCC, II-B CONST, 3409sf | $305,821 |
| BLDNR-031667-2023 | 2023-07-14 | General construction | 421 Fayetteville St STE 1400 | Willis Towers Watson 14th FLOOR, I-A CONST, 9447sf, BUS-OCC SUITE 1400 | $953,675 |
| BLDNR-026754-2023 | 2023-07-03 | General construction | 6601 Six Forks Rd STE 100 | North Chase II - Cii - new tenant altertion BUS-OCC, II-A OCC, 2289 sf | $214,388 |
| BLDNR-016242-2023 | 2023-05-08 | General construction | 3100 Smoketree Ct STE 215 | Synerfac 2nd Floor Office Upfit 3080SF TBR, BUS- OCC, II-B CONST | $299,530 |
| BLDNR-008863-2023 | 2023-04-29 | General construction | 8010 Arco Corporate Dr STE 200 | II-B CONST Demo of existing single tenant office space. Build out of new multitenant corridor with o | $632,007 |
| BLDNR-060031-2022 | 2022-12-29 | General construction | 8010 Arco Corporate Dr STE 185 | SUITES 180 & 185 Main Case# BLDNR-059700-2022 SUITE180 ( Demolition of existing conference room, w | $114,829 |
| BLDNR-059700-2022 | 2022-12-29 | General construction | 8010 Arco Corporate Dr STE 180 | SUITES 180 & 185 Main Case# BLDNR-059700-2022 suite 180 ( Demolition of existing conference room, | $231,721 |
| BLDNR-058374-2022 | 2022-12-16 | General construction | 8010 Arco Corporate Dr STE 175 | Demoliton of existing conference rooms to create individual private offices for new tenant B OCC 2- | $342,602 |
| BLDNR-028580-2022 | 2022-07-06 | General construction | 8020 Arco Corporate Dr STE 400 | ***PONY EXPRESS*** EXISTING SUITE 400 EXPANDING INTO A VACANT AREA ON THE FLOOR. 1821 SF Alteration | $143,604 |
| BLDNR-024568-2022 | 2022-06-28 | General construction | 3100 Smoketree Ct UNIT 400 | ALT - Ferguson 4th Floor Office Expansion - Expansion of an existing office suite into adjacent tena | $195,258 |
| BLDNR-028024-2022 | 2022-06-21 | General construction | 150 Fayetteville St UNIT 1140 | ALTERATIONS TO EXISITING OFFICE SUITES B OCC 2058 SF 1-A CONST | $183,224 |
| BLDNR-017492-2022 | 2022-04-28 | General construction | 6625 Falls Of Neuse Rd STE 015 | CHANGE OF USE FROM DANCE STUDIO TO LECTURE HALL WITH EXISTING OFFICE SPACE 8764 SF A-3 0CC 5-B CONST | $258,713 |
| BLDNR-010968-2022 | 2022-03-28 | General construction | 150 Fayetteville St UNIT 1160 | DEMOLITION OF EXISTING SUITE INTERIOR AND CONSTRUCTION OF NEW OFFICES CONFERENCE ROOM AND COFFEE ARE | $126,957 |
| BLDNR-004057-2022 | 2022-02-23 | General construction | 8045 Arco Corporate Dr STE 220 | Alteration Equagen - SUITE 220 ALTERATION OF EXISTING OFFICE SPACE FOR NEW TENANT 2-B CONST B OCC 2 | $196,519 |
| BLDNR-001476-2022 | 2022-02-23 | General construction | 301 Hillsborough St | INT COMP - NEXUS STRATEGIES - FIRST GEN UPFIT ON NINTH FLOOR OF EXISTING OFFCIE BUILDING. WORK INCLU | $183,224 |
| BLDNR-058265-2021 | 2022-02-15 | General construction | 10411 Moncreiffe Rd UNIT 105 | description: Split existing space. Install 1Hr fire rated demising wall to structural SUITE 105 B 15 | $93,276 |
| BLDNR-058561-2021 | 2022-01-24 | General construction | 8020 Arco Corporate Dr STE 400 | Sub-divide floor into two suites STE 400 . 2-B CONST B OCC 20090 SF STE 400 &STE 450 American Asset | $1,584,297 |
| BLDNR-055195-2021 | 2021-12-20 | General construction | 150 Fayetteville St UNIT 500 | Alteration of existing suites 500(220sf) and 590(6430sf). Bus- OCC, existing 28 story, 543,896SF Bu | $592,050 |
| BLDNR-050141-2021 | 2021-11-08 | General construction | 150 Fayetteville St | Alteration to existing loading dock ceiling 1-A CONST B OCC 350 SF | $31,160 |
| BLDNR-048581-2021 | 2021-11-03 | General construction | 1001 William Moore Dr STE 109 | TH EXISTING PHASE II SPACE IS EXPANDING INTO AN ADJACENT TENANT'S SPACE(SUITE 109) CREATING ONE LARG | $457,703 |
| BLDNR-048798-2021 | 2021-10-27 | General construction | 8020 Arco Corporate Dr STE 100 | "PONY"INTERIOR ALTERATION TO REPLACE BREAKROOM MILLWORK AND DEMO WALL TO CREATE OPEN OFFICE. | $412,832 |
| BLDNR-042248-2021 | 2021-10-01 | General construction | 8020 Arco Corporate Dr STE 106 | CREATE CONFERENCE ROOM AND BREAK AREA FOR POTENTIAL NEW TENANT STE 106 3830 SF B OCC 2-B CONST | $302,034 |
| BLDNR-033020-2021 | 2021-09-22 | General construction | 150 Fayetteville St UNIT 500 | 150 Fayetteville St Renovations -51012sf TBR of 29 story 550,000sf Building, Bus Occ, 1-A Const, 5th | $4,541,598 |
| BLDNR-035976-2021 | 2021-08-30 | General construction | 8020 Arco Corporate Dr | ALT - 8020 ARCO CORPORATE LOBBY RENOVATIONS to createdSuite 175 & 185 2-B CONST B OCC 1061 SF | $83,670 |
| BLDNR-034656-2021 | 2021-08-11 | General construction | 8051 Arco Corporate Dr STE 100 | ALT -AMERICAN KENNEL CLUB, MINOR ALTERATION INCLUDING DEMO OF EXISTING WALLS/DOORS AND CONSTRUCTION | $113,006 |
| BLDNR-026400-2021 | 2021-06-23 | General construction | 8521 Six Forks Rd UNIT 500 | Alteration to existing STE 500 Drees Homes, Bus - OCC, I-A Const, 8796 sf TBR, 5 story, 97,708sf Bui | $738,160 |
| BLDNR-016333-2021 | 2021-04-21 | General construction | 4800 Six Forks Rd UNIT 220 | ALT - JOHN LOCKE - INTERIOR ALTERATION TO EXPAND EXISITING CLIENT SUITE. BUS-Occ, II-B- Cons, 2,320 | $172,446 |
| BLDNR-000366-2021 | 2021-03-31 | General construction | 6339 Glenwood Ave | ALT - PROVIDENCE BAPTIST CHURCH - INTERIOR RENOVATIONS OF EXISTING CLASSROOMS 4476 SF A-3 OCC 1-B CO | $415,104 |
| BLDNR-004907-2021 | 2021-03-08 | General construction | 801 Corporate Center Dr UNIT 330 | Alteration - Beazer Homes - Bus Occ, II-B Const, 4,380sf TBR, 3 Story 89,099sf Building | $325,565 |
| BLDNR-046664-2020 | 2021-01-21 | General construction | 10880 Durant Rd UNIT 124 | ALT - RALEIGH OPHTHAMALOGY - INTERIOR ALTERATION TO EXISITNG MEDICAL OFFICE SPACE 2-B CONST B OCC ST | $279,035 |
| BLDNR-034339-2020 | 2020-11-05 | General construction | 1001 William Moore Dr STE 109 | INT COMP - ADRENAS - 1ST TIME FIT UP OF SUITE 109. 2061 SQ FT OF II-B TO BE REVIEWED. CLIENT IS SUBM | $153,194 |
| BLDNR-041167-2020 | 2020-10-28 | General construction | 2235 Gateway Access Pt UNIT 260 | build out of new tenant office suite with demising wall, conference room and break area with sink. S | $92,169 |
| BLDNR-036729-2020 | 2020-10-15 | General construction | 2300 Rexwoods Dr STE 250 | ALT - Pear Therapeutics - (6792 SF) & COMMON AREA (1160 SF ) INTERIOR OFFICE FIT-UP IN EXISTING BUI | $591,072 |
| BLDNR-037403-2020 | 2020-10-07 | General construction | 2235 Gateway Access Pt | RENOVATION OF CORRIDOR/ELEVATOR LOBBY TO PROVIDE PATH TO RESTROOMS. UPGRADE OF FINISHES, SELECTIVE | $218,530 |
| BLDNR-035838-2020 | 2020-09-16 | General construction | 2418 Blue Ridge Rd UNIT 100 | EXP Alteration Advanced Body Scan BUS- OCC, II-B CONST, 6.589SF TBR, 2 STORY 20867 SF BUILDING, ALTE | $489,760 |
| BLDNR-027221-2020 | 2020-09-07 | General construction | 2300 Rexwoods Dr | EXP - ALTERATION TO LOBBY, FIRST FLOOR CORRIDOR & FIRST FLOOR RESTROOMS OF REXWOOD V BUILDING. 2726 | $155,437 |
| BLDNR-024712-2020 | 2020-07-08 | General construction | 8045 Arco Corporate Dr STE 100 | ALTERATION - 360 Cloud Solution B OCC 3693 SF 2-B CONST 5 STORY SPPRINKLER AND STANDPIPE EXISITING | $271,916 |
| BLDNR-014904-2020 | 2020-05-29 | General construction | 8045 Arco Corporate Dr STE 200 | ALT - REDHILL BIOPHARMA - MINIMAL MODS TO EXISTING OCCUPIED SUITE 200 . DEMO AND RECONSTRUCTION OF W | $102,567 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public Raleigh permit records through 2025, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
